Requests That Util Provide NRC W/Info Provided to INPO in Resolving Concerns of Poor Performance at Plant.Resolution of INPO Issues Should Be Incorporated Into Revised Restart Schedule to Be Submitted in Apr 1988
ML20196J759
Person / Time
Site: Peach Bottom  
Issue date: 03/04/1988
From: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Everett J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
NUDOCS 8803150041
Download: ML20196J759 (3)


Text

O A

04 h(AJ? t988 i

Docket Nos.

50-277 50-278 Philadelphia Electric Company ATTN:

Mr. James L. Everett Chief Executive Officer 2301 Market Street Philadelphia, Pennsylvania 19101 Gentlemen:

Subject:

Response to PECO Letter of January 29, 1988 This letter is in response to Mr. Austin's letter of January 29, 1988 fo rwa rd-ing Mr. Pate's (INPO) January 11, 1988 letter to Mr. Harrison of the PECO Board of Directors.

We note that Mr. Pate's concerns involving poor perfor-mance at Peach Bottom encompass a number of issues which have already been identified and are being reviewed by the NRC.

As an example, improper actions by operators which led to the shutdown have been the basis of ongoirig NRC enforcement conferences with the involved licensed operators.

Nonetheless, we expect that you will be evaluating all areas of concern to Mr. Pate and that you will be formally responding to him with regard to INP0 conclusions and recommendations.

Such responses can be material to the NRC's deliberations regarding any restart of the Peach Bottom units; thus, we request that any information which PECO provides INP0 in response also be provided to this office.

Resolution of any INP0 issues which are not already included in PECO's restart plan should be incorporated into the revised schedule which as indicated by your letter of February 12, 1988 you plan to submit in April 1988.

Further, the INPO letter indicates plans for plant and corporate evaluations prior to the startup of the first Peach Bottom unit.

The NRC should be apprised by PECO of the results of those evaluations.

Thank ycu for your cooperation in this matter.

Sincerely, Oricin?l SiCnsd By IILLIA'.! T. LUSSELL William T. Russell Regional Administrator

\\4 8803150041 seoso4

() f PDR ADoCK 05000277 P

DCD

04W W Philadelphia Electric Company 2

cc:

J. Gallagher, Vice President Nuclear Services Dickinson M. Smith, Vice President, Peach Bottom Atomic Power Station John S. Kemper, Senior Vice President, Nuclear Jack Urban, General Manager, Fuels Department, Delmarva Power & Light Co.

John F. Franz, Plant Manager, Peach Bottom Atomic Power Station Troy B. Conner, Jr., Esquire W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire Thomas Magette, Power Plant Siting, Nuclear Evaluations W. M. Alden, Engineer in Charge, Licensing Section Doris Poulsen, Secretary of Harford County Council Corbin McNeil, Executive Director-Nuclear Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector Commonwealth of Pennsylvania bec:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

Section Chief, DRP Robert J. Bores, DRSS R. Martin, NRR B. Clayton, EDO l

R '/

/

7 RI D P RP RI:DRP RI: NRR RI:DRP RI:DRA RI:RA Lfnville/rhl

.ger Collins Boger Kane Allan Russell 2// 88 2/

/88 2/ /88 2/ /88 2/ /88 2/ /88 2/ /88 RI: NRR Murley 2/ /88 0FFICIAL RECDRD COPY MR. LEE EVERETTE - 0002.0.0 02/18/88

O e

g 4 gAjy g g 2

cc:

J. Gallagher, Vice President Nuclear Services Dickinson M. Smith, Vice President, Peach Bottom Atomic Power Station John S. Kemper, Senior Vice President, Nuclear Jack Urban, General Manager, Fuels Department, Delmarva Power & Light Co.

John F. Franz, Plant Manager, Peach Bottom Atomic Power Station Troy B. Conner, Jr., Esquire W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire Thomas Magette, Power Plant Siting, Nuclear Evaluations W. M. Alden, Engineer in Charge, Licensing Section Doris Poulsen, Secretary of Harford County Council Corbin McNeil, Executive Director-Nuclear Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector Ccmmonwealth of Pennsylvania bcc:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

Section Chief, DRP Robert J. Bores, DRSS R. Martin, NRR B. Clayton, EDO

  • SEE PREVIOUS CONCURRENCE

/AN

  • RI:DRP
  • RI:DRP
  • RI:NRR
  • RI:DRP
  • RI:DRA RI: RA Linville/rhl Wenzinger Collins Boger Kane Allan Russell 3/ /88 3/ /88 3/ /88 3/ /88 3/ /88 3/ /88 3/ /88 RI:NRR EDO Murley VStello 3/p/88 3/[/88 r #"

l t 'L~ e L,l 0FFICIAL RECORD COPY 71A0b W Vv grn SW