MAR 08 W
Docket No. 50-336
Northeast Nuclear Energy Company
ATTN: Mr. Edward J. Mroczka
Senior Vice President - Nuclear
Engineering and Operations-Group
P. O. Box 270
Hartford, Connecticut 06141-0270
Gentlemen:
Subject: Routine Safety Inspection 50-336/88-02 (1/1/88 - 2/8/88)
This transmits the report of the resident inspection of Millstone 2 from January
1 - February 8,1988. The inspection findings have been discussed with Mr. S. Scace
and Mr. J. Keenan of your staff.
No violations were cited, and no reply to this
letter is required.
This inspection notes, in report Detail 8.3, three events involving electrical
power losses in individual vital buses. No associated significant safety inade-
!
quacies were identified.
Nonetheless, we wish to specifically call these events
l
to your attention as a performance aspect which could be improved.
We also noted instances of improved facility performance. One was the upgraded
training and examination program for non-destructive testing (NDT) analysts in-
volved in steam generator tube Eddy Current Testing (ECT). Another was improved
performance in installing steam generator nozzle dams through careful preopera-
tional testing and detailed training.
This, along with the use of remote manipu-
lation equipment for tube pulling and NDT inside the Steam Generator Primary Chan-
nel Heads, contributed significantly to the lowering of personnel radiation ex-
.
l
posure during the refueling outage.
Thank you for your cooperation with us.
Sincerely.
Original Signed Byt
Lcell. tetteuhsuaan
Lee H. Bettenhausen, Chief
Projects Branch No. 1
Division of Reactor Projects
Enclosure: NRC Region I Report 50-336/88-02
\\
OFFICIAL RECORD COPY
DL50-336/88-02 - 0001.0.0
02/19/88
8l
eso314o40s eso3cg
'
ADOCK 0500o336
/
Q
_ - _
..
. - _ . _ .
-
-
'
.
/'
-
. , -
,
N #I N
.
.
'
Northeast Nuclear Energy Company
2
..
'
cc w/ enc 1:
W. D. Romberg, Vice President, Nuclear Operations
'
S. Scace, Station Superintendent'
'
O. O. Nordquist, Manager of Quality Assurance
R. M. Kacich, Manager, Generation Facilities Licensing
Gerald Garfield, Esquire
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
j
State of Connecticut
i
bec w/ encl:
Region I Docket Room (with concurrences)
I
'
Management Assistant, DRMA (w/o encl)
i
DRP Section Chief
'
J. Shediosky, SRI, Haddam Neck (see Details 5 and 7)
W. Raymond, SRI, Millstone 3
D. Jaffe, LPM, NRR
R. Bores, DRSS
i
E. Baker, NRR
J. Conway, NRR
R. Keimig, RI
R. Summers, RI
.
>
-
n
'
i
I
i
,
i
f
U ,* MS S l2fff f
RI:DRP
RI:DRP
RI: RP
- 61
i
Mch'be
e
nhausen
5b8"bob 7
[
Ra mond/meo
2/19/88
ed
%
8
'
!
!
0FFICIAL RECORD COPY
DL50-336/88-02 - 0002.0.0
i
02/19/88
I
,
l
!
!
_ _ _ _ . - . _ _ . _ _ . .
__ _ .
.~
.
. .
.
.