Forwards Operational Safety Team Insp Rept 50-346/87-24 on 870928-1009.Weaknesses in Operations Dept Identified
ML20196H662
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/11/1987
From: Crutchfield D
Office of Nuclear Reactor Regulation
To: Shelton D
TOLEDO EDISON CO.
Shared Package
ML20196H666 List:
References
NUDOCS 8803140012
Download: ML20196H662 (4)


See also: IR 05000346/1987024

Text

.~ ,

-

e .. . . . _ . . . . . _ .

@ g-

pw:q'og UNITED STATES

[4 g NUCLEAR REGULATORY COMMISSION

a WASHINGTON, D. C. 20666

h

%,*****p' December 11, 1987

Docket No.: 50-346

Toledo Edison Company

ATTN: Mr. Donald Shelton

Vice President Nuclear

Edison Plaza

300 Madison Avenue

- Toledo, OH 43652

Gentlemen:

SUBJECT: OPERATIONAL SAFETY TEAM INSPECTION REPORT NO. 50-346/87-24

This letter forwards the report of the Operational Safety Team Inspection

(OSTI) conducted by Mr. L. Norrholm and other NRC personnel during the

period September 28 through October 9, 1987, of activities at the Davis-Besse

Nuclear Power Station, Unit 1, authorized by NRC Operating License No. NPF-3

and to the discussion of our findings with you and other members of your

staff at the conclusion of the inspection.

The inspection consisted of an examination, on a sampling basis, of activities

in the areas of operations, maintenance, surveillance testing, safety review,

committee activities, QA and corrective action systems. To further assess

your operational performance the inspection team spent over 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in

continuous shift coverage during the inspection.

Iheinspectionteamfoundfundamentallysoundproceduresandpracticesin

{ place at the plant. The significant strengths identified by the team are

summarized in the attached inspection report. These are attributable in many

cases to the conscientious plant personnel who are carrying out the functions

inspected.

The weaknesses identified center primarily around the operations department.

Mid-level management reviews and supervision appear to have been sporadic in

recent months. In addition, the volume of administrative tasks assigned to

shift supervisors appears large. This problem is compounded by his need to

perform detailed reviews of work packages due to frequent instances of finding 1

technical problems, l

No response to this letter is required. Some of the items identifieo by the

team may be potential enforcement findings. Any enforcement actions will be  ;

identified by Region III. '

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure 1

will be placed in the NRC Public Document Room.

I

'

8803140012 871211 il

.

PDR

O

ADOCK 05000346

DCD f ,

]

. - . . . ._ . . --

>

.y ,i.

Toledo Edison Company -2- December 11, 1987

.

Should you have any questions concerning this inspection, please contact me or

Mr. L. Norrholm (301-492-9497) of this office.

i

ennis . {c fie d, irector

Division of Reactor P jects III/IV/V

and Special Projects

Office of Nuclear Reactor Regulation

Enclosure: Inspection Report 50-346/87-24

cc w/ enclosure: See next page

.

.

O

.

I

I

- _ . _ . - _ - -

__. ._. _ _ - - . . . . . .-- - . - - . .

i

o '

j

Toledo Edison Company -3- Decemtcr 11, 1987 )

1

l

cc: Donald H. Hauser, Esq. Mr. Robert M. Quillin, Director  :

The Cleveland Electric Radiological Health Program l

Illuminating Company Ohio Department of Health '

P.O. Box 5000 1224 Kinnear Road

Cleveland, Ohio 44101 Columbus, Ohio 43212

Mr. Robert F. Peters Attorney General  !

Manager, Nuclear Licensing Department of Attorney General )

Toledo Edison Company 30 East Broad Street  !

Edison Plaza Columbus, Ohio 43215 1

300 Madison Avenue  !

Toledo, Ohio 43652 Mr. James W. Harris, Director )

(Addressee Only)

Gerald Charnoff, Esq. Division of Boiler Inspection 1

Shaw, Pittman, Potts and Ohio Department of Industrial Relations

Trowbridge 2323 West 5th Avenue

2300 N Street, NW P.O. Box 825 i

Washington, DC 20037 Columbus, Ohio 43216 j

Mr. Paul M. Smart, President Mr. Harold H. Kohn

Toledo Edison Company P.O. Box 1049

300 Madison Avenue Columbus, Ohio 43266-1049

Toledo, Ohio 43652

President, Board of i

Mr. Robert B. Borsum County Commissioners of  !

Babcock & Wilcox Ottawa County

Nuclear Power Generation Port Clinton, Ohio 43452

Division

Suite 200, 7910 Woodmont Avenue State of Ohio

Bethesda, Maryland 20814 Public Utilities Commission

180 East Broad Street

O. Resident Inspector Columbus, Ohio 43266-0573 ,

U.S. Nuclear Regulatory Commission i

5503 N. State Route 2 Toledo Edison Company

Oak Harbor, Ohio 43449 Davis-Besse Nuclear Plant

ATTN: Mr. L. Storz, Plant Manager

Regional Administrator, Region III 5501 N. State Route 2

U.S. Nuclear Regulatory Commission Oak Harbor, Ohio 43449 I

799 Roosevelt Road I

Glen Ellyn, Illinois 60137 INPO l

1100 Circle 75 Parkway

'

Atlanta, Georgia 30339

l

. .- .

,

,.- ..

Toledo Edison Company -4- December 11, 1987

Distribution

!DocketoFile7"4

DRIS R/F

RSIB R/F -

JPartlow, NRR

BGrimes, NRR

USniezek, NRR

DCrutchfield, NRR-

CHaughney, NRR

JKonklin, NRR

LNorrholm, NRR

Elmbro, NRR

PCastleman, NRR

ADeAgazio, NRR

MVirgilio, NRR

GHolahan, NRR

RCooper, EDO

RDeFayette, RIII

WGuldemond, RIII

CNorelius, RIII

PDR

LPDR

Licensing Fee Management Branch l

Regional Administrators i

Regional Division Directors

ACRS (10)

GPA (3)  ;

IS Distribution (All Utility Licensees)

l

!

l

t

!

m /

OFC :RSI .HRR -RSIB:DRIS:NRR: SIB: :NRR:0DiDRIS:N /:DIR:0RW:NRR: -III,IV,V: j

...............Q....Q.i;

,

......... . .......... ......... .......

.p,

-

..............

NAME :LNo Im/vj :JK in :CHa y :BGri :JPartlow :DCrutchfield :

.........< ........... ............................ .... ...................................

DATE :11/ /87 :11/>}/87 :11/j,j/87  : /87 $/87  : 11/10/87  :

1

-