e
. . . _ . . . . . _
..
@
g-
pw:q'o
UNITED STATES
[4
g
NUCLEAR REGULATORY COMMISSION
g
h
a
WASHINGTON, D. C. 20666
%,*****p'
December 11, 1987
Docket No.:
50-346
Toledo Edison Company
ATTN: Mr. Donald Shelton
Vice President Nuclear
Edison Plaza
300 Madison Avenue
Toledo, OH 43652
-
Gentlemen:
SUBJECT:
OPERATIONAL SAFETY TEAM INSPECTION REPORT NO. 50-346/87-24
This letter forwards the report of the Operational Safety Team Inspection
(OSTI) conducted by Mr. L. Norrholm and other NRC personnel during the
period September 28 through October 9, 1987, of activities at the Davis-Besse
Nuclear Power Station, Unit 1, authorized by NRC Operating License No. NPF-3
and to the discussion of our findings with you and other members of your
staff at the conclusion of the inspection.
The inspection consisted of an examination, on a sampling basis, of activities
in the areas of operations, maintenance, surveillance testing, safety review,
committee activities, QA and corrective action systems.
To further assess
your operational performance the inspection team spent over 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in
continuous shift coverage during the inspection.
Iheinspectionteamfoundfundamentallysoundproceduresandpracticesin
{
place at the plant. The significant strengths identified by the team are
summarized in the attached inspection report.
These are attributable in many
cases to the conscientious plant personnel who are carrying out the functions
inspected.
The weaknesses identified center primarily around the operations department.
Mid-level management reviews and supervision appear to have been sporadic in
recent months.
In addition, the volume of administrative tasks assigned to
shift supervisors appears large. This problem is compounded by his need to
perform detailed reviews of work packages due to frequent instances of finding
1
technical problems,
l
No response to this letter is required.
Some of the items identifieo by the
team may be potential enforcement findings.
Any enforcement actions will be
'
identified by Region III.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
1
will be placed in the NRC Public Document Room.
'
8803140012 871211
ilf
ADOCK 05000346
,
O
]
.
.
- . . .
._
.
.
--
.y
,i.
>
Toledo Edison Company
-2-
December 11, 1987
.
Should you have any questions concerning this inspection, please contact me or
Mr. L. Norrholm (301-492-9497) of this office.
i
ennis
{c fie d,
irector
.
Division of Reactor P jects III/IV/V
and Special Projects
Office of Nuclear Reactor Regulation
Enclosure:
Inspection Report 50-346/87-24
cc w/ enclosure:
See next page
- .
.
O
.
. . .
- - .
. .
. .
.--
- . - - .
.
- _ . _
. - _ - -
i
j
o
'
Toledo Edison Company
-3-
Decemtcr 11, 1987
cc: Donald H. Hauser, Esq.
Mr. Robert M. Quillin, Director
The Cleveland Electric
Radiological Health Program
Illuminating Company
Ohio Department of Health
'
P.O. Box 5000
1224 Kinnear Road
Cleveland, Ohio 44101
Columbus, Ohio 43212
Mr. Robert F. Peters
Attorney General
Manager, Nuclear Licensing
Department of Attorney General
)
Toledo Edison Company
30 East Broad Street
Edison Plaza
Columbus, Ohio 43215
1
300 Madison Avenue
Toledo, Ohio 43652
Mr. James W. Harris, Director
)
(Addressee Only)
Gerald Charnoff, Esq.
Division of Boiler Inspection
Shaw, Pittman, Potts and
Ohio Department of Industrial Relations
Trowbridge
2323 West 5th Avenue
2300 N Street, NW
P.O. Box 825
Washington, DC 20037
Columbus, Ohio 43216
j
Mr. Paul M. Smart, President
Mr. Harold H. Kohn
Toledo Edison Company
P.O. Box 1049
300 Madison Avenue
Columbus, Ohio 43266-1049
Toledo, Ohio 43652
President, Board of
i
Mr. Robert B. Borsum
County Commissioners of
Babcock & Wilcox
Ottawa County
Nuclear Power Generation
Port Clinton, Ohio 43452
Division
Suite 200, 7910 Woodmont Avenue
State of Ohio
Bethesda, Maryland 20814
Public Utilities Commission
180 East Broad Street
O.
Resident Inspector
Columbus, Ohio 43266-0573
,
U.S. Nuclear Regulatory Commission
i
5503 N. State Route 2
Toledo Edison Company
Oak Harbor, Ohio 43449
Davis-Besse Nuclear Plant
ATTN:
Mr. L. Storz, Plant Manager
Regional Administrator, Region III
5501 N. State Route 2
U.S. Nuclear Regulatory Commission
Oak Harbor, Ohio 43449
799 Roosevelt Road
Glen Ellyn, Illinois 60137
1100 Circle 75 Parkway
'
Atlanta, Georgia 30339
. .-
.
-.
- ,.-
..
,
Toledo Edison Company
-4-
December 11, 1987
Distribution
!DocketoFile7"4
DRIS R/F
RSIB R/F
-
JPartlow, NRR
BGrimes, NRR
USniezek, NRR
DCrutchfield, NRR-
CHaughney, NRR
JKonklin, NRR
LNorrholm, NRR
Elmbro, NRR
PCastleman, NRR
ADeAgazio, NRR
MVirgilio, NRR
GHolahan, NRR
RCooper, EDO
RDeFayette, RIII
WGuldemond, RIII
CNorelius, RIII
LPDR
Licensing Fee Management Branch
Regional Administrators
i
Regional Division Directors
ACRS (10)
GPA (3)
IS Distribution (All Utility Licensees)
t
!
/
m
OFC :RSI
.HRR -RSIB:DRIS:NRR: SIB:
- NRR:0DiDRIS:N
/:DIR:0RW:NRR:
-III,IV,V:
j
...............Q....Q.i;
,
......... .
..........
.........
.......
.p,
..............
-
NAME :LNo
Im/vj :JK
in
- CHa
y
- BGri
- JPartlow
- DCrutchfield :
.........< ........... ............................ ....
...................................
DATE :11/ /87
- 11/>}/87
- 11/j,j/87
/87
$/87
- 11/10/87
1
-
- . .
- - - - -
-
. -
.
-