8*
3 l
l GPU Nuclear. Inc.
(
Route 441 south NUCLEAR Post Office Box 480 Middletown. PA 17057-0480 Tel 717-944-7621 November 25,1998 1920 20581 U. S. Nuclear Regulatory Commission Att: Document ControlDesk Washington,DC 20555 Gentlemen
Subject:
Three Mile Island Nuclear Station, Unit No.1 (TMI-1)
Docket No. 50-289 Operating License No. DPR-50 Long Range Planning Program (LRPP)
Annual Update ofIntegrated Schedule "ABC" Project Listing Pursuant to License DPR-50 Condition No. 2.c.9, GPU Nuclear (GPUN) Inc. hereby submits the required annual update of projects listed in each category (A, B, and C) as defined by the LRPP integrated schedule. The attachments to this letter include: 1) the ABC project listing; and,2) a summary of changes since the last submittal forwarded by GPUN Letter No. 6710-97-2451-1, dated November 23,1997. An abstract of the attachments follows:
1.
Attachment A - A new project listing ofCategory A, B, and C projects annotated by an asterisk (*) to identify new projects and by a double asterisk (") to identify changes in Budget Authorization (B/A) number assignments. Completed projects have been removed from the schedule listing. Remaining projects are ongoing or are scheduled consistent with cycle / year commitments. Any changes in schedule are reflected on Attachments A and B. One Category A project las been added to the schedule which was previously a Category B project.
I
.: -(
,j u 4
9812090119 981125 l
PDR ADOCK 05000289 01 P
PDR 0
l r
_. _ _ _ _ _ = _. _ _ _ _ _ _
'1920 '20581 Page 2 2.
Attachment B - A summary listing of Category A and B projects which have been completed, deferred, changed in scope, or otherwise changed with explanations, as appropriate.
The Attachment B listing also contains Category C project completions. Please note that changes to the Category C scope or schedule do not impact the Category A and B schedules.
l' l
Pursuant to the LRPP for TMI-1, GPU Nuclear will assume that the NRC is in agreement with j
the above Category A and B changes, unless we'are notified otherwise within 15 days of l
receipt. If additional information is needed, please contact Mr. Gregory M. Gurican, of TMI l
Site Licensing at (717) 948-8753.
i l
Sincerely, N
James W. Langenbach L
Vice President and Director, TMI i
JWUgmg l.
Attachments l
File Na 98170 l
I L
cc:
Administrator, Region 1 L
TMI-1 Senior Project Manager TMI Senior ResidentInspector i
4 1
I a.
t I
i
r j
i 1
ATTACIIMENT A TMI-l PROJECT LISTING INTEGRATED SCIIEDULE ANNUAL UPDATE (NOVEMBER,1998) i l
I
-1 PROJECT LISTING LEGEND NRC INTEGRATED' S C H E=D U L E NEW PROJECTS
- - BA NUMBER CHANGE CATEGORY
'A' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 11/20/98 l
OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS 1 417109
- THERMO-LAG BARRIER MODIFICATION 97-99 NRR CB R281 R308 R346 INSTALL MODS AS REQ'D TO BRING INSTALLED THERMO LAG 330-1 FIRE BARRIER SYSTEMS INTO COMPLIANCE W/10CFR50 APPENDIX R i
e
1 PROJECT-LISTING TMI LEGEND N R C-INTEGRATED SCHEDULE NEW PROJECTS
- BA NUMBER CHANGE CATEGORY
'B' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 11/20/98 OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS 2
120026 OTSG EDDY CURRENT TESTING - 13R 13R NRR DRGA DRGB OSF ECT OF 100% OF TUBES WITH BOBBIN COIL WITH ADDITIONAL MRPC INSPECTIONS.
SCOPE ALSO INCLUDES TUBE REPAIRS / PLUGGING 3
120027 PIPE WALL THINNING MONITORING 13R NRR AUGMENTED INSPECTIONS TO DETECT EROSION /
CORROSION DEGRADATION OF SINGLE AND TWO PHASE SYSTEMS REF. GL89-08 I
4 120046 ISI INSPECTIONS (13R) 13R NRR AB CWPH IB RB PERFORM ASME SECTION XI AND AUGMENTED INSPECTIONS.
5 123321 REACTOR BLDG TENDON SURVEILLANCE PROG 13R NRR PROVIDE CONTRACTOR AND PLANT SUPPORT FOR SURVEILLANCE PROGRAM.
REF. NUREG 135.1;TS 4.4.2.1 l
t J
i
- TMI - 1 PROJECT LI' STING
~
LEGEND NRC INTEGRATED S C'H E D U L E' NEW PROJECTS
- BA NUMBER CHANGE 4
CATEGORY
'B' PROJECTS (Continued) i SORT BY CATEGORY / CYCLE /BA STATUS AS OF 11/20/98
[
I OBS=
BA.
DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS f
6 120026 OTSG EDDY CURRENT TESTING 14R NRR DRGA DRGB OSF ECT OF 100% OF. TUBES WITH BOBBIN COIL f
WITH ADDITIONAL MRPC INSPECTIONS.
SCOPE ALSO INCLUDES TUBE REPAIRS / PLUGGING
-F 7 120027 PIPE WALL THINNING MONITORING 14R NRR AUGMENTED INSPECTIONS TO DETECT EROSION /
CORROSION DEGRADATION OF SINGLE AND TWO i
PHASE SYSTEMS. REF GL 89-08
.i
[
8 120046 ISI INSPECTIONS 14R NRR~
PERFORM ASME SECTION XI AND AUGMENTED INSPECTIONS.
t l
t 4
a
- TMI - 1 PROJECT LISTING LEGEND NRC INTEGRATED SCHEDULE NEW PROJECTS
- BA NUMBER CHANGE CATEGORY
'B' PROJECTS (Continued)
' SORT BY CATEGORY / CYCLE /BA STATUS AS OF 11/20/98 OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS 9
120054 OUTAGE 14R REACTOR VESSEL ISI 14R NRR R346 PERFORM 10 YEAR REACTOR VESSEL ISI USING REMOTE ROBOTICS AND PERFORMING VISUAL INSPECTION 10 120026 OTSG EDDY CURRENT TESTING 15R NRR DRGA DRGB OSF ECT OF 100% OF TUBES WITH BOBBIN COIL WITH ADDITIONAL MRPC INSPECTIONS.
SCOPE ALSO INCLUDES TUBE REPAIRS / PLUGGING PIPE WALL THINNING MONITORING 15R NRR 11 1.20027 AUGMENTED INSPECTIONS TO DETECT EROSION /
CORROSION DEGRADATION OF SINGLE AND TWO PHASE SYSTEMS. REF GL 89-08 12 120046 ISI INSPECTIONS 15R NRR AB CWPH IB RB PERFORM ASME SECTION XI AND AUGMENTED INSPECTIONS.
TMI - 1 PROJECT L I'S T I N G' LEGEND NRC INTEGRATED SCHEDULE NEW PROJECTS
- BA NUMBER CHANGE CATEGORY
'B' PROJECTS (Continued) a SORT BY CATEGORY / CYCLE /BA STATUS AS OF 11/20/98 OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS 13 412679 REPLICA PLANT PROCESS COMPUTER REPLACEME 96-00 NRR INSTALL A NEW RPPC TO INTERFACE WITH THE SIMULATOR AND PERFORM SIMILAR FUNCTIONS AS THE PPC (RG 1.149) i 14 120038 YEAR 2000 COMPLIANCE SPECIFIC O&M SUPPOR 98 MRC/NRR ALL' SUPPORT ADDITIONAL TECHNICAL ASSISTANCE IN ASSESSING REMEDIAL / REPLACEMENT ACTIONS TO ALLEVIATE Y2K PROBLEMS 15 410042 SIMULATOR MODS '98 98-02 NRR ALL TO MAKEMODIFICATIONS TO THE SIMULATOR TO ENSURE COMPARISON WITH CONTROL ROOM l
i I
6 1
4 m.-.
m
T'M I - 1 PROJECT LIST'ING
' LEGEND NRC INTEGRATE-D SCHEDULE NEW PROJECTS
'BA NUMBER CHANGE
-[
CATEGORY
'C' PROJECTS t
SORT BY CATEGORY / CYCLE /BA STATUS AS OF 11/20/90 OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER
- YEARS 16' 410034 ROOF REPLACEMENT 1998 TO 2000 12
'MRC REPLACE ROOFS THAT HAVE REACHED END OF LIFE INCLUDING, LOWER AUX BLDG, EDG BLDG CNTRL & FUEL HANDLING BUILDING v
b 17 410036 HIGH TEMPERATURE ISOLATION OF LETDOWN LINE 12 MRC AB DESIGN AND INSTALL A HIGH TEMPERATURE SENSOR TO INSTALL ON LETDOWN PIPING TO SIGNAL CLOSURE FOR HU-V-2A/B & MU-V-3 COMPUTER ACCESS CONTROL SYSTEM UPGRADE /R 12 MRC/NRR' 18 410055 REPLACE SERVERS AND EQUIPMENT SUPPORTING THE COMPUTER ACCESS CONTROL SYSTEM TO CORRECT Y2K PROBLEMS 19 412690 CABLE DRIVE SYSTEM FOR FUEL TRANSFER 12 MRC INSTALL ONE FUEL TRANSFER CARRIAGE CABLE DRIVE SYSTEM i
i i
m.
_____m___._____.m.___,__.___._m_.__m_____
m.
-.--.m
- m. m w-u
-e-
TMI - '1 PROJECT LISTING
' LEGEND NRC INTEGRATED S C'H E D U L E NEW PROJECTS
- BA NUMBER CHANGE.
t CATEGORY
'C' PROJECTS (Continued)
SORT BY CATEGORY / CYCLE /BA STATUS AS OF 11/20/98 OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS 20 120001 RB PRESERVATION 13R MRC RB PRESERVATION OF VARIOUS AREAS, PIPING, AND SUPPORTS IN THE REACTOR BUILDING 21 123MMM OTHER OUTAGE RELATED ACTIVITIES 13R ALL ALL L
OUTAGE RELATED ACTIVITIES SUCH AS INSPECTIONS, REPAIRS, SURVEILLANCES MINOR MODIFICATIONS, MOD SUPPORT, ETC.
i 22 123335 REPLACE MAIN STEAM LINE INSULATION 13R MRC T322 T355 REPLACE DEGRADING INSULATION ON MAIN STEAM LINE 23 123346 REACTOR REFUELING 13R MRC LOAD FUEL ASSEMBLIES FOR 650 EFPD I
z
-.-,---,,e--
.-..-r--.
e TMI - 1 PROJECT LISTING LEGEND NRC INTEGRATED SCHEDULE NEW PROJECTS
- BA NUMBER CHANGE
.i CATEGORY
'C' PROJECTS (Continued)
SORT BY CATEGORY / CYCLE /BA STATUS AS OF 11/20/98' t
f OBS BA DESCRIPTION' CYCLE /
CLASSIFICATION.
i NUMBER YEARS 24 410039 REFURBISH NATURAL DRAFT COOLING TOWERS 13R MRC NDCT PERFORM MAJOR REPLACEMENT OF MATERIAL ON THE NDCTS TO MITIGATE DEGRADATION &
MAINTAIN MATERIAL CONDITION.
i TMI HP PACKING / SPILL STRIP REPLACEMENT 13R HRP 25 410050 T355 i
INSTAL NEW DESIGN PACKING AND SPILL
[
STRIP ON HP TURBINE 26 120053 RC-P-1C ROTATING ELEMENT REPLACEMENT 13R MRC f
DRGB REPLACE THE ROTATING ELEMENT AND REPAIR THE LEAKING MAIN FLANGE GASKET i
27 412677 COMPLETE RERACKING SPENT FUEL POOL A 14 NRR l
FHB l
FABRICATE, DELIVER, INSTALL 6 RACKS &
LICENSE SUBMITTAL,REFURB GPU EQUIP &
ENHANCE LIFT CAPABILITES @ NORTH END
~_ -,.
TMI-l PROJECT LISTING LEGEND-NRC INTEGRATED-SCHEDULE NEW PROJECTS
' ** BA NUMBER CHANGE
[
CATEGORY
'C' PROJECTS (Continued)
SORT BY CATEGORY / CYCLE /BA STATUS AS OF 11/20/98 OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS 28 120001 RB PRESERVATION 14R MRC RB PRESERVATION OF VI! - AREAS, PIPING,
- .CTOR BUILDING AND SUPPORTS IN THi t
.29 410039 REFURBISH NATURAL DRAFT-COOLING TOWERS 14R.
MRC NDCT PERFORM MAJOR REPLACEMENT OF MATERIAL ON THE NDCTS TO MITIGATE DEGRADATION &
MAINTAIN MATERIAL CONDITION.
30 120001 RB PRESERVATION 15R MRC i
RB PRESERVATION OF VARIOUS AREAS, PIPING, AND SUPPORTS IN THE REACTOR BUILDING 31 410039 REFURBISH NATURAL DRAFT COOLING TOWERS ISR MRC NDCT PERFORM MAJOR REPLACEMENT OF MATERIAL ON THE NDCTS TO MITIGATE DEGRADATION &
l MAINTAIN MATERIAL CONDITION.
32 128114 EPRI STEAM GENERATOR STRATEGIC MGMT PROJ 88-98 MRC CO-FUNDING FOR EPRI SGMP.
l m..
--T M - I
-'1 PROJECT LISTING
' LEGEND NRC INTEGRATED SCHEDULE NEW PROJECTS
- BA NUMBER CHANGE CATEGORY
'C' PROJECTS (Continued)
SORT BY CATEGORY / CYCLE /BA STATUS AS OF.11/20/98 OBS BA DESCRIPTION CYCLE /
CIASSIFICATION NUMBER YEARS 33 126109 BWOG GLRA PROGRAM 93-98 MRC PARTICIPATE IN AND PROVIDE SUPPORT FOR THE BWOG GENERIC LICENSE RENEWAL APPLICATION (GLRA) PROGRAM 34 128175 ASSMNT & UPGRD OF UNDRGRND TANKS / PIPING 93-98 ERR 1-ASSESS APPLIC TANK / PIPE SYS. 2-INIATE 7
TEST & MONITORING.
3-UPGRADE AS REQD.
'I (REF 40 CFR 112) 35 128177 THERMO-LAG FIRE BARRIER EVALUATIONS 93-99 NRR
[
t SUPPORT EVALUATIONS OF THERMO-LAG 330-1 FIRE BARRIER SYSTEMS TO ACHIEVE COMPLI-l ANCE W/ 10CFR50 APP R AT TMI-1 f
36 412619 PLANT PROCESS COMPUTER UPGRADE 93-99 IOE CR OSF UPGRADE' PLANT PROCESS COMPUTERS CPU AND IPU BOARDS (18) WITH A SINGLE BOARD.
5 37 128228 B&W OWNERS GROUP 96-03 REL PARTICIPATION IN THE B&W OWNERS GROUP PROGRAM f
.~.?
9-T M'I - 1 PROJECT LIS' TING LEGEND N R'C INTEGRATED SCHEDULE NEW PROJECTS
^
- BA NUMBER CHANGE CATEGORY 'C'. PROJECTS (Continued)
SORT BY CATEGORY / CYCLE /BA STATUS AS OF 11/20/9 L OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS 38 128215 TMI 12R REACTOR CAVITY DOSIMETRY ANALYSI 96-98 NRR REPLACE THE CAVITY DOSIMETRY DURING 12R.
TRANSPORT, ANALYZE AND REPORT RESULTS.
t 39 120036 EVALUATE LINE BREAKS IN AUXILIARY BUILDING 97/98 NRR t
PERFORM ENGINEERING EVALUATION TO SUPPORT RESOLUTION OF AUX STEAM & LET-DOWN LINE BREAKS IN AUX BLDG 40 120043 AOV PROGRAM 98/99 MRC DEVELOP A DATABASE FOR AOV INFORMATION TO ASSIST IN VALVE TESTING t
41 410049 YEAR 2000 CAPITAL IMPROVEMENTS 98/99 MRC y
PROVIDE FOR YET TO BE IDENTIFIED CAPITAL EXPENDITURES ASSOCIATED WITH Y2K I
42 410052 INSTALLATION OF RISK ASSESMENT SOFTWARE 98/99 REL INSTALL ORAM AND SENTINEL RISK MANAGEMENT SOFTWA I
~ --- --
~
ABCClassific tions i
'a)
. htert NRC Reauirements (NRR) - Activities that a) must be canied out to fulfill l
- specific NRC requirements or b) have been committed to the NRC by the Company or c) are such that if not accomplished would result in an NRC non-compliance even though the specific activity is not required by the NRC.
l b)
Meet Environmental Requirements (ERR) - Activities that a) are specifically required I
by environmental regulatory agencies (State and Federal) or b) have been committed to environmental agencies by the Company or c) are such that if not accomplished would result in a regulatory non-compliance even though the specific activity is not required by an environmental regulatory agency.
r j
c)
Meet Other Reauirements (ORR) - Activities not covered by the NRC or l
environmental requirements but that are required by local, state, or federal ordinances, l
codes, court order or lawsuit settlement, or other guidance to which the Company is committed or ifnot accomplished would result in a violation of that ordinance, code or guidance, court order, etc.
l d)
Increase Safety Maruins (ISM) - Activities that, ifimplemented, will improve nuclear I
plant or personnel safety but are neither required for regulatory compliance nor required by safety regulations, codes or guidance.
e)
Decrease Environmental Effects (E) - Activities that, ifimplemented, will result in an improved emironmental quality but are neither required for regulatory compliance nor required by environmental regulations, codes or guidance.
f)
Improve Radiological Conditions (RAD) - Activities that, ifimplemented, will result in improved radiological conditions, lower man-rem exposure rates, or radwaste control / reduction but are neither required for regulatory compliance nor required by
)
radiological regulations, codes or guidance.
i g)
Maintain Reliability / Capability (MRC) - Activities that, if implemented, will maintam power production at existing levels by preventing deterioration of plant systems or l
equipment. Includes activities in response to national codes and standards, insurance i
policies, equipment vendor specifications or nuclear industry high unavailability l
equipment data without which the plant could not operate prudently.
1 h)
Improve Reliabilitv/ Capability (REL) - Activities that, if implemented, will increase power generation by improving availability or capacity factor to maximize energy output.
l
ABC Classificctions (continued) i)
Improve Operational Effectivener.3 (IOE) - Activities that, ifimplemented, will improve staff efliciency or provide a direct economic payback in terms of reduced operating / maintenance costs.
j)
Improve Personnel Facilities (FAC) - Activities that, if implemented, will improve working conditions and the usefulness of personnel facilities.
k)
Provide Contingency / Blanket (CUI) - Activities that, if implemented, will provide management flexibility to respond in a timely manner to emergent work requirements or the ongoing requirements to procure, replace or repair minor items essential to support routine operations.
1)
Improves Heat Rate Performance (HRP) - Activities, that, ifimplemented, will increase power production by enhancing the heat rate efliciency.
m)
. General Working Conditions (GWC) - Activities, tools, and equipment that if implemented will improve working conditions, but will not demonstrate a direct economic payback l
l l
l l
l
ATTACHMENT B l
CHANGES TO TMI-I NUCLEAR GENERATING STATION ~
INTEGRATED SCHEDULE ANNUAL UPDATE (November 1998) l Category "A" Projects Additions:
As denoted by a
- next to the project title.
Completions:
None Deletions:
None l
l l
l l
i I
t
.m.
ATTACHMENT B (Centinued)
Category "B" Projects Additions:
As noted by a
- next to the project title.
i Completions:
412552 Modifications for Seismic Qualification - Scope completed during the 12R Outage.
I Deletions:
417109 Thermo-Lag Barrier Modifications - This project is now categorized as a Category A project in this update.
B/A Changes:
123345 OTSG Tube Plugging - 13R and future outage scope now included in B/A 120026 419292 Simulator Modifications - Project has been assigned 410042 as the new Budget Activity.
l
I l
ATTACIIMENT B (C :titued)
Category "C" Projects Additions:
As noted by a
- next to the project title l
1 i
Completions:
None Deletions:
None i
1 1
l l