UNITED STATES g
NUCLEAR REGULATORY COMMISSION 5
'l WASHINGTON, D. C. 20555
\\...*/
, LOUISIANA POWER AND LIGHT COMPANY DOCKET 'l0. 50-382 WATERFORD STEAM ELECTRIC STATION, UNIT 3 AMENOMENT TO FACILITY OPERATING LICENSE Amendment No. 31 License No. NPF-38 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Louisiana Power and Light Company (the licensee) dated December 11, 1987, as supplemented December 22, 1987, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; 8.
The facility will operate in conformity with the application, i
the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; i
D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
8903110160 080304 PDR ADOCK 05000382 P
. 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No.
NPF-38 is hereby amended to read as follows:
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 31, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION 4,Cdw Jose A. Calvo, Director Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: March 4, 1988 i
i i
ATTACHMENT TO LICENSE APEFDPENT NO. 31 TO FACILITY CPERATING LICENSE NO. NPF-38 DOCKET N0. 50-382 Peplace the following pager of the Appendix A Technical Specifications with the attached pages. The revised pages are identified by Amendment number and contain vertical lines indicating the areas of change. The corresponding overleaf pages are also provided to maintain document completeness.
Remove Insert 3/4 3-49 3/4 3-49 3/4 3-52 3/4 3-52*
3/4 3-53 3/4 3-53 4
I l
l
- Amendment Nurber was inadvertently marked out when issued as an overleaf page to Arendment No. 24 Page reissued correctly.
T r
_y e
INSTRUMENTATION FIRE DETECTION INSTRUMENTATION LIMITING CONDITION F'OR OPERATION-3.3.3.8 As a minimum, the fire detection instrumentation for each fire detec-tion zone shown in Table 3.3-11 shall be OPERABLE.
APPLICABILITY: Whenever equipment protected by the fire detection instrument is required to be OPERABLE.
ACTION:
With any, but not more than one-half the total in any fire zone a.
Function A fire detection instruments shown in Table 3.3-11 inoperable except for the annulus, restore the inoperable instrument (s) to OPER-l ABLE status within 14 days or within the next I hour establish a fire watch patrol to inspect the zone (s) with the inoperable instrument (s) at least once per hour, unless the instrument (s) is located inside the containment, then inspect that containment zone at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or monitor air temperature at least once per hour at the locations listed in Specification 4.6.1.5.
b.
With more than one-half of the Function A fire detection instruments in any fire zone shown in Table 3.3-11 inoperable except for the l
annulus, or with any function B fire detection instruments shown in Table 3.3-11 inoperable, or with any two or more adjacent fire detec-tion instruments shown in Table 3.3-11 inoperable, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> establish a fire watch patrol to inspect the zone (s) with the inoper-able instrument (s) at least once per hour, unless the instrument (s) is located inside the containment, then inspect that containment zone at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or monitor air temperature at least once per hour ct the locations listed in Specification 4.6.1.5.
With both annulus detection instruments inoperable, restore at least c.
1 detector to operable status or within the next I hour establish a fire watch patrol to inspect the zone at least once per eight hours.*
d.
The provisions of Specification 3.0.3 and 3.0.4 are not applicable.
SURVEILLANCE REQUIR2MENTS 4.3.3.8.1 Each of the above required fire detection instruments which are accessible during plant operation shall be demonstrated OPERABLE at least once per 6 months by performance of a CHANNEL FUNCTIONAL TEST.
Fire detectors which are not accessible during plant operation shall be demonstrated OPERABLE by the performance of a CHANNEL FUNCTIONAL TEST during each COLD SHUT 00WN exceeding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless performed in the previous 6 months.
4.3.3.8.2 The NFPA Standard 720 supervised circuits supervision associated with the detector alarms of each of the above required tire detection instruments which are accessible during plant operation shall be demonstrated OPERABLE at least once per 6 months.
Circuits which are not accessible during plant opera-tion shall be demonstrated OPERABLE during each COLD SHUTOOWN exceeding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unlesa performed in the previous 6 months.
- Fire watch patrol may be temporarily suspended during performance of 1
Specification 4.6.6.1.a.
WATERFORD - ; NIT 3 3/4 3-49 AMENDMENT NO. 25, 31
INSTRUMENTATION FIRE DETECTION INSTRUMENTATION SURVEILLANCE REQUIREMENTS (Continued) 4.3.3.8.3 The nonsupervised circuits associated with detector alarms between the instrument and the control room shall be demonstrated OPERABLE at least once per 31 days.
4.3.3.8.4 Each of the resistor wires required by Table 3.3-11 shall be demonstrated OPERABLE at least once per 6 months by verifying the proper wire resistance.
f l
WATERFORD - UNIT J 3/4 3-50
TABLE 3.3-11 FIRE DETECTION INSTRUMENTS TOTAL NUMBER OF INSTRUMENTS
- ELEVATION HEAT FLAME SMOKE ZONE ROOM NAME/ NUMBER (ft)
,(xjy), B//y] (x/y) 1.
REACTOR AUXILIARY BUILDING RAB 1A Main Control Panels 1,2,3,4,6,7,8,35,36 +46 10/0 RAB 1A Control Room Proper /304
+46 20/0 RAB 1B Emergency Equip. H&V Room /314
+46 0/12 RAB 10 Computer Room (above raised floor)/306 +46 5/0 Computer Room (below raised floor)/306 +46 0/7 RAB 2 Ventilation Equip. Room /299
+46 0/36 RAB 3 RAB Corridor to Relay Room /261
+35 0/1(3) 4/0 RAB HVAC Switchgear Equip. Room /323
+46 0/10 RAB 3A RAB Battery Exhaust Fan Room /406
+69 0/2 RAB 4 Cable Vault /260
+35 0/27 RAB 5 Electrical Penetration Area "A"/263
+35 0/13 RAB 6 Electrical Penetration Area "B"/263A
+35 0/14 RAB 7 Relay Room /262
+35 (3) 12/0 Isolation Panels (9 Compartments
+35 2/0
- 2 per comp. )
RAB 8A High Voltage Switchgear Room "A"/212A
+21 0/1(1) 18/0 RAB 8B Electrical Equip. Room /225B and High
+21 0/1(2) 28/0 Voltage Switchgear Room "B"/212 480V Switchgear 3A32 Room
+21 (2) 2/0 RAB 8C High Voltage Switchgear Room
+21 (1) 8/0 "A-B"/212B RAB 8E CEA M/G Set Room /216
+21 2/0 RAB 9 Remote Shutdown Panel Room /217
+21 1/0 RAB 11 Battery Room "B"/213
+21 2/0 RAB 12 Battery Room "AB"/214A
+21 2/0 RAB 13 Battery Room "A"/214
+21 2/0 RAB 15 Emergency Diesel Gen. "B" Room /222
+21 0/1 RAB 15A Emergency Diesel Gen. "B" Feed TK
+46 0/1 Room /328A RAB 16 Emergency Diesel Gen. "A" Room /221
+21 0/1 RAB 16A Emergency Diesel Gen. "A" Feed Tk,
+46 0/1 Room 328A RAB 17 CCW Heat Exchanger "B"/236
+21 0/4 RAB 18 CCW Heat Exchanger "A"/220
+21 0/4 RAB 19 CCW Pump "A"/235
+21 0/2 l
+21 0/2 RAB 21 CCW Pump "B"/233
+21 1/0 RAB 23 Corridor to CCW Pumps /218 Corridor
+21 0/39 to CCW Heat Exchangers/219 and Corridor to Emergency Olesel Gen./225A (1) Common Resistor Wire (2) Common Resistor Wire (3) Common Resistor Wire WATERFORD - UNIT 3 3/4 3-51 AMENDMENT NO.15, 24
~.
TABLE 3. 3-1R (Continued)
FIRE DETECTION IN51ffENTS TOTAL NUMBER OF INST R'JME NT 5' ELEVATION HEAT FLAME SMOKE ZONE R00H NAME/ NUMBER (ft) 1x4y.2 1.idf.l (*/ )
Y 1.
REACTOR AUXILIARY BUILDING (Continued)
RAB 25 Equip. Access Area /226 (wing area) t21 15/0
+7 0/6 RAB 27A H&V Room /124 RAB 278 Electrical Area and Health Physics
"+7 0/35 Offices /122 RAB 27C I&C Room /120
+, 7 0/6
{
RAB 270 Coenunications Equip. Room /123
+7 1/0
.4 0/24 RAB 31 Corridors and Passageways Corridors on eastside
-9 0/21 RAB 32 Wing Area westside - Auxiliary Com-
-05 32/0 ponent Cooling Water Pump "A"/853 and Pipe Penetration Area /B100
-4 Wing Area Center /B53 and 8100
-35 &
28/0
-4 Wing Area eastside-Component Cooling
-35 31/0 Water Pump "B"/B53 and Pipe Penetration Area /8100 ti4 RAB 33 S/0 Cooling Heat Exchangers A&B/820 i l5 -
0/18
& 848 RAB 34 Valve Operating Enclosure Bay Room J> 15.5 2/0
' M)!5.5 "A"/854 4/0 Valve Operating Enclosure Bay Room "B"
BSSA RAB 35 Safety Injection Pump Room B/816
-35 10/0 RAB 36 Safety Injection Pump Room A/815
-35 10/0 0/1 RAB 37 Motor-Driven Emergency Feedpump f
35 "A"/B49A RAB 38 Motor-Driven Emergency Feedpump
.,-k!
1/0
<.(
"B"/8498 RAB 39 General Equipment Area /85, 12, 13
-36,
0/10
& 49 Corridors & General Equip. Areas /BS, h.15 0/28 1, 2, 3, 4, 39, 40, 41, 42, 44 & 46 East Corridor & General Equip. Areas /
-35 0/15
)
B17, 23 & 25 I
4/0 BA Make-up Tank "A"/838
-35 BA Make-up Tank "B"/853A
-35
/
4/0 RAB 40 Diesel Storage Tank "A"/850
-35
/
3/0 3/0 RAB 41 Diesel Storage Tank "B"/B52
-35 j
'[
t Amendment No. 3 WATERFORD - UNIT 3 3/4 3-52
> f, (.
'/
i Nr+m
/
TABLE 3.3-11 (Continued)
FIRE DETECTION INSTRUMENTS TOTAL NUMBER OF INSTRUMENTS
- ELEVATION HEAT FiAME SMOKE ZONE ROOM NAME/ NUMBER (ft)
(x/y)
M (x/y) 2.
REACTOR CONTAINMENT BUILDING **
RCB 1 Annulus /420***
2;
+46 2/0 l
y RCB 2 Electrical Penetratio'n Ana /,
+21 24/0 RCB 3 Electrical Penetration Arda 3
+21 21/0 RCB 4 Reactor Catie Trays
+46 16/0 CT 1&3 Wet & Dry Cooling Tower "A" Cable Tray 1/0 CT 2&4 Wet & Dry Cooling Tower "B" Cable Tray 1/0 l
3.
FUEL HANDLING BUILDING 1
FHB 2' Purification Pump Room /8155, Fuel Pool
+1
-10/0
[
Pump "A"/8157, Fuel Pool Pump "B"/
l
B156, Fuel Pool Heater Exchanger /
s-
/ B158 and Access Area /B-161
[EmergencyFilterTrain.JJnit/8152
+1 6/0 Emergency Elect. Equip' Room /8151
+1 1/0 4.
CHARC0AL AIR FILTER UNITS
-l E-35 (3A-54) FHB Emergency Filter Train "A"
+1 1/0 E-35 (3B-SB) FHB Emergency Filter Train "B"
+1 1/0 E 17 (3A-SA) Shield Building Ventilation
+46 1/0 l
System Filter Train "A" E-17 (3B-58) Shield Building Ver.tilation
+46 4 1/0 System Filter Train "E?
l E-23 (3A-SA) Controlled Ventilation Area
+46 1/0 System Filter Train "/."
E-23 (3A-SB) Controlled Ventilation, Area
+46 1/0 Systen F i \\ter Train "B" S-8 (3A-SA) Control Room Emerg'en'cy Filter Train "A" i
'i.
1/0
. 46
+
r S-8 (38-58) Control Room Emergency Filter b46 1/0 I l, /
Train "B" TABLENQATIONS
- (x/y):
x is the number of Function A (early warning fire detection and l
notification only) instruments.
1 y is the number of Function A (actuation of fire suppression systems and early warning and notification) instruments.
f r
1 l
- The fire detection instruments located within the containment are not required l
to be OPERABLE during the performance of Type A containment leakage rate tests.
- Annulus detection is provided by smoke detectors' mounted on the duct of the Annul n Negative Pressure System, iThis segment of duct is physically located i
in the hAB H&V Equipment Room (299).
WATERFORD - UNIT 3 3/4 3-53 AMEN 0HENT NO. 25, 24, 31 i
N,.
n.
3 y,;.
~
m
(\\
,s
.e i
If t
}.}
- ., p s y i : 1c., C
+
y LOOSE ;3' 0[1EC110h IN$iRUPENTATION t IM11 N CONW.10N FOR OPERAT ION -
3.3.3.9 The loose pa t cetection sysle :is %11 be OPER4BLE.
i AP P t l C ABi t.l T Y:
NODES '2;and'2.
e c
ACT 10N:
w With ene or more loose pait, de:ectio.fi System channels inoperable for a.
more than 30 days, prepart and submit a Special Report--ta the Commission pursuant to Specification 6.9.2 within the next 10 days outlining the cause'of' the malfunction and the plans f or restoring the channel (s) to OPERABLE status, s
The provisions of Specifications 3.0.3 tr>d 3.0.4 are not applicable.
b.
I 1.1 l
SU8tVElttANCE REQUIREMENTS
- 4. 3. 3. 9 Each channel bf; the Itose-part detection syst.o shall be demonstrated OPERABLE by performance of:
4.
a CHANNEL CHECK at least once per 24 houra, l
b.
4 CHANNEL FUNCTIONAL TEST at least once per 31 day:., and a CHANNEL ML18 RATION at least once per 18 months.
c.
l
.+
i l
i il
't
\\#!ERFORD
- UNIT 3 3/4 3*54 i