ML20196G849
| ML20196G849 | |
| Person / Time | |
|---|---|
| Issue date: | 04/06/1999 |
| From: | Diaz N NRC COMMISSION (OCM) |
| To: | Vietticook A NRC OFFICE OF THE SECRETARY (SECY) |
| Shared Package | |
| ML20196G781 | List: |
| References | |
| FRN-64FR14814, RULE-PR-73 SECY-99-008-C, SECY-99-8-C, NUDOCS 9907010281 | |
| Download: ML20196G849 (1) | |
Text
r NOTATION VOTE RESPONSE SHEET TO:
Annette Vietti-Cook, Secr tary FROM:
COMMISSIONER DIAZ
SUBJECT:
SECY-99-608 - RULEMAKING PLAN, " PHYSICAL SECURITY / SAFEGUARDS FOR PERMANENTLY SHUTDOWN POWER REACTORS," FOR AMENDMENTS TO 10 CFR PART 7F Approved xx Disapproved Abstain Not Participating _
COMMENTS:
I approve Option 3. In developing the proposed rule, the staff should maximize the use of risk insights *o establish performance criteria that are commensurate with the need to protect public health and safety. The rule should be structured to permit decommissioning plants to make security modifications on the basis of technical and risk analyses, and to inform the NRC when such modifications have been implemented. The performance criteria should be linked with those of other rules under development, such as the rulemaking for emergency planning requirements for permanently shutdown nuclear power plants.
J
~
SIGP(ATUREJ 4/ ( /99 DATE Entered on "AS" Yes XX No 9907010281 990629 PDR COMMS NRCC CORRESPONDENCE PDR QS070\\ 07d k