Forwards Insp Rept 50-416/98-13 on 980920-1031 & Notice of Violation Re Failure to Follow Procedures Associated with Partial Unlatching of Tool Ring During Heavy Lift Over Recently Refueled Reactor in May 1998
ML20196F099
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 12/01/1998
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Eaton W
ENTERGY OPERATIONS, INC.
Shared Package
ML20196F105 List:
References
50-416-98-13, NUDOCS 9812040201
Download: ML20196F099 (6)


See also: IR 05000416/1998013

Text

.-

.

.

,

- -.

..

. ~ ~ - -

-

,

- - - -

-~ -.

- - - - -

-- - - - --

-

l

'

&" "' GW

UNITED ST AT ES

/

t

NUCLEAR REGULATORY COMMISSION

.

(

'

c<

?

l

{-

i ,_ i

REGION IV

'

c

$

, , . ,P[

611 RYAN PLAZA DRIVE, SUITE 400

l

4

9

AR LINGTON. TEXAS 76011-8064

L

DEC - 1 1998

!

William A. Eaton, Vice President

Operations - Grand Gulf Nuclear Station

Entergy Operations, Inc.

!

P.O. Box 756

L

Port Gibson, Mississippi 39150

i

SUBJECT: NRC INSPECTION REPORT 50-416/98-13 AND NOTICE OF VIOLATION

Dear Mr. Eaton:

From September 20 through October 31,1998, an NRC inspection was conducted at your

Grand Gulf Nuclear Station reactor facility. The enclosed report presents the scope and results

of that inspection.

During the 6-week period covered by this inspection, your conduct of activities at the Grand

Gulf facility was generally characterized by safety-conscious operations, sound engineering and

maintenance practices, and careful radiological work controls. However, the inspection

l

identified two violations consisting of a failure to implement corrective actions following

Refueling Outage 9 for known deficiencies in containment grating and four examples of failure

'

to follow procedures associated with the partial unlatching of a tool ring during a heavy lift over

the recently refueled reactor in May 1998. The second violation is of concern because the

failures to follow procedures posed an increased risk of dropping a heavy load over the reactor

core.

The violations are cited in the enclosed Notice of Violation (Notice) and the circumstances

surrounding the violations are~ described in detailin the enclosed report. The NRC has

-

concluded that information regarding the reason for the first violation and the corrective actions

taken and planned to correct the violation and prevent recurrence are already adequately

addressed on the docket in the subject NRC Inspection Report 50-416/98-13. Therefore, you

I

are not required to respond to the first violation unless the description therein does not

accurately reflect your corrective actions or your position. In that case, or if you choose to

provide additional information, you should follow the instructions specified in the enclosed

Notice. Please note that you are required to respond to the second violation and should follow

the instructions specified in the enclosed Notice when preparing your response. This response

is required because the violations were not identified through the investigations you held onsite

and have not been entered into your corrective action program. The NRC will use your

response, in part, to determine whether further enforcement action is necessary to ensure

compliance with regulatory requirements.

l

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

l

enclosures, and your response will be placed in the NRC Public Document Room (PDR).

l

1

9912O40201 981201

W

PDR

ADOCK 05000416

e

PDR

_

.

- -

_

.

_ _

l

.

.

Entergy Operations, Inc.

-2-

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

k-

J

Thomas P. Gwy n. Dir tr

Division of Rea or Pr e ts

1

Docket No.:

50-416

License No.: NPF-29

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

50-416/98-13

cc w/ enclosures:

Executive Vice President

i

and Chief Operating Officer

)

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

Wise, Carter, Child & Caraway

P.O. Box 651

Jackson, Mississippi 39205

Winston & Strawn

1400 L Street, N.W. - 12th Floor

Washington, D.C. 20005-3502

Sam Mabry, Director

Division of Solid Waste Management

Mississippi Department of Natural

Resources

P.O. Box 10385

Jackson, Mississippi 39209

President

Claiborne County Board of Supervisors

l

Port Gibson, Mississippi 39150

l

l

l

1

o

Entergy Operations, Inc.

-3-

General Manager

Grand Gulf Nuclear Station

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, Mississippi 39150

The Honorable Richard Leyoub

Attorney General

Department of Justice

State of Louisiana

P.O. Box 94005

Baton Rouge, Louisiana 70804-9005

Office of the Governor

State of Mississippi

Jackson, Mississippi 39201

,

,

Mike Moore, Attorney General

,

Frank Spencer, Asst. Attorney General

1

State of Mississippi

P.O. Box 22947

Jackson, Mississippi 39225

Dr. F. E. Thompson, Jr.

State Health Officer

State Board of Health

P.O. Box 1700

Jackson, Mississippi 39205

Robert W. Goff, Director

State Liaison Officer

Division of Radiation Health

Mississippi Department of Health

P.O. Box 1700

Jackson, Mississippi 39215-1700

Vice President

Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

Director, Nuclear Safety

and Regulatory Affairs

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, Mississippi 39150

l

l

t

r

i

I

j

o

i

'

Entergy Operations, Inc.

-4-

j

i

Vice President Operations

i

Grand Gulf Nuclear Station

Entergy Operations, Inc.

P.O. Box 75S

Port Gibson, Mississippi 39150

I

l

l

i

l

l

!

!

!

l

l

.

-

.

.

-

-. _ _ _

1

l

l

i

,

,

DEC - 1 1998

!

Entergy Operations, Inc.

-5-

E Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bec to DCD (IE01)

!

bec distrib. by RIV:

Regional Administrator

Resident inspector

,

DRP Director

DRS-PSB

i

Branch Chief (DRP/A)

MIS System

Project Engineer (DRP/A)

RIV File

Branch Chief (DRP/TSS)

i

.

j

l

i

- DOCUMENT NAME: R:\\_GG\\GG813RP.JLD

To receive copy of document, Indicate in box: 'C' - Copy without enclosures *E" = Copy with enclosures "N" = No copy

J

C:DRP/V

RIV: SRI:DRP/A

,/

RI:GG

_ f

SRI:RBS

J. EB:DRS

r

JLDixon-Herrity PTL PJAlter PToA GDReplogle F PAGoldbefP

JITapi8h ,

I

V

11/3d98

11/W98

11M98

11hd98

11 29

. = =

g

um

-. ==

semigiu smalFsimmesi!= :::s!=a

Y

i:is:a

=

D:DRP

_ J

TPGwynn (lf /

11/l/98

~

j

OFFICIAL RECORD COPY

_

.

__

- _ _ _ _ _ _

. . _ _ _ _

_ __

. . .

_

.

.__ _

-

!

,

.-

DEC - 1 1998

i

~ Entergy Operations, Inc.

-5-

.

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

.

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

.

i

bec to DCD (IE01)

]

bec distrib. by RIV:

Regional Administrator

Resident inspector

'

DRP Director

DRS-PSB

Branch Chief (DRP/A)

MIS System

,

-Project Engineer (DRP/A)

RIV File

Branch Chief (DRP/TSS)

l

,

DOCUMENT NAME: R:\\_GG\\GG813RP JLD

To receive copy of document, indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy

RIV: SRI:DRP/A _.s

Rl:GG

.7

SRl:RBS l,g. EB:DRS dA

C:DRP/Af '

l

JLDixon-Herrity #TL PJAlter FToA GDReplogleF PAGoldbefij"

JITapiM /,

11/ d98

11/429W

l

11/3498

11/M98

11/r/98

3

"

D:DRP

_ t)

_

.

TPGwynn (l/ /

!

11/l/98

~

!

OFFICIAL RECORD COPY

-

i

-040017

I