ML20196F006

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs 3/4.7.14, Area Temp Monitoring
ML20196F006
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/21/1988
From:
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20196F004 List:
References
NUDOCS 8807050015
Download: ML20196F006 (3)


Text

__.

i

_P! ANT JYSTEMS JM 3] Jggg 3/4.7.14 AREA TEMPERAT'lRE MONITf tWG

)

LIMITING CONDITION FOR OPERATION 3.7.14 The temperature limit of each area shown in Table 3.7-6 shall not be exceeded.

APPLICABILITY: Whenever the equipment in an affected area is required to be OPERABLE.

ACTION:

With one or more areas exceeding the temperature limit (s) shown in Table 3.7-6:

By less than 20 F and for less than 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, record the cumulative a.

time and the amount by which the temperature in the affected area (s) exceeded the limit (s).

b.

By less than 20*F and for more than 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, prepare and submit to the Commission within 30 days, pursuant to Specification 6.9.2, a Special Report that provides a record of the cumulative time and the amount by which the temperature in the affected area (s) exceeded the limit (s) and an analysis to demonstrate the continued OPERABILITY of the affected equipment.

The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.

\\

With one or more areas exceeding the temperature limit (s) shown in c.

Table 3.7-6 by more than 20 F, prepare and submit a Special Report t

as required by ACTION b. above and within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> either restore i

the area (s) to within the temperature limit (s) or declare the equip-ment in the affected area (s) inoperable.

I SURVEILLANCE REQUIREMENTS 4.7.14 The temperature in each of the areas shown in Table 3.7-6 shall be determined to be within its limit at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

il I

MILLSTONE - UNIT 3 3/4 7-44 I

i 8807050015 880621 PDR ADOCK 05000423 P

PDC RU

TABLE 3.7-6 Ibbb AREA TEMPERATURE MONITORING

\\_

AREA TEMPERATURE LIMIT ('F) 1.

AUXILIARY BUILDING AB-02, VCT and Boric Acid Transfer Pump Area,'El 43'6" 1 120 AB-03, Charging Pump Area, El 24'6" s 110 AB-04, General Area, El 66'6" 1 120 AB-06, General Area, El 43'6" 1 120 AB-07, General Area, El 4'6"

$ 120 AB-08, General Area (East), El 4'6" 1 120 AB-09, General Area (South), El 4'6" 1 120 AB-10, General Area, El 4'6" 1 120 1

AB-11, General Area El 43'6" 1 120 i

AB-13, General Area (North), El 4'6"

$ 120 AB-16, Supplemental Leak Collection Filter Area, El 66'6" 1 120 AB-19, MCC/ Rod Drive Area, El 24'6" 1 120 AB-21, MCC Air Conditioning Room, El 66'6" 1 120 A'B-22, Rod Drive Area, El 43'6"

$ 120 AB-25, Charging Pump Area, El 24'6" 1 110 AB-26, RPCCW Pump Area, El 24'6"

$ 110

\\

AB-29, General Area (Southeast), El 24'6" i 120 AB-33, Boric Acid Tank Area, El 43'6" 5 120 AB-35, Boric Acid Tank Area, El 43'6"

$ 120 AB-39, Fuel Building and Auxiliary Building Filter Area, El 66'6" i 120 MILLSTONE - UNIT 3 3/4 7-45

~

Table 3.7-6 (Continued)

AREA TEMPERATURE MONITORING AREA IDiP_{RATURE LIMIT ( F) 2.

CONTROL BUILDING CB-01, Switchgear and Battery Rooms, El 4'6"

$.104 CB-02, Cable Spreading Room, El 24'6"

.5110 CB-03, Control and Computer Rooms, El 47'6" 5. 95 CB-04, Chiller Room, El 64'6" I104 CB-05, Mechanical Equipment Room, El 64-6" 1 104 3.

CONTAINMENT CS-01, Inside Crane Wall, El all except CS-03 and CS-04

$120 CS-02, Outside Crane Wall, El all

.5120 CS-03, Pressurizer Cubicle, El all 5130 CS-04, Inside Crane wall, El 51'4" except CS-03 and steam 6_120 generator enclosures 4.

INTAKE STRUCTURE CW-01, Entire Building 5._.110 5.

DIESEL GENERATOR BUILDING DG-01, Entire Building 5 120 6.

ESF BUILDING ES-01, HVAC and MCC Area, El 36'6" 4 110 ES-02, SIH Pump Area, El 21'6" 4 110 ES-03, Pipe Tunnel Area, El 4'6" 4 110 ES-04, RHS Cubicles, El all 4 110 ES-05, RSS Cubicles, El all 4 110 ES-06, Motor Driven Auxiliary Feedwater Pump Area, El 24'-6" d 110 ES-07, Turbine Driven Auxiliary feedwater Pump

.4 110 Area, El 24'6" MILLSTONE - UNIT 3 3/4 7-46 i