ML20196E879

From kanterella
Jump to navigation Jump to search
Responds to 860327 Request to Withhold GE Rept, Tech Spec Improvement Analysis for Reactor Protection Sys for Edwin I Hatch Nuclear Plant,Unit 1, from Public Disclosure Per 10CFR2.790.Request Acceptable
ML20196E879
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 02/24/1988
From: Crocker L
Office of Nuclear Reactor Regulation
To: James O'Reilly
GEORGIA POWER CO.
References
NUDOCS 8803010362
Download: ML20196E879 (2)


Text

,

,. # g >R*ttyy'[o, ,

UNITED STATES

! o NUCLEAR REGULATORY COMMISSION

$ ,I wAsHmorow. o. c. 2 ossa 8 February 24, 1988

%, . . . . . ,o Occket Nos.: 50-321 50-366 Mr. James P.0'Reilly Senior Vice President - Nuclear Operations Georgia Power Corrpany P.O. Box 4545 Atlanta, Georgia 30302

Dear Mr. O'Reilly:

SUBJECT:

Request for Withholding Infomation from Public Disclosure By application dated March 27, 1986, Georgia Power Company (GPC) submitted the General Electric report entitled "Technical Specification improvement Analysis for the Reactor Protection System for Edwin I. Hatch Nuclear Plant, Unit 1," MDE-75-0485, dated April 1985, and requested that it be withheld from public disclosure pursuant to 10 CFR 2.790. GPC subsequently submitted General Electric's affidavit dated September 3,1987.

The affidavit stated that the submitted infonnation should be considered exerot from mandatory public disclosure for the following reasons:

1. The infonnation has consistently been held in confidence by General Electric.
2. No public disclosure of the information has been made.
3. The information is not available in public sources.

4 Public disclosure of the infonnation would cause substantial harm to the competitive position of General Electric.

We have reviewed your application and the material based on the requirements and criteria of 10 CFR 2.790 and, on the basis of General Electric's statements, have determined that the submitted infonnation sought to be withheld contains trade secrets or proprietary corrinerical infomation.

Therefore, the Technical Specifications improvement Analysis for the Reactor Protection System for Edwin I. Hatch Nuclear Plant, Unit 1, marked as proprietary, will be witheid from public disclosure pursuant to 10 CFR 2.790 (b)(5) and Section 103 (b) of the Atomic Energy Act of 1954, as amended.

k P

kDOC

^

s. N'

/

Mr. James P. O'Reilly , >

Withholding from public inspection shall not affect the right, if any, If of persons properly and directly concerned to inspect the documents.

the need arises, we may send copies of this'information to our consu working in this area.

-signed the appropriate agreements for handling proprietary infomation.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection. you should promptly notify the NRC. -

You should also understand that the NRC may have cause to review this detemination in the future, such as, if the scope of aInFreedom all reviewof Infomation Act request includes your infomation.

situations, if the NRC makes a detemination adverse to the above, you will be notified in advance of any public disclosure.

Sincerely. .

'l J

Lawrence P. Crocker, Project Manager Project Directorate II-3 Division of Reactor Projects, I/II Distribution _:

Docket File NRC Pl;R Local PDR l PRC System PDf23 Reading 4 MRood LCrocker

- ACRS (10)

OGC/WF Glainas EJordan JStone l

b 3 d o *3 1-3 f

/PDf!I-3/DRP.!/II QD PDill-3/DRP-I/II "

l ES ker Acting PD

/88 PD4'6d/m/DRP-I/II MRd ac 4<LCrocker 02/ F /88 02/d/88 02/

02/// /88 l

t

-