Submits Annual Rept of Challenges to Main Steam Line Safety/Relief Valves (Srvs) for 1987.Reactor Scram on 870224 Caused Unplanned Challenges to SRVs H & P.Srv J Stuck Open & Replaced During 871010 Test of Acoustic Monitoring Test
ML20196E762
Person / Time
Site: Hope Creek 
Issue date: 02/16/1988
From: Labruna S
Public Service Enterprise Group
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8803010284
Download: ML20196E762 (1)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _

J l

Pubhc Service Electric and Gas Company P.O. Box L Hancocks Bridge, New Jersey 08038 Hope Creek Operations

[

t February 16, 1988 United States-Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

ANNUAL REPORT TECHNICAL SPECIFICATION 6.9.1.5 HOPE CREEK GENERATING STATION DOCKET NO. 50-354 i

This Annual Report of Challenges to Main Steam Line Safety / Relief Valves (SRVs) is being submitted pursuant to the requirements of Technical Specification 6.9.1.5 for the year 1987.

During

1987, Hope Creek Generating Station (HCGS) experienced one (1) unplanned challenge to SRVs "H" and "P"

I as a result of a reactor scram on 2/24/87 (Ref:

Licensee

[

Eveat Report 87-017-00).

A planned lifting of all SRVs occurred on 10/10/87 following completion of a

scheduled j

maintenance outage to verify the operation of the acoustic i

monitoring system.

During the course of this evolution, SRV i

"J" stuck open, and was subsequently replaced (Ref: Licensee Event Report 87-047).

I Should you have any questions or comments on this submittal, i

do not hesitate to contact us.

i r

Sincerely, NH W S. LaBruna i

General Manager-Hope Creek Operations i

i

/E.-

R

/tib

(

C: Distribution j

l 8803010284 800216 PDR ADOCK 05000354 i

R PDR gQ\\

l

\\ 0 i

The Energy People 1

wu w,,

-