Forwards Insp Rept 50-213/88-19 on 880928-1115.No Violations Noted.Plant Containment Has Not Met Integrated Leak Rate Test Acceptance Criteria in as-found Condition During Two Most Recent Tests,As Noted in Detail 10 of Encl Rept
ML20196E571
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 12/02/1988
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20196E575 List:
References
NUDOCS 8812120039
Download: ML20196E571 (2)


See also: IR 05000213/1988019

Text

'

", ,b ; \\' . . .

.

DEC 0 21983

Docket / License:

50-213/0PR-61

Connecticut Yankee Atomic Power Company

ATTN: Mr. E. J. Mroczka

Senior Vice President - Nuclear

Engineering and Operations

7. Box 270

..tford, Connecticut

06141-0270

Gentlemen:

Subject:

Resident Inspection 50-213/88-19 (9/28/88 - 11/15/88)

This transmits the findings of the routine NRC inspection of the Haddam Neck Plant

by Mr. J. T. Shediosky and Ms. A. A. Asars.

The findings have been discussed with

Mr. D. B. Miller of your staf f.

No violations were identified and no reply to this letter is required.

We observed the use of a personal computer programmed for plant specific thermal

hydraulic analysis in the Corporate Emergency Operations Center during the recent

Emergency Planning Exercise. This appeared to be a powerful calculational tool.

Cavelopment of this capability was a noteworthy positive performance initiative.

As noted in Detail 10 of the enclosed report, during the two mcot recent tests,

the Haddam Neck containment has not met integrated leak rate t.est acceptance cri-

teria in the as-found condition. Unless relief is justified and obtained, an

integrated leak rate test is consequently required during every refueling outage

or approximately every 18 months, whichever occurs first, until two consecutive

tests meet the acceptance criteria.

Your cooperation with us is appreciated.

Sincerely,

ORIGtt

SIGNED BY

f/o

fhc

. $

Lee H. Bettenhausen, Chief

Projects Branch No. 1

Division of R m '.or Projects

Enclosure:

NRC Region I Report 50-213/88-19

.

OFFICIAL RECORD COPY

IR HN 88-19 - 0001.0.0

gg

11/29/80

ss1212003o 801202

)

DR

ADOCK 0500

13

/

'

,

s :

'

i

" . . .. .. . .

.

,

Northeast Nuclear Energy Company

2

DEC 011988

'

cc w/ encl:

W. D. Romberg, Vice President, Nuclear Operations

D. B. Miller, Station Superintendent

D. O. Nordquist, Director of Quality Services

R. M. Kacich, Manager, Generation Facilities Licensing

Gerald Garfiald, Esquire

Public Document Room (PDR)

Local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

Section Chief, DRP

W. Raymond, SRI, Millstone

A. Wang, LPM, NRR

R. Bores, DRSS

' ' , Lazarus, DRSS

E. Kelly, DRP (see Detail 9)

P. Eapen, DRS

RI:DRP

RI: RP

R

RP

,

@h

,

'

Shediosky

McCabe

Bet grausen

Luf9/88

g11\\

p{t

tth

0FFICIAL RECORD COPY

IR HN 88-19 - 0002.0.0

11/29/80

l