Forwards Insp Rept 50-309/88-16 on 881006-1119.No Violations Noted.Nrc Concerns About Number of Wiring Discrepancies Identified During Outage & Interest in Understanding Root Cause/Causes of Problems & Resolution of Discrepancies
ML20196E538
Person / Time
Site: Maine Yankee
Issue date: 12/05/1988
From: Wiggins J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Randazza J
Maine Yankee
Shared Package
ML20196E543 List:
References
NUDOCS 8812120031
Download: ML20196E538 (2)


See also: IR 05000309/1988016

Text

..

."

.

DEC 051988

1

l

Docket No. 50-309 License No. DPR-36

Maine Yankee Atomic Power Company

ATTN: Mr. J. B. Randazza

President

83 Edison Drive

Augusta, Maine 04336 ,

Subject: NRC Region I Inspection Report No. 50-309/88-16

,

'

Gentlemen:

This transmits the October 6 to November 19, 1988, routine inspection findings

of Mr. C. Holden and Mr. R. Freudenberger at the Mainc Yankee Atomic Power

Plant, Wiscasset, Maine. Those findings were based on observations of activ-

ities, interviews, and document reviews, and have been discussed with

Dr. Boulette of your staff.

Within the scope of this inspection, no violations were observed. Overall,

control of outage activities appears good. Planning and outage coordination

activities are working well and the reduction in control room activities has

benefited the operating crew. Major surveillance tests such as containment

i

integrated leak rate testing and oddy current inspection of number 1 steam

'

generator had good oversight,

i We are concerned, however, about a number of wiring discrepancies identified by

the plant during this outage. In addition to the individual resolution of

these discrepancies, we are interested in understanding the root cause/causes

l

of these problems.

l

No reply to this letter is required. Your continued cooperation with us in

thi: matter is appreciated.

l

l

Sincerely.

ORIGINAL S!GNED BY

'

JAMES T. EGGINS

James T. Wiggins, Chief

Reactor Projects Branch No. 3

Division of Reactor Projects

l

Enclosure:

NRC Region ! Inspection Report No. 50-309/88-16

0FFICIAL RECORD CC ' - 0001.0.0

,

-

p

881217'sO31 801205

PDR ADOCK 03000309 _

l

0 PDC

__ __ ._ _

,

..

.'

,

Maine Yankee Atomic Power Company 2 DEC 051988

cc w/ enc 1:

C. D. Frizzle, Vice President, Operations

J. H. Garrity, Vice President, Quality Programs and Engineering

Dr. E. T. Boulette, Plant Manager

P. L. Anderson, Project Manager

G. O. Whittier, licensing Section Head

J. A. Ritsher, Attorney (Ropes and Gray)

P. Ahrens, Esquire

Public Document Room (POR)

local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Maine

bec w/ enc 1:

Region ! Docket Room (with concurrences)

Management Assistant, ORMA (w/o enc 1)

J. Wiggins, ORP

L. Tripp, ORP

0. Limroth, DRP

P. Wilson, DRP

H. Eichenholz, SRI - Yankee

P. Sears, NRR

R. Bores, DRSS

M. Conner, DRP

QI /

, Rd.hP R DAP RI:0RP

Mfolden/mjd LTripp 'JWiggins

/

l12/l/88 12/ l/83 12/.6 /83 l

OFFICIAL RECORO COPY IR MY SS-16 - 0002.0.0

12/01/88