DEC 051988
1
l
Docket No. 50-309
License No. DPR-36
Maine Yankee Atomic Power Company
ATTN: Mr. J. B. Randazza
President
83 Edison Drive
Augusta, Maine 04336
,
Subject:
NRC Region I Inspection Report No. 50-309/88-16
,
'
Gentlemen:
This transmits the October 6 to November 19, 1988, routine inspection findings
of Mr. C. Holden and Mr. R. Freudenberger at the Mainc Yankee Atomic Power
Plant, Wiscasset, Maine. Those findings were based on observations of activ-
ities,
interviews,
and document
reviews,
and have been discussed with
Dr. Boulette of your staff.
Within the scope of this inspection, no violations were observed.
Overall,
control of outage activities appears good.
Planning and outage coordination
activities are working well and the reduction in control room activities has
benefited the operating crew.
Major surveillance tests such as containment
integrated leak rate testing and oddy current inspection of number 1 steam
i
'
generator had good oversight,
i
We are concerned, however, about a number of wiring discrepancies identified by
the plant during this outage.
In addition to the individual resolution of
these discrepancies, we are interested in understanding the root cause/causes
l
of these problems.
l
No reply to this letter is required.
Your continued cooperation with us in
thi: matter is appreciated.
l
l
Sincerely.
ORIGINAL S!GNED BY
JAMES T. EGGINS
'
James T. Wiggins, Chief
Reactor Projects Branch No. 3
Division of Reactor Projects
l
Enclosure:
NRC Region ! Inspection Report No. 50-309/88-16
0FFICIAL RECORD CC
' - 0001.0.0
,
-
p
881217'sO31 801205
ADOCK 03000309
l
0
_
__
__
._ _
,
.'
..
,
DEC 051988
Maine Yankee Atomic Power Company
2
cc w/ enc 1:
C. D. Frizzle, Vice President, Operations
J. H. Garrity, Vice President, Quality Programs and Engineering
Dr. E. T. Boulette, Plant Manager
P. L. Anderson, Project Manager
G. O. Whittier, licensing Section Head
J. A. Ritsher, Attorney (Ropes and Gray)
P. Ahrens, Esquire
Public Document Room (POR)
local Public Document Room (LPOR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Maine
bec w/ enc 1:
Region ! Docket Room (with concurrences)
Management Assistant, ORMA (w/o enc 1)
J. Wiggins, ORP
L. Tripp, ORP
0. Limroth, DRP
P. Wilson, DRP
H. Eichenholz, SRI - Yankee
P. Sears, NRR
R. Bores, DRSS
M. Conner, DRP
QI
/
, Rd.hP
R DAP
RI:0RP
Mfolden/mjd
LTripp
'JWiggins
l12/l/88
/
12/ l/83
12/.6 /83
l
OFFICIAL RECORO COPY
IR MY SS-16 - 0002.0.0
12/01/88