lillitt NRC OPERAi!N STATUS REPORT COMPLETED BY REACTOR EMIMERING litill:
- 1. DOCKET.... 50-423 OPERAi!NGSTATUS
- 2. REPORTIN6 PE9100... JANUARY 1998 OUTAE + ONLINE HOUR $..
744
+ 0 e 744
- 3. UTILITY CONTACT.................A. L. ELMS 2034445388 1881118818881
- 4. LICENSED TMS.RMAL P0utR.........................................
3411 iMILL$iONEI
- 5. NAMEPLATE PAi!N6 (IROSS Mut)...................................
1,253 MW l (;Nii 3 8
- 6. KS!9N ELECTRICAL RAi!NG ( E T MWE).............................
1,153.6 4811111188881
- 7. MI! MUM DEPENDARE C APACITY (IROS$ Mut )........................ 1,197. 0
- 8. MIIMUM KPEUARE CAPACITY ( NET Mut).......................... 1,141.9 9.
IF CHANGES OCCUR AB0VE SINCE LAST REPORT, REAiONS ARE...........
N/A 10.POKRLEVELTONHICHRESTRICTED,IFANY(NETMWE)...............N/A
!!.REASONFORRESTRICil0N,IFANY....N/A MONTH YEAR TO HTE CUMULATIVETODATE 33333 333333333333 333838333888333333 12.HOURSINREPORf!N6 PERIOD 744.0 744.0 15,576.0
- 13. NUMMR OF WURS THE REACTOR WAS Crit! CAL 0.0 0.0 11,763.5
- 14. REACTOR RESERVE SWTDOWN HOURS 0.0 0.0 226.0
- 15. HOURS E NERATOR DNLINE 0.0 0.0 11,590.5
- 16. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 17.SRCSSTHERMALENER6YSENERATED(MWH) 0.0 0.0 38,279,432.4 ti. 6ROSS ELECTRICAL EER6Y HNERATED (MWH) 0.0 0.0 13,209,273.0
- 19. NET ELECTRICAL ENER6Y E NERATED (MWH)
-B,987.1 8,987.1 12,594,644.8 20.UN!iSERVICEFACTOR 0.0 0.0 74.4 21.UNITAVAILAllLITYFACTOR 0.0 0.0 74.4
- 22. UNIT CAPACITY FAtiDR (USING MDC NET) 0.0 0.0 70.7
- 23. UNIT CAFACliY FACTOR (USIN6 M R NET) 0.0 0.0 70.1
- 24. UNIT FORCED OUTASE RATE 0.0 0.0 0.5
- 25. UNIT FORCED OUTAE HOURS 0.0 0.0 1,074.5 SHUID0m$ SCHEDULED OVER NEli Sil MONTHS (TYPE, DATE, AND DURAi!0N OF EACH)..............
N/A IF M RENTLY SHUIDOH, ESTIMATED STARTUP DATE...... February 10 1988 l
8802170269 880131 PDR ADOCK 05000423 R
PDR l
l
7_
t 4
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. __fo-m UNIT tittla+ma Unit 3 DATE n 02-1988 CQtPLETED BY LJ. tLas it3 444 53M M0tf!H JANUARY DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY PGIER LEVEL (tWE-NET)
(lWE-NHT) 1 0
16 0
2 0
17 0
3 0
18 0
4 0
19 0
5 0
20 0
6 0
21 0
7 0
22 0
8 0
23 0
9 0
24 0
10 0
25 0
11 0
26 0
12 0
27 0
13 0
28 0
14 0
29 0
15 0
30 0
31 0
c-
~,
y.
r
~., ;,,.p
- % I P
3j
~
UNIT SHUTDOWNS AND POWER REDUCTIONS.
,L 1'*._,'..'
^
DOCKET NO. $0-423'
' ' T '3E '
~
UNIT Millstone Unit No. 3 -
'DATE February 3. 1988 -
3 COMPLETED BY A. Eles
- TELEPHONE (203) 444-5388
. REPORT MONTH JANUARY 1988
.Page l'of-1' 4
Method of Licensee-
--Cause and Corrective' Duration Shutting-
-Event.
System Component Action toa No.
Date Type (1) (Hours)
Reason (2)
Down Reactor (3) Report #
Code
~ Code'-
Prevent Recurrence.-
87-12 1-01-88 5
744 C
1 N/A N/A' N/A Shutdown continuation' -
from last month..
-Refuel. outage.
1 2
3' F:
Forced Reason:
-Method:
Exhibit G Instructions 5: Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test-2 - Manual Scram
' Entry Sheets for C - Refueling 3 - Automatic Scram Licensed Event Report D - Regulatory Restriction 4 - Continued from' (LER) File-(NUREG-0161)-
~
E - Operator Training &' License previous month
~
Examination-
'5 - Power Reduction 5 F - Administrative (Duration = 0)..
Exhibit 1 - Same Source-G - Operational Error (Explain) 9 - Other (Explain)
H - Other (fxplain)
'N ss I
e s
g General Othcote
- Seiden Street, Berlin. Connecticut 9
.iI
',,5EIEuw=~.
P.O. Box 270
- a**""=*(
J 'J,[3'[ U C."c,'. C "',
HARTFORD, CONNECTICUT 06141-0270 k
L (203) 665-5000 February 10. 1988 MP-11498 Re:
U. S. Nuclear Regulatory Commission Document Control Desk r
Washirigton, D. C. 20555
Reference:
Facility Operating License No. NPF-49 Docket No. 50-423
Dear Sir:
[ts aw)rdance with reporting requirements of Technical Specifications Sectiori 6. 9.1. 5, the Millstone Nuclear Power Station - Unit 3 Monthly Cperating Report 88-2 covering operations for the month of January is hereby forwarded.
t Yours truly, s
NORTHEAST NUCLEAR ENERGY COMPANY fcf}ktn 41V Stephen E. Scace Station Superintendent Millstone Nuclear Power Station SEi/AE:jlm Attachment cc:
Regional Administrator, Region I W. J. Raymond, Senior Resident Insraectnr i
- f 1
M l