ML20196D570

From kanterella
Jump to navigation Jump to search
Forwards Exam Repts 50-424/OL-88-02 & 50-425/OL-88-02 Administered on 880919-22
ML20196D570
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 11/25/1988
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20196D574 List:
References
NUDOCS 8812090134
Download: ML20196D570 (2)


Text

. - . ._

1:ovember ?.5, 1988 Georgia Power Cos4.ny ATTN: Mr. W. G. > irston, III Senior Vice Presidant Nuclear Operations P. O. Box 4545 Atlanta, GA 30302 Gentlemen:

SUBJECT:

V0GTLE ELECTRIC GENERATING PLANT EXAMlHATION REPORT 424 and 50-425 OL-88-02 The NRC administered examinations on September 19-22, 1988, to employees of your company who had applied for licenses to operate the Vogtle Electric Generating Plant. At the conclusion of the writtan examination, a copy of the exam was left with your staff; at the conclusion of the site visit, preliminary findings on the operating tests were discussed with those members of your staff identified in the Examination Report, Enclosure 1.

Copies of the written examination questions and answer key are included in this report as Enclosure 2. Facility connents regarding the written examination are included in this report as Enclosure 3. Enclosure 4 summarizes simulator performance defic.iencies observed during conduct of the simulator portion of the operating examinations.

In accordance with 10 CFR 2.790(a), a copy of this letter and its enclosures will be placed in NRC's Public Document Room.

Sheuld you have any questions concerning this letter, please contact us.

Sincerely.

(ORIGINAL SIGNED BY C. A. JULIAN)

Caudie A. Julian, Chief Operations Branch Division of Reactor Safety

Enclosures:

1. Exam Report 50-424 and 50-425/0L s"
2. R0/SR0 Exam Questions & Answer Key
3. Facility Coments
4. Simulation Facility Fidelity Report cc w/encls 1 & 3:

J. J. Badgett, Corporate Training Dir.

G. Dockhold, Plant Manager cc w/encls 1, 2, 3 & 4:

P. Rushton, Site Training Director bec: (See Page 2)

% g ADOCK 05000424 l- (

hDR PDC 1

.Z E y.K

2- Ferrember 25, 1988 Georgia Power Company bec w/enci 1:

  • M. Miller, Project Manager, NRR M. Sinkule Section Chief DRP J. Arildsen, OL Examiner. DRS s State of Georgia  !;

bec w/encls 1, 2, 3, & 4:

! Senior Resident I. spector a l Operator Licensing Branch, DLPQ;NRR l

M*ccument Control Dest Scott Roesener, INEL, Contractor

, b l

l l

1

(

l Ril Rll

[00.8I W R1 t

[ RI OBWest i JAYildsen JM Po' CAs t(ian ,

11/03/88 11/l', /88 11/[g/88 11/gp88 k _ - _ -- - - _ -------- _---- - -