ML20196D259

From kanterella
Jump to navigation Jump to search
Amend 94 to License NPF-58,revising TS 3.8.3 by Increasing Div 3 Diesel Generator Fuel Oil Level Requirements to Account for Rounding Error in Calculation & Unusable Vol Due to Vortex Formation at Educator Suction Nozzle
ML20196D259
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 11/23/1998
From: Pickett D
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20196D265 List:
References
NUDOCS 9812020185
Download: ML20196D259 (5)


Text

- - - _ _

'#*"h p

UNITED STATES

,y j

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. enana manj

~s.,...../

CLEVELAND ELECTRIC ILLUMINATING COMPANY. ET AL.

DOCKET NO. 50-440 PERRY NUCLEAR POWER PLANT. UNIT 1 BAENDMENT TO FACILITY OPERATING LICENSE Amendment No. 94 License No. NPF-58 1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by the Cleveland Electric illuminating Company (CEICO), Centerior Service Company, Duquesne Light Company, Ohio Edison Company, OES Nuclear, Inc., Pennsylvania Power Company, and Toledo Edison Company (the licensees) dated September 3,1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendmsat can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-58 is hereby amended to read as follows:

9812020185 981123 PDR ADOCK 05000440 p

PDR

=__

(2) Technical Soecifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 94 are hereby incorporated into this license. The Cleveland Electric illuminating Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance and shall be implemented not later than 90 days after issuance.

FOR THE NUCLEAR REGULATORY COMMISSION V

E Douglas V. Pickett, Senior Project Manager Project Directorate 111-2 Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Isauance: November 23, 1998

- J ATTACHMENT TO LICENSE AMENDMENT NO. 94 FACILITY OPERATING LICENSE NO. NPF-58 DOCKET NO. 50-440 i

)

Replace the following pages of the Appendix "A" Technical Specifications with the attached j

pages. The revised pages are identified by Amendment number and contain vertical lines i

indicating the area of change.

Remove Insert 3.8 21 3.8-21 3.8-23 3.8-23 a

4 0

i

Diesel Fuel 011. Lube 011. and Starting Air 3.8.3 3.8 ELECTRICAL POWER SYSTEMS 5'

3.8.3 Diesel Fuel 011. Lube 011. and Starting Air l

'LC0 3.8.3 The stored diesel fuel oil, lube oil, and starting air subsystem shall be within limits for each required diesel generator (DG).

APPLICABILITY:

When associated DG is required to be OPERABLE.

ACTIONS

............__ __.._______........... NOTE-------------------------------------

' Separate Condition entry is allowed for each DG.

CONDITION REQUIRED ACTION COMPLETION TIME-

'.1 Restore fuel oil 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> A.

One or more DGs with A

fuel oil level:

level to within limits.

1.

Fcr Div 1 and Div 2.

< 73.700 al and 2 65.100 al: and 2.

For Div 3

< 36.700 al and 2 32.000 al.

B.

One or more DGs with B.1 Restore lube oil 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> lube oil inventory:

inventory to within limits.

.1.

For Div 1 and Div 2.

< 374 al and l

2 350 al: and 2.

For Div 3.

< 260 gal and 2 236 gal.

PERRY UNIT 1 3.8-21 Amendment No.94

+-

=

4

^

Diesel Fuel Oil. Lube Oil, and Starting Air 3.8.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FRE0VENCY i

SR 3.8.3.1 Verify each fuel oil storage tank contains:

31 days a.

2 73.700 gal of fuel for Div 1 DG and Div 2 DG: and b.

2 36,700 gal of fuel for Div 3 DG.

SR 3.8.3.2 Verify lube oil inventory is:

31 days i

a.

2 374 ' gal for Div 1 DG and Div 2 DG:

and b.

2 260 gal for Div 3 DG.

i l

1

- SR 3.8.3.3 Verify fuel oil properties of new and In accordance stored fuel oil are tested in accordance with the Diesel with, and maintained within the limits of.

Fuel Oil the Diesel Fuel Oil Testing Program.

Testing Program i

SR 3.8.3.4 Verify each required DG air start receiver 31 days pressure is a 210 psig.

SR 3.8.3.5 Check for and remove accumulated water from 92 days

_each fuel oil storage tank.

l SR 3.8.3.6 For each fuel oil storage tank:

10 years L

a.

Drain the fuel oil:

l b.

Remove the sediment: and c.

Clean the tank.

t