ML20196C784
| ML20196C784 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 06/23/1988 |
| From: | Martin R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Withers B WOLF CREEK NUCLEAR OPERATING CORP. |
| Shared Package | |
| ML20196C787 | List: |
| References | |
| NUDOCS 8807010227 | |
| Download: ML20196C784 (3) | |
See also: IR 05000482/1988014
Text
/
4
_6
. , . e o torr
W79
In Reply Refer To:
s.
,
Docket:
STN 50?482/88.14"
n =3
Wolf Creek Nuclear Operating Corporation
ATTN:
Bart D. Withers
President and Chief Executive Officer
P.O. Box 411
Burlington, Kansas 66839
Gentlenen:
This forwards the report of the Systematic Assessment of Licensee
Performance (SALP) for the Wolf Creek Generating Station.
The SALP Board met
on May 17, 1988, to evaluate the performance of the subject facility for the
period March 1, 1987, through March 31, 1988.
The performance analyses and
resulting evaluations are documented in the enclosed SALP Board Report.
In accordance with NRC policy, I have reviewed the SALP Board recommendations
and concur with their ratings.
It is my view that, although two areas showed
an increase in performance, there is an overall undesirable reduction in
performance at Wolf Creek Generating Station.
The following specific areas
merit highlighting:
1.
The SALP Category 1 ratings in security and fire protection are notable
and reflect effective management involvement in these areas.
2.
Performance in-the areas of quality programs and outages has declined
since the last SALP period from a Category 2 rating in each area to a
Category 3.
This indicates minimally satisfactory performance and
reflects ineffective management oversight in these two areas.
3.
The performance in all other functional areas, except for surveillance and
emergency preparedness, has either declined or shows a declining trend.
4.
A common thread running throughout several functional areas (e.g.,
operations, outages, and quality programs) is the lack of effective
cooperation and coordination between the plant operations staff and the
various technical support groups.
This matter requires prompt assessment
and resolution if the identified declining trends are to be reversed.
A management meeting will be scheduled with you and your staff to review the
results of this SALP report.
The time and place of this meeting will be
promul ated sepa atel .
Within 30 days of this management meeting, you are
RI P .DRP
S
D P/A
C
/A
R
R
AD:
JTapia
BBartlett
DChamberlain
P0Co nor JCalvo
MRKnapp
i/Z2/88
6 /22-/88
6/2Z/88
b/2L/88
1,/23/88
(, Ql88
he
'
D:DRM
Rec 5ncur
(oan
LJCaYian
3DM
/
DChamberlain
'
h
(,
88
f/22/88
f1,
b/M/88
8807010227 080623
ADOCK 05000402
0
7
_
E
S
Wolf Creek Nuclear Operating
-2-
Corporation
required to comment, in writing, to this office for all areas which received a
SALP Category 3 rating.
You are also requested to provide comments for all
areas which received a SALP Category 2 rating.
Comments which you submit are not subject to the clearance procedures of the
Office of Management and Budget as required by the Paperwork Reduction Act of
1980, PL 96-511.
Sincerely,
oridn't m=d By
R. D. rwa n
Robert D. Martin
Regional Administrator
Enclosure:
SALP Board Report 50-482/88-14
cc w/ enclosure:
Wolf Creek Nuclear Operating Corporation
ATTN:
Otto Maynard, Manager
of Licensing
P.O. Box 411
Burlington, Kansas 66839
Walf Creek Ncclaar Operating Corporation
ATTN: Gary Boyer, Plant Manager
P.O. Box 411
Burlington, Kansas 66839
' Kansas Corporation Commission
ATTN:
Robert D. Elliott, Chief Engineer
Fourth Floor, Docking State Office Building
Topeka, Kansas 66612-1571
Kansas Radiation Control Program Director
,
bcc to DMB (IE40)
bec distrib. by RIV:
Myron Karman, ELD, MNBB (1)
- RRI
R. D. Martin, RA
- Section Chief (DRP/A)
,
l
- DRP
- RPSB-DRSS
B. DeFayette, RIII
- RIV File
Callaway, RIII
- MIS System
- RSTS Operator
- ProjectEngineer,DRP/A
G. F. Sanborn, E0
Lisa Shea, RM/ALF
- DRS
J. Taylor, D/IE
l
- P. O'Connor, NRR Project Manager
!
-
. _ . , . - -
. - -
-
.
-
..
e-
-. _ .
,
s;
- i;
Wolf _ Creek' Nuclear Operating
-3-
-
Corporation
.
all.RRIs at all sites
Records Center, INP0
- J. Calvo, NRR
Chairman L. W.-Zech (MS: H-1144)
-
Com. T. M. Roberts (MS: H-1149)
Com. F. M. .Bernthal -(MS: H-1149)
- Com. K. M. Carr (MS: H-1149)
Com. K. C. Rogers (MS:
H-1149)
PAO, Region IV
G. Sanborn
M. Jayne
M..R.
Knapp
.
- w/766-
.
--
l
L
l
l
l
l
l
!-
!