Forwards Semiannual Update of Project List,Per Amend 122 to License DPR-16
ML20196C611
Person / Time
Site: Oyster Creek
Issue date: 12/02/1988
From: Long R
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
C-88-483, C000-88-0483, NUDOCS 8812080042
Download: ML20196C611 (17)


Text

'e GPU Nuclear Corporation NUCI88r One Upper Pond Road Parsippany, New Jersey 07054 201 316-7000 TELEX 136-482 Writer's Direct Dial Number:

December 2,1988 C000-88-0483 U.S. Nuclear Regulatory Commission Attention:

Document Control Desk liail Station Pl-137 Washington, D.C.

20555 Gentlemen:

Subject:

Oyster Creek Nuclear Generating Station (OCNGS)

Docket No. 50-219 Integrated Schedule Project List Semi-Annual Update

Reference:

NRC letter dated llay 27, 1988 - Issuance of Amendment No. 122 Pursuant to condition 2.C(10) of Provisional Operating License DPR-16, GPU Nuclear has irrplemented the Long Range Planning Program for 0CNGS in accordance with the Plan as contained in Enclosure 2, Attachments I and 2 of the above reference.

As reauired by Section V.A of the Plan, the following attachments are submitted to provide the semi-annual update of the project list:

1.

Attachment A contains a new project list of Category A, B and C projects annotated by an asterisk (*) to identify new projects.

11.

Attachment B contains a summary of Category A and 8 projects which have been completed, deleted, deferred, changed in scope, or otherwise have had schedule changes with explanations as appropriate.

Also contained are Category C project completions and changes in categorization.

Changes in scope or schedule of Category C projects will only be addressed if there is an impact on Category A or B schedules.

No changes in Category A project schedules have been made or reauested by this submittal.

Five Category B schedule changes and one deletion are discussed in Attachment B.

Very truly yours,

,W9 +//

?

heft/

R. L. Long,1 g %

Vice President agj 1 rector Planning & Nuclear Safety RLL/PC/pa(7751f) f 0 l\\

0 ec's on next page G812090042 G81202 l ! l} \\

PDR ADOCK 05000219

\\

R PDC GPU Nuclear Corporat;on is a subsd ary of General Pubhc Utit es Corporat;on

;. y;7,r o;.

't}

~

cc: Mr. William T. Russell, Administrator Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA.

19406 NRC Resident Inspector Oyster Creek Nuclear Generating Station Forked River, N.J.

08731 Mr. Alex Dromerick U.S. Nuclear egulatory Commission Mail Station Pl-137 Washington,'D.C. 20555 f

OY$TER C R E E 01 PROJECT L1ST I NG

...\\

\\

1 CATECORY

'A' PROJECTS i

l

..........=---- - - =---...............= =

_--=_=.......--............................------...---...........9NOV88....

SORT BY CATECORY/ CYCLE /BA STATUS AS OF 2 OSS RA DESCR1PTION CYCLE /

CLASSIFICATION NUMBER YEARS

............................................................==---====----_ _.....................................................

1 328232 STANOBY LIQUID CONTROL SYS MOD (SLCS) 12R NRR RB REPL SEALS ON 2 SLCS PUMPS;TO MEET ATWS ADD BORON-10 TO QLCS - REVISE TECH SPEC REQ TS AS DEFINED IN 10CFR50.62.

2 402256 TOROS TEMPERATURE INSTRUMENTATION 12R NRR TR RB CR COMPLIANCE TO REG GulDE 1.97 NUREC 0661 INSTALL TEMP.IND. RECO6ER IN C.R.

3 402631 ALTERNATE ROD INJECTION MOD (ATWS) 12R MRR RB23 CR INSTALL ALTERNATE ROD INJECTION SYSTEM. 10CFR50.62 RULE 4 402854 C.R. HABiTA8iLITY. MOO 12R NRR CR UCSR TIE-INS OF CR HVAC SYSTEM INSTALLED DURING CYCLE 11. L1 CENSE COND1 TION 2.C.8.

5 328262

  • STATION BLACKOUT RULE EVALUATION 89 MRR ANALYSIS TO RESPOND TO NRC REQUIREMENTS ON SBO. 10CFR50.63 RULE. COMPLETE BY 4-1T-89.

- --, _~, _--. _-.

7 OY$TER C R E E CI

.P R_O J E C T LI3 TING

=--

CATEGORY

'B' PROJECTS SORT BY CATEGORY STATUS AS OF 29NOV88

................./. CYCLE /BA

......._ _----==.===-

__ - _==__=---- =- - -....................................... - - _ = _ _ _ - - - - - - __====.......

OSS BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS

_ _____--- =_............................====_=

6 315302 SEP TOPIC Ill-1 12 NRR EV". UATE DESIGN OF SPECIFIC COMPONENTS AtC INCOkPORATE RESULTS IN AN UPDATE TO THE FSAR. LAl 82251.06 7 402615

  • CONTAINMENT PARTICULATE MONITOR -PHASE 2 12 NRR RB23 INSTALL A NEW CPM UNIT AND HAVE si OPERATIONAL DURING CYC 12. SEP topic V-5 8 402840 H2 WATER CHEMISTRY IMPLEMENTATION 12 NRR TB R8 YARD F INAL TEST I NG A 40 IMPLEMENTATION.

9 323397 HFA RELAY REPLACEMENTS 12R NRR:

4160 480V RFPLACE NYLON TYPE RELAYS WITH CENTURY TEFZEL 8088tN TYPE RELAYS.

[

108 84-02.

10 328100 FW ar CRD NOZZLE EXTERNAL UT INSP 12R NRR DW UT INSPECTION OF FOUR FW NOZZLES CRD NOZZLE (.4) REG 0619.

AND ONE (1)L., PREPARE $URFACES.

NU REMOVE INSU 11 328130 79-02 ANCHOR BOLT INSPECTIONS 12R NRR RB TB INSPECTION OF ANCHOR BOLT INSTALLATIONS.

X 4

5

_m m-.

_=

.m.

7 g

o I

7~,r -

.. ~

~

3:

J, n-Q w

. *,.i

, c.

.~

'a OYSTER CREEK PQOJECT LIS TI NC

..l

.....-----.------------..........--- =_=----= ---------

n.

CATECORY 'B' PROJECTS

.--l I

1

-I l

g TORT sY CATECORY/ CYCLE /BA STATl;$ AS OF 29NOV83 H

}

....... _---- _==--

1 085 BA DESCRIPTION CYCLE /

CLASSfFiCATION l

NUMBER YEARS i


= =_--

-l l

12 328160 RCS AUC - ICSCC INSPECTION 12R NRR OW R875 R895 INSPECT PIPING WELDS.

i a

i i

j 13 328161 RCS STRESS 8MPROVEMENT 12R NRR 1

DW RB23 PERFORM STRESS IMPROVEMENT ON SELECTED 1

P1 PING WELDS.

l 14 328195 EFFECT OF LOCA ON TORtlS TO DW BREAKERS 12R NRR 1

TOR 4

MOOlFY VALVES INTERNALLY AND EXTERNALLY.

4 TO MEET NUREG-0661 ar GL-83-08 PERFORM i

TECH SPEC SURVEILLANCES.

i 15 402180 RADIOACTIVE CASEOUS EFFLUENTS MONITORING 12R NRR CR INSTALL NEW CkECK SOURCE FOR HICH RANCE MONITOR, R[ CORDERS ANO RATE METER.

I 16 402181 RACEMS UNIT 2 FOR TB 12R NRR T8 INSTALL NEW CHECK SOURCE FOR HICH RANGE MONITOR.

IT 402811 CONTROL ROOM CONSOLIDATED DISPLAY 12R NRR CR INSTALL 3 NEW DICITAL READOUTS ON PAN (LS 1F/2FEUREG 0737 SUPP 1.

8F/9F TIE-IN TO KEY C.R.

EOP S DATA.

I

OYSTER CREEK PROJECT L IST IOC

.... -. =

. ------...............- _==---

_=====-- _

l CATECORY

'B' PROJECTS l

SORT SY CATECORY/ CYCLE /BA

_- ---- _ _ _ - - - -..........--..- ST ATUS AS OF 29810V88- - -

.............--......-......--...---==-----......--..----..------........

..----.-------..=-_=

OSS BA DESCRlPTION CYCLE /

CLASSIFiCATIOtt NUMBER YEARS

..-...........--=__ _ _ _

_ - -==_

--==---....-........................==--- _ _=.------------...

18 402815

  • CONTAINf4ENT PARTICULATE MONITOR -PHASE 1 12R 90RR RS23 INSTALL TIE-INS - ISOl_ATION VALVES AND SUPPORIS - SEP TOPIC V-5.

19 402857 SW RADIATI04 MOeliTOR SYS UPCRADE 12R NRR RS CR VARD REPLACE ExtSTiseC MONITORING SYS WITH STATE-OF-THE-ART MONITORS TO MEET TECH SPEC REQUIREMENTS.

20 402870 C R RECORDERS UPGRADE 12R NRR CR REMOVE at REPLACE 13 DEFICIENT /

OBSOLETE RECORDERS - REDUCE OPERATOR ERROR-NUREC 0737 SUP 1 21 402873 DRYWELL THINNING - CATHODIC PROTECTION 12R 81RR TR INSTALL CATHOOIC PROTECTION SYSTEM TO ARREST OR MITIGATE IDENTIFIED CORROSION OF THE DRWELL WALL.

22 402876 NEW SUPPORTS A8eD SUPPORT UPCRADES(79-14) 12R 8 ERR DW T8 R8 UPCRADE EXISTiseG SUPPORTS ANO INSTALL SsEW SUPPORTS TO MEET ANSI B31.1 DESIGN CRITERIA.

23 402879 RPS/ ESC INSTRUMENT UPCRADE 12R NRR R8'>l T8 REPLACE 3 PRESSURE SWITCHES.

OPERATIO4AL/ MAINTENANCE CONCERNS.

me m--

m+y-

=ww

'r' Wgmwe eW vm-em-re

,-me-

+'F-s3-wwe Nme-----+-

-+ewJW' ew--=w-r c'

wWq

-w-eMen W

-gh aTw -W 7 wmm-o-'-4

, mp 9ye-wa r4e s'w'

--P' V

,e>

-TSer T-*=--

en-4

OYSTER C R E E C1 PROJECT L iSTI NC CATECORY

'8' PROJECTS SORT BY CATECORY/ CYCLE /BA__....... _.....__........_________..__........__.._._. _._.._____.....___....._....__. __..... 9..NOV88 STATUS AS OF 2 08S BA DESCRIPTION CYCLE /

CLASSIF1 CATION NUMBER YEARS

................__=____- =------==-==..........._..._..._.___...._._..........._.._..__.._.................. = _.................

24 402872 TORUS O2 SAMPLE LINE ISCLATION 12U NRR CR R823 ADD A RELAY & LOCAL WIRING IN PANEL 11F.

INSTALL CABLE FROM CR TO O2 ANALYZER IN RS23.

25 328A88 RCS STRESS IMPROVEMENT 11R NRR DW RB23 PERFORM STRESS IMPROVEMENT ON SELECTED STAINLESS SIEEL PIPING WELDS IN RCS SYS.

26 328A80

27 328030 CNTRL RM HUMAN FACTORS DESCN REVIEW 13R NRR CR REPAINT REFURBISH & RELA 8EL CR PANELS IR THRU 11R INCLUDING IXR k 9XR.

NUREG 0737 SUP 1.

28 328196 CRO NOZKE INTERNAL letSPECTION 13R NRR 119 ATTEMPTING TO DO UT INSP IN 12R IN ORDER NOT TO PERFORM PT lhSP IN 13R.

NUREC-0619 CONTINGENCY EFFORT 29 328204 RCS AUG - ICSCC INSPECTION 13R NRR OW R875 R895 INSPECT PIPING WELDS.

_..m..

_m

.m 4

OVSTER CREEK PROJECT LiSTIOG

. l CATECORY

'B' PROJECTS 1

l i

l j

SORT BY CATEGORY / CYCLE /8A STATUS AS OF 29e00V88 I

i i

085 BA DESCRIPTION CYCLE /

CLASSIFiCATIOil NUMBER YEARS I

4 i

-...--_-- _..............................---- _==............

I

}

30 402YYY REMOVE DENS. COMP. FROM RX H2O LVL REC.

13R NRR a

CR REMOVE DENSITY COMPENSATION FROM REACTOR WATER LEVEL INSTRUMENTS.

NUREG 0737 SUP 1

]

31 402808 CONVRT COMPUTER RM TO GSSI/EMER DIR OFFC 13R NRR 4

CPR PERMANENT *_Y REMOVE SICMA COMPUTER FROM COMPiJTER RM & CONVERT SPACE INTO CSS OFF ICE. REQUlstES SECURITY PROOF ING.

32 402859 ESW FLOW INDICATION (CON 1HOL ROOM) 13R NRR CR RB23 INSTALL (2) FLOW IMO.^.% TORS IN CR PANEL 2F & ASSOCIATED CABLES FROM RB23' TO CR.

REG CUIDE 1.97 REQUIREMENTS.

33 402879 RPS/ESG ?NSTRUMENT UPCRADE 13R flRR RB51 RB23 TB

  • REPLACE 30 PRESSURE SWITCHES.

OPERATIONAL /MAIMTENANCE CONCERNS.

34 402888 RPV CAPyULE #2 13R NRR 119 INSTALL CAPSULE #2 IN 'R' VESSEL.

NUREC 0822.

35 402900

PIPING ON THE 75' LEVEL OF RX BLDG.

a

m m._.

OYSTER C R E E C%

PROJECT LI $TINC

....-----.- =--- =..................---- =---_......

CATECORY

'B' PROJECTS

_ -- - =..................... 9. NOV88 STATUS AS OF 2 SORT BY CATEGORY / CYCLE /BA

...- ----....-- - = -.................................. - - - - = = = = = - - - =. -..=_

.C OSS BA DESCRIPTION CYCLE /

CLASSIFICATION l'UteER YEARS

==---.==--- -_---

= = = = = - - = = = = = =....... = - - = = = = - - = - - _ = = = = -.............. - = = = = = -

36 1602910 C R RECORDERS 13R NRR CR REMOVE & REPLACE APPROX. 15 DEFICIENT /

OBSOLETE RECORDERS - REDUCE OPERATOR ERROR. MUREC 0737 SUPP 1.

37 328A8J

18 R NRR O

38 328ABL

  • RCS STRESS IMPROVEMENT 6

DW RB23 PERFORM STRESS IMPROVEMENT ON SELECTED STAINLESS STEEL PIPING WELDS IN RCS SYSTEM.

39 328205 SQUG SUPPORT & PARTICIPATION - BWROG 87-91 NRR PARTidiPAYiUS IE*5EISAIC QUALIFICATION ~

OF UTILITV GROUP FOR EQUIP SEISMIC QUA.

~

LIFICATION. UNRESOLVED SAFETY ISSUE.

40 328226

  • SQUG PROGRAM IMPLEMENTATION 87-93 NRR ESTA5(I5H'5$iSAIU"Qh LIFICATION FOR OYSTER CREEK. SCOPE INCLUDES WA3_KDOWNS ANP EVALUATIONS.

a61 328092 VENDOR COCUMENT CONTROL PROGRAM

-87/89-NRR REVW OF VENDOR MANUALS FOR EXISTNG EQUIP VERIFY APPLICA81LITY TO SUPPCRT MAININC ACTivlTIES LAI-83139.60 l

s.._

l l

l l

I i

1

i OYSTER CREEK PROJECT L i ST IOG CATECORY

'C' PROJECTS SORT ev CATEGORY / CYCLE /BA STATUS AS OF 2

.................................... 9NOV88..---

..........--==-- - - -_ _==...._.....-_--..... --__---...................=.

G25 BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS

.... _ _ _..... _ _ _. _ - - - -- --=._ --- - -.... _ _....... _ _............................. = - _ _ -

. - - _ - _ _==.............................

42 402763 WATER CHEMISTRY MONITORING SYSTEM 12 MRC RBS1 TBS INSTALL PsPINC FOR ON-LINE MONITOR OF DISSOLVED 02 & CONDUCTIVITY FOR FW DISCHARGE.Suki CF RW SAMPLNG STA 43 402823 CROUNDING & LIGHTNING PROTECTION 12 ISM YARD MB INSTALL GROUNDING PROTECTION FOR MAIN AND NORTH GUARD HOUSES MAINT.

BLDG., MATL WAREHOUSE 44 402836 DILUTION PUMP HOUSE REPAIRS & MOOS 12 MRC Dil INSPECT & REPAIR OF CONCRETE.

REPLACE CORROOED CONDUITS.

45 402898 REPL UPPER TB & OLD MACHINE t 2

'OOF 12 MRC YARD REPLACE THE UPPER TURBINE Butt A

ROOF, AND THE OLD MACHINE SHOP COF.

46 408?83 O.C. SPENT FUEL POOL WASTE DISPOSAL 12 MRC 119 REMOVE & DISPOSE OF IRRATIATED HARD-WARE IN THE SPENT FUEL POOL.

47 323540 LP TURBINE INSPECTION 12R MRC TB COMPLETE INTERNAL INSPECT OF THE "C" TURSOME. REMV ROTOR FROM CASIN"4.

LP SAWBLAST UT INSP & REINSTALL ROTO

~

OYSTER CREEK PROJECT L 1 ST IQG

--- - ----------------------------------------===- ---

CATECORY 'C' PROJECTS SORT BY CATECORY/ CYCLE /BA STATUS AS 'F 29NOV88 085 BA DESCRIPTION CYCLE /

CLASSIFICATivN NUMBER YEARS 48 402AAA

  • OTHER OUTAGE RELATED ACTIVITIES 12R ALL ALL OUTAGE RELATED ACTIVITIES SUCH AS thSPECTIONS REPAIRS, SURVEILLANCES MINOR MOOlFICATIONS, MOD SUPPORT, ETC.

49 402896 RX PRESS SVTHS RE03/RE15 CJ:4VER TO ANALO 12R ISM CR RB REPLACE RE03 A B,C,&O & RE15 A,8 C&O W/

ELECT TRANSMTEdS ON RKOl&RKO2. A60 ELECT MDLS & RUN CONDUlT STWN 6R & PNL 18R/19R 50 402823

  • CROUNDING & LICHTNING PROTECTION 13 ISM ORW AOC TB RB INSTALL L ICHTNG PROT FOR OLD RW, AOC, TB,RB, MAINT. BLDG., MATL WAREHOUSE.

51 323566

  • RECIRC PUMP FLANC( REPAIR & PUMP INSP 13R MRC RB DW 23 INSPECT & REFURBISH "A" RECIRC PUMP &

MOTOR.

52 323580 LP TURBINE INSPECTION ("A" & "8")

13R MRC TB P"PLETE INTERNAL INSPECTION OF THE A at B" LP TURBINES. REMOVE ROTORS, SANDBLAST,UT INSP & REINSTALL ROTORS.

53 402AAU

REPLACE / MOO 1FY APPROX 10 VALVES.

INPO SOLR 86-3.

a OV5TER CREEK PROJECT 8, IST ING

- ___= ___=_====_-_=====.....................

CATECORY 'C' PROJF0fS SORT SY CATECORY/ CYCLE /.BA STATUS AS OF 29NOV88

........................==--

085 BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS

...........==-_-

94 402888 OTHER OUTAGE RELATED ACTIVITIES 13R ALL ALL OUTAGE RELATED ACTIVITIES SUCH AS INSPECTIONS REPAIRS, SURVEILLANCES MINOR MOOlFICATIONS, MOO SUPPORT, ETC.

95 402821

  • RX RECIRC PUMP & MOTOR VIBRATION MONITRS 13R MRC DW CR INSTALL ACCELEROMETERS ON ALL 5 RECIRC WIRiled. INSTALL ASSOCI ATED ELECTRICAL PUMPS WlRE TO CR.

96 4 %669 CA8LE/CO800Ulf REPAIR-CIRC WATER PUMP PIT 13R REL INT REPLACE ELECTRICAL CON 00lTS CABLE AND CONOUli SUPPORTS AT THE INTAKE STRUCTURE 57 402901

  • FEEOWATER SYSTEM IMPROVEMENT 13R 13R REL TB CR NCSR REPLACE ANALOC CONTROL SYST W/DICITAL PROVIDE CAPABILITY TO ISOLATE REG VLV$

REPL PNEUMATIC RELAYS,REOUCERS & SEL PIP 58 402915

  • REDUCE NUMBER MS SAFETY VALVES 13R RAD OW KS SAFETY VALVE REDUCTION STUDY. REPLACE EMRV'S PERMANENT REMOVAL OF MSSV'S BASE ON STU6Y PERFORMED.

59 323F33

  • HP TURBINE INSPECTION 14R MRC TB COMPLETE INTERNAL INSPECT OF THE HP TURBil6E. REMV ROTOR FROM CASING SAMOBLAST UT INSP & REINSTALL ROTOd.

=_... _ _.

- - _ _ _ _... = -

-__1

....m m

O OV5TER CREED PROJECT L ISTI NG j

4:,

g.

i CATECORY

'C' PROJECTS i

i f'

\\

SORT BY CATECORY/ CYCLE /BA STATUS AS OF 29NOV88

. - = =... _ -. -........ - -... - -...., - - - -... - = = = = = = = = = _ _ _ = = = = - - - - -..... - -....... - - - - - - - -......

085 BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS

......._ _====.==_

==_.......--.=- =__===- - -- --

_-------...- --- -----------.--. --..... --------------------------------~~.

60 402CCC

  • OTHER OUTAGE RELATED ACTIVITIES 14R ALL ALL OUTAGE RELATED ACTIVITIES SUCH AS INSPECTIONS REPAIRS, SURVEILLANCES MINOR MODIFICATIONS, MOD SUPPORT, ETC.

61 402636 WIDE RANGE NEUTRON MONITORING 14R alRet DW13 INSTALL AM 8 CHANNEL WRNM SYSTEM TO REPLACE EXISTING SRM'S/IRM S.

62 402845 UteOER VESSEL CA8LINC 14R MRC DW REPLACE EXISTINC UNDERVESSEL COAXIAL CABLE A8eD CONNECTORS WBTH QUICK DISCOftNECT ARMORED CABLE.

63 402848

  • HP TUR8tNE DIAPHRAM MOD 14R REL TB REPL 12 DIAPHRAMS REPL & MACHINE ROTOR SEALS TO REDUCE STfAM LEAKAGE. ANALYZE AND CHANGE NAMEPLATE.

64 402883

  • CONTA190 MENT REVIEW & UPCRADE 14R ISM R8 DW EVALUAfE THE OC CONTAIIeMENT IN RELATION TO PROPOSED NRC SEVERE ACCIDENT CONT.

POLICV (CHER8eO8YL). SCOPE TO BE DEFINED.

65 328182 AS-BUILT DRAWING PROGRAM 87-89 14RR DRAWING REVISIONS TO REFLECT AS BulLT/

AS FOUND CONDITIONS RESULTING FROM F C36

  • S.

^h OYSTER CREEK PROJECT LIST IOG CATECORY

'C' PROJECTS

....._........._/CYLLE/BA

............___...._______..................-___9_NOV88.._.

SORT BY CATEGORY STATUS AS OF 2 CDS BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS 66 328259

  • CONFIGURATION MNGT - DRWG PROGRAM 87-90 ISM PHASE 1 OF 2 - COMPUtr'alZED UPCRO Of OC DWNCS. CREATE STADRS.PROCDRS, SAMPL DIGRMS & IONFY ENO-USERS.

67 328146 PROBABILISTIC RISK ANALYSIS UPDATE 87-91 NRR UPDATE EXISTING OC PROBABILISTIC RISK ANALYSIS TO INCORPORATE CHANCES TO PLANT SINCE 1978.

66 402011 OC REPLICA SIMULATOR 87-91 NRR YARD DESIGN FABRICATE INSTALL A SIMULATOR DUPLICATING THE 00 CONTROL RM FUNCTIONS FOR TRAINING PURPOSES.

69 328148 O.C. PLANT LIFE ENTENSION 87-92 REL DEVELOP 3-PHASE FLEX PLAN. PHASE 1 TO DETERMINE FEASIBILITY AND COST /

ANALYSIS OF PLEX.

70 328ACY CONF IGURATION MANAGEMENT-DESIGN BASES RE 89-92 NRR DEVE(SANDP O 5*"S $iEM 6551CN BASES. PERFORM

~

. IMPROVE DRAWING LEGIBill TY.

ATTAONENT "B" OYSTER CREEK NUCLEAR GENERATING STATION INTEGRATED SOIEDULE SINIANNUAL UPDATE (NOVEMBER 30,1988)

CATEGORY "A" PROJECTS Additions: As denoted by

  • next to the project title.

Completions: None Deletions: None Schedule Changes: None Other Changes: None i

l l

l 39660

E Oyster Creek - Integrated Schedule ATTAC WENT "B" (Cont'd)

QTEGORY "B" PROJECTS Additions: As denoted by

  • next to 4 y niect title.

Completions:

B/A TITLE f

402719 Masonry Wall Mods-Phase II - Ref:

I.E.B. 80-11 408077 Enhancement Protected Area Barrier -

NRC Insp. Report 83-07 402180 Radioactive Gaseous Effluents Monitoring -

(Cycle 11 portion) - NUREG 0737 6 RETS Deletions:

B/A - 402877 - ISO Condenser Penetration Hod.

NRC requirements will be addressed under a separate aroject that would replace the ISO Condenser penetrations

)y the end of 13R Refueling Outage. Ref.: GPUN letter

  1. 5000-88-1604 dated 7-27-88 Schedule Changes: B/A 402873 - Drywell Winning - Cathodic Protection The implementation timeframe was changed from end of Cycle 11 to end of 12R Refueling Outage.

B/A 402872 - Torus 02 Sam?le Line Isolation Implementation date was clanged from end of 13R Refueling Outage to Cyle 12U. Although the commitment is for the end of refueling Outage 13R, GPUN has elected to finish this project earlier during outages of opportunity if possible.

B/A 328205 - SQUG Support 6 Participation - BWROG The completion date for the program was changed from 1990 to 1991.

B/A 402181 - RAGBG Unit 2 for TB De Cycle 11 portion of the Turbine Building RAGBG project was anticipated to be complete just prior to the start of i

12R Refueling Outage. The recent unplanned shutdown (9/29/88) and the resultant early comencement of the 12R Outage precithled the ability to complete this work during Cycle 11. W e remaining work, primarily start up and test i

activities, are scheduled for completion during the 12R outage.

B/A 402879 - RPS/ESG Instrument Upgrade Scope change is required from 4 to 3 pressure switches during 12R refueling outage. Unavailability of suitable replacement for pressure switch RE23 necessitates schedule changes for the switch to the 13R refueling outage.

Addition of this switch to 13R work scope is reflected in this project listing.

Other Changes: None.

39660

Oyster Creek - Integrated Schedule ATTACWEffr "B" (Cont'd)

CATEGORY "C" PROJECTS Additions: As denoted by a next to the project title.

Completions:

B/A TITLE 402138 Additional Spent-Fuel Storage Racks 409522 MAC Facility Refurbishment 328049 0.C. LOCA Appendix K-revaluation 328231 0.C. - Material Condition Evaluation Update 402792 Chlorination Upgrade Other Changes: B/A 328226 - SQUG Program Implementation Moved to Category "B" projects per le tv - to NRC dated October 13, 1988.

B/A 328161 - RCS Stress Improvement - 12R Moved to Category "B" projects per letter to NRC dated August 12, 1988.

B.A 328ABI - RCS Stress Improvement - 13R Moved to Category "B" projects per letter to NRC dated August 12, 1988.

B/A 328ABL - RCS Stress Improvement - 14R Moved to Category "B" projects per letter to NRC dated August 12, 1988.

B/A 402840 - I{2 Water Chemistry Implementation Moved to Category "B" projects per letter to NRC dated August 12, 1988.

3966U