ML20196C396
| ML20196C396 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 02/08/1988 |
| From: | Wright G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Schnell D UNION ELECTRIC CO. |
| Shared Package | |
| ML20196C399 | List: |
| References | |
| NUDOCS 8802160090 | |
| Download: ML20196C396 (2) | |
See also: IR 05000483/1988002
Text
- --
-
1i
.
h
FEB 0 81083
.r~
-
Docket No. 50-483
Union Electric Company
ATTN:
Mr. Donald F. Schnell
Vice President - Nuclear
Post Office Box 149 - Mail Code 400
St. Louis, MO 63166
Gentlemen:
This refers to the routine safety inspection conducted by Ms. B. A. Azab of
this office on January 5-14, 1988, of activities at Ca11away' Plant, Unit 1,
authorized by NRC Operating License No. NPF-30 and to the discussion of our
findings with Mr. G. L. Randolph and others of your staff at the conclusion
of the inspection.
This inspection consisted of an examination of the startup physics testing
performed for Cycle 3.
No violations were identified; however, several
inspector concerns were identified which were adequately addressed by the
licensee during the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
.0 RIG!NAL SIGliED BY GEONREY 0, yiRIGHI
c
.
- . . .
G. C. Wright, Chief
Operations Branch
Enclosure:
Inspection
Report No. 50-483/88002
See Attached Distribution
h
RIII
I e5
III
RIII
d!"easi
$
/WSt
g\\
P
iips
t
4
gggagggeeggg3
qf
L
.
. . .
.
.
. . . .
.
..
. . .
..
_ _ _ _ _ _ _ _ _ _ _
_
. . . . . .
l
r
2
FEB08losa
Union Electric Company
2
, Distribution
cc w/ enclosure:
A. P. Neuhalfen, Manager Quality
Assurance
Tom P. Shcrkey, Supervisor,
Compliance
DCD/DCB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Region IV
Resident Inspector, Wolf Creek
K. Drey
Chris R. Rogers, P.E.
Utility Division, Missouri
Public Service Commission
CFA, Inc.
.