ML20196B576
| ML20196B576 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 11/30/1988 |
| From: | Greenman E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Shelton D TOLEDO EDISON CO. |
| References | |
| NUDOCS 8812060308 | |
| Download: ML20196B576 (1) | |
Text
I M8/g[
5A UNITED STATES g
NUCLEAR REGULATORY COMMISSION
~$
?,
nEason m D
!f 799 ROOSEVELT RO AD cten cuYN,ILUNol$ 60937 NOV SO 1989 Docket No. 50-346 s
Toledo Edison Company' ATTN: Mr. Donald Shelton Vice President Nuclear Edison Plaza 300 Madison Avenue Toledo, OH 43652 Gentlemen:
The NRC recently received an allegation concerning activities at the Davis-Besse Nuclear Power Plant. Details of this allegation are provided as an enclosure for your review and followup.
Because this matter does not involve a potential violation of NRC regulatory requirements, no response to this letter is necessary. However, should your investigation identify a potential safety or regulatory issue, then a response is requested.
The enclosure to this letter is considered exempt from disclosure according to Section 2.790 of the NRC's "Rules of Practice", Part 2 Title 10, Code of Federal Regulations, and will not be placed in the NRC Public Document Room.
Your cooperation with us is appreciated. We will gladly discuss any questions you have concerning this information.
Sincerely, (C&AL dward G. Gre n Dir tor Division of Reactor Projects
Enclosure:
As stated (10 CFR 2.790(a) Information) cc w/o enclosure:
L. Storz, Plant Manager 10CD/DCS~(RIDS),
Licensing Fee Management Branch Resident Inspector, R!!!
Harold W. Kohn, Ohio EPA James W. Harris, State of Ohio Robert M. Quillin, Ohio
//
Department of Health bi State of Ohio, Public Utilities Comission factosure Contains l
EXEMPT FROM DISCLOSURE INFOR2All0N h
Upon Sepnation This Page is Decontrolled hCKo=31130 09 8 P
r-Q
- OOO346 PDC