Text
a 1
Docket No. 50-267
~
Mr. R. 0. Williams, Jr.
Vice President, Nuclear Operations
.Public Service Company of Colorado Post Office Box 840 Denver, Colorado 80201-0840
Dear Mr. Williams:
SUBJECT:
FORT ST. VRAIN NUCLEAR GENEPATING STATION. AMENDMENT N0.58 TO FACILITY OPERATING ~ LICENSE NO. DPR 34 (TAC NO. 65445)
The Commission has issued the enclosed Amendment No.58 to Facility Operating License No. DPR-34 for the Fort St. Vrain Nuclear Generating Station. This amendment consists of changes to the Technical ' specifications (TS) in response to your_ application dated April 23, 1987 (P-87100).
This amendcant revises the Technical Specifications concerning the surveillance and calibration raquirements of the Plant Protective System (PPS).
Specifically, it deletes a specific test method used to demonstrate operability requirements and allows tre use.of another equivalent method.
A copy of the Safety Evaluation is enclosed.
The Notice of Issuance will be included in the Commission's next Bi-weekly Federal Register notice.
Sincerely,
/s/
Kenneth L. Heitner, Project Manager Project Directorate - IV Divisian of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation
Enclosures:
1.
Amendment No.58to DPR-34 2.
Safety Evaluation cc w/ enclosures:
See next page DISTRIBUTION
J. Calvo P. N na K. Heitner 0GC-Bethesda E. Jordan J. P rtl w ACRS (10)
PD4 Plant File f
M L
- See previous concurrences:
PD4/LA*
PD4/PM*
[0
-8 hesd P 4/D PNoonan KHeitner: sr E han pJCalvo 01/g /88 N
10/26/87 10/28/87 c
1 BON S
h 0P. ketoyb.
( fj
F; p
~
Docket No. 50-267:
Mr. R.-0. Williams, Jr.
-Vice President, Nuclear Operations Public Service Company of Colorado
- Post Office Box 840.
Denver,-Colorado-80201-0840-
Dear Mr. Williams:
AMENDMENT NO.
'FORTST.VRAINNUCLEARGENERATINGSTATION(TACN
SUBJECT:
TO FACILITY OPERATING LICENSE NO. DPR,
The Commission has issued the enclosed Amendment No.-
to Facility O License No. DPR-34 for the Fort St. Vrain Nuclear Generating Station.perating This. amendment consists of changes to the Technical Sp(ecifications (TS) in-response.to your application dated April 23, 1987 P-87100).
This amendment revises the Technical Specifications concerning the sur-veillance and calibration requirements of the Plant Protective System (PPS).
Specifically, it deletes a spe::ific test method used to demonstrate operability requirements and allows the use of another equivalent method.
A copy of the Safety Evaluation is enclosed.
The Notice of Issuance will be included in the Ccmmission's next Bi-weekly Federal Register notice.
Sincerely, KennethL.Heitner,ProjectManager ProjectDirectorate-IV Division of Reactor Pro;ects - III, IV, V and Special Pro;ects Office of Nuclear Reactor Regulation
Enclosures:
1.
Amendment No.
to DPR-34 2.
Safety Evaluation cc w/ enclosures:
See next page DISTRIBUTION:
Wanda Jones FSV File OGC-Bethesda Docket H ie DHagan,
' -EJordan EButcher 1
NRC PDR PNoonan(3)
ACRS(10)(4)
Local PDR KHeitner JPartlow PD4 Reading JCalvo ARM /LFMB TBarnhart LTR NAME: FSV 882 PD4/LA PD4/PMb,y OGC-Bth[N PD4/D PNoona KHeitner:
C JCalvo
./0/J//87 10/s/87 u/ /87
/ /87
1,=,
t Mr. R. O. WiFiiams,'Jr. n Public Service Company pf Colorado Fort St. Vrain cc:
Mr. D. W. Warembourg,ivisionManager Albert J. Hazle, Director Nuclear Engineering D Radiation Control Division Public Service Company Department of. Health of Colorado 4210 East lith Avenue P. O. Box 840 Denver, Colorado.80220 Denver, Colorado 80201-0840 Mr. David Alberstein,'14/159A Mr. R. O. Williams, Jr.,ionActing Manager Nuclear Production Divis GA Technologies, Inc.
Post Office Box 85608 Public Service Com3any of Colorado San Diego, California 92138 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Mr. H. L. Brey, Manager Nuclear Licensing and Fuel Division Mr. P. F. Tomlinson, Manager Public Service Company of Colorado Quality Assurance Division P. O. Box 840 Public Service Com3any of Colorado Denver, Colorado 80201-0840 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Senior Resident Inspector U.S. Nuclear Regulatory Commission Mr. R. F. Walker P. O. Box 640 Public Service Company of Colorado Platteville, Colorado 80651 Post Office Box 840 Denver, Colorado 80201-0840 Stansfield & 0'Donnell Kelley, Service Company Building Commitment Control Program Public Room 900 Coordinator 550 15th Street Public Service Company of Colorado Denver, Colorado 80202 2420 W. 26th Ave. Suite 100-0 Denver, Colorado 80211 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Chairman, Board of County Commissioners of Weld County, Colorado Greeley, Colorado 80631 Regional Representative Radiation Programs Environmental Protection Agency 1 Denver Place i
999 18th Street, Suite 1300 Denver, Colorado 80202-2413 l
i
P j#*
%S UNITED $TATES t
NUCLEAR REGULATORY COMMISSION WASHmGTON, D. C. 20555 PUBLIC SERVICE COMPANY OF COLORADO DOCKET NO. 50-267 FORT ST. VRAIN NUCLEAR GENERATING STATION AMENDMENT TO FACILITY OPERATING LICENSE Amendinent No. 58 License No. OPR-34 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Public Service Company of Colorado (the licensee) dated April 23, 1987, complie with the standards and requirements of the Atomic Energy A t of 1954, as amended (the Act), and the Commission's ruls and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance:
(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
l t
l I
l
, n cm ? ' _
(), ) g ee.
oousvuv
.' 2.
Accordingly, the 1(caine is amended by changes to the Technical Specifications Ls indicated in the attachment to this license amendment, and paragraph 2.0(2) of Facility Operating License No.
DPR-34 is hereby amended to read as follows:
-(2), Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 58, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
.This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION h L$hr A.fu%
tv Jose A. Calvo, Director Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: January 22; 1988
a#
ATTACHMENT TO LICENSE AMENDMENT NO. 58 TO FACILITY OPERATING LICENSE NO: OPR-34 DOCKET NO. 50-267 Replace the following pages of the Appendix A Technical Specifications with the attached pages as indicated.
The revised pages are identified by amendment number and contain vertical lines indicating the areas of change.
Remove Insert 5.4-2 5.4-2 5.4-3 5.4-3 5.4-4 5.4-4 5.4-5 S.4-5 5.4-6 E.4-6 5.4-7 5.4-7 5.4-8 5.4-8 5.4-9 5.4-9 5.4-10 5.4-10 5.4-10a 5.4-11 5.4-11 5.4-11a 5.4-11b 5.4-11c 5.4-11d 5.4-11e i
i I
I l
E
JorB SS. Brain 6 m '
Technical Scecifica^1 Amenctent No. M ben s'.
Page 5.4-2
.I i
Calibration frequency of the instrument channels listed in-Tables 5.4.1, 5.4.2, 5.4.3, 5.4.4 are divided into three categories: passive type indicating devices that can be compared with like units on a continuous casis; semiconcuctor devices and detecto-5,that may drif t or lose sensitivity; arc on-of f sensors
.{
1 which must be tripped by an external source to cetermine their sespoint.
Drift tests by GGA on transducers similar to the reactor pressure transducers -(FSAR Section 7.3.3.2) indicate insignificant long term drift. -Therefore a once per refueling cycle calibration was selected for. passive devices (thermo-couples, pressure transducers, etc.).
Devices incorporating semiconductors, particularly amplifiers, will be also calibrated on a once per refueling cycle basis, and any drift in response or bistable setpoint will be discovered from the. test' program.
Drift of electronte apparatus is not tne only consideration in cetermining a calibration frequency; for example, the change in power distribution and loss of detector cham:er sensitivity require that the nuclear power range system be calibrated every month.
On-off sensors are caliorated and ta ted on a once per refueling cycle basis.
The Surveillance Re uirements for the Steam Line Ruoture Detection / Isolation System instrumentation in Table 5.4-3 include crevisions fo'r CHANNEL CHECA, CHANNEL CALIBRATION, CHANNEL e
FUNCTIONAL TEST and an ACTUATION LOGIC TEST.
The frecuency of CHANNEL -CALIBRATICN, REFUELING, is consistent with the interval for testing-and calibrating similar detectors (heat sensitive cabling used for fire cetection).
The manufacturer of the instrumentation recommends an 18 month interval for t.st/ calibration of the electronics oc tion of the Steam Line Rueture Detection / Isolation System, tnus, the CHANNEL FUNCTIONAL TEST is scecified for tnat interval.
Tne ACTUATION LOGIC TEST is j.
soecified for a REFUELPG interval.
Tite ACTUATION LOGIC TEST verifies proper operation of the SLRDIS Detection and Logic Racks f rom a simulated rate-of-rise input signal througn and
'1cluding actuation of the output logic relays, i'me response of the SLRDIS Detection and Logic Racks 12 verified tc be equal to or less than 7.1 seconds as assumed in the high energy line break analysis. The potential for an inadvertent actuation during testing suggests that logic testing be performed only when the plant is in SHUTOOWN.
Thus, the surveillance requirements are scecified for REFUELING but not to exceed 18 montns.
The SLRDIS l
control unit includes a supervision system snat cont'nuously and automatically monitors critical circuitry and internal comconents, and alarms SLRDIS trouble conditions to the i
c erators.
Tests and ca11 orations of instrument channels in Tables 5.4-1, 5.4-2, 5.4-3 and 5.4-4 may be performed with either in 9 tnal or l
external test signals.
Use of sne internal test signal is preferred, while ecuivalent external te.; signals are equally acceptable.
t
,e e
For St. Vrain #1 Tee"ical Specifications Amer: ment No. 22, 58 Page 5.4-3
(*
TABLE 5.4-1
' MINIMUM FREQUENCIES FOR CHECKS. CALIBRATIONS. aC TESTING OF SCRAM SYSTEM l
l Cnannel l
l l
l l
l Descriotion l
Function I Frecuency( 1)l Wethod I
l l 1. Manual
- 14. Test i
R la. Manwally trip l
l l
(Control Room)I I
I system.
l l
l 2. Manual (1-49) la. Test i
M ia. Man. ally trip each I l
l I
char e1.
l l 3. Startup la. C.w ck l
0 la. Com:arison of two l
e l
Channel l
l l
sepa-Ate channel I
I I
I 1
indi:ators.
I l
l lb. Test i
P le' Appif test l
l l
l l
l sigral to verify l
l l
l j
l tri;s and alarms.
l l
lc. Calibratel R
lc. Inte nal test l
l l
l l
sigral shall be l
l l
l l
che:'ed and l
l l
l l
cald:ratec to l
I l
l l
l assu-e that its l
l 1
l l
out:;t is in l
l 1
l l
acc: cance with thel l
l l
l des *;n I
l l
l l
requirements. Thisl l
l l
l Shall be done afterl l
l l
l cem; eting the l
l l
l l
exte-nal test l
l l
l l
sigral procedure byl l
l l
l che:(ing the output l l
l l
ine':ation wnen l
l l
1 I
turr*ng the l
l l
l l
inte nal test l
l l
l l
siceal switch.
ta. Cee.carison c N _ l l 4. Linear Power
- 14. Check l
0 1
l Channel l
l l
sece v e crannel l
l l
1 l
inc :stors.
I l
l lb. Test l
M lb. Appif test l
l 1
I I
s1gral to verify l
l l
l l
tri:5 and alarms.
l l
lc. Calibratet 0
lc. Chae el adjusted tot 1
l l
1
- ree witn heat l
l 1
l 1
calance l
l l
l l
ca ulation.
l l
l Id. Calit itel R
jd. Apply test I
I i
I i
sig als to adjust l l
l 1
i tri;s and l
l 1
l 1
ine*:ations.
I l S. wice Range la. Check l
C-
- s. Cor:arison of tnreel Powe-Channel l l
t seca ate l
l 1
l l
inc :ators.
1
' Fort St. Vrain #1
~
Tecnnical Specifications Amenament No. 25, 68 Page 5.4-4 TABLE 5.4-1 MINIMUM FREQUENCIES FOR CHECKS. CALIBRATIONS. AND TESTING OF SCRAM iv5 TEM (Cont'c)
[
Channel l
l 1
I l_
Descriotion-l Function IFrecuency(1)!
Weth'od l
l l 5. (Cont'd) lb. Test l
P
- 10. Apply test.
l-l l
l l
signals to verify l l
l l
l trips and alarms.
l l
lc. Calibratel M
lc. Channel adjusted to]
l l
l l
agree with heat l
l l
l l
balance l
l l
l l
calculation.
l l
l ld. Calibratel R
Id. Apply test l
l l
l l
signals to adjust l l
l l
l trips and l
l 1
l l
indications.
l l 6. Primary
- 14. Cneck l
0 la. Comparison of two l l
Coolant l
l l
separate high levell l
Moisture (All l l
l channel mirror l
l Channels) l l
l temperature l
l l
l l
indications.
l l
lb. Check l
0 lb. Comparison of six l l
l l
l separate low level l l
l l
l channel mirror l
l l
l l
temperature l
l l
l l
indications.
l l
lc. Calibratel R
lc. Inject moisture l
l l
l l
laden gas into l
l l
t j
sample lines.
l l
id. Check i
O lc. Verification of I
l l
l l
eight separate l
1 I
I I
monitor's sample l
l l
l l
flow, per Item (t) l l
l l
l of Notes for Tables l I
l l
l 4.4-1 through I
l l
l l
4.4-4.
l a
l le. Test l
M le. Verify that each of f l
l l
l the eight monitors l l
l l
l will alarm on low l l
l l
l and high sample l
l 1
1 flow.
I l 7. Primary la. Test i
M la Trip one nigh l
l Coolant l
l l
level, one icw l
l Moisture (High!
[
l level channel.
l l
Level l
l l
pulse another low l l
Channels) l I
I level channel.
l l
~ ort St. Vrain 81 fectrical Specificatiens i
Amere ent No. 73, 58 Page 5.4-5 TABLE 5.4-1 MINIMUM FREQUENCIES FOR CHECKS, CALIBRATIONS. AC TESTING OF SCRAM SYSTEM (Cont'c)
I Cnannel l
l l
l l
Descriotion i
Function IFrecuency(l))
v thod
[
e
] 8. Reneat Steam la. Cneck l
0
- 14. Com:arison of sne l
l Temperature l
l l
averaged l
l
]
l l
the r.moccuple l
l l
l l
channel input l
l l
l l
indications.
l I
lb. Test i
M lb. Trip channel, I
l l
l l
verify alarms and l l
l l
l indications.
l l
l l
l 1
Apply test l
l l
l l
signal to verify
]
l 1
l l
trips and alarms.
I I
Ic. Calibrate l R
Ic. Comeare each l
l l
l l
thermccouple outputi l
l l
l to an NBS traceaclel l
l l
l l
standard. Apply l
l l
l l
test signal to l
l l
l l
adjust trips and l
l f
I I
indicators.
l l 9. Primary la. Check l
0 la. Comparison of six l
l Coolant l
l 1
separate channel l
l Pressure l
l l
indicators.
l l
lb. Test l
M lb. Trip channel, l
l l
l l
l apoly test l
l l
l l
signal to verify l
I I
I I
trics and alarms.
l l
lc. Calibratel R
Ic. Known pressure l
I l
l l
applied to sensor. l l
l t
l l
Apply test l
l
]
l l
signal to d just l
l l
1 l
tries and l
l l
l I
indicators.
l l10. Circulator ja. Cneck i
O la. Comparison of eignti l
Inlet l
l l
separate l
l Temperature l
l l
indicators.
l l
lb Test l
M lb. Trip enannel, I
l l
l l
l apply test l
l l
l l
signal to verify l
l l
l l
trips and alarms.
I l
tc. Calibrate l R
tc. Compare each l
l l
l l
thermocouple outputi l
l l
l to an NBS traceablel
]
l l
l l
standard. Apply I
l l
l test signal to l
l l
l l
adjust trips and l
l l
l t
irdicators.
I
4 Fort St..Vrain 11 2
Technical Seecific *i A.=endment No. M. S ons' Page 5.4-6 TABLE 5.4-1 MINIMUM FREQUENCIES ICR CHECKS, CALIBRATICNS AND TESTING OF SCRAM SYSTEM (Cont'c) l Cnannel l
l
[
j l
l Descrietion i
Function !Crecuency(1)!
Method I
Ill. Hot Reneat la. Test i
M la. Recuce pressure at l I
Header l
l l
sensor to trip-l l
Pressure I
I channel, verify I
I I
i alarmt and i
l l
l l
l indications.
1 l
lb. Calibratel R
lb. Known pressure
]
l l
l l
applied at sensor l l
l 1
to adjust tries.
l 112. Main Steam la Test i
M la. Recuce pressure at i i
Pressure l
l l
sensor to trip l
l l
l l
.cnannel, verify-l l
l l
l alarms ana l
l l
l l
incications.
l l
lb. Calibratel R
Ib. Knewn pressure l
l l
l l
l applied at sensor l l
l 1
l to adjust tries.
l 113. Two Loop la. Test i
M la. Special test eceulet l
Trouble l
l l
used to trip l
l l
l l
channel by l
l l
l l
energiz.ng each of l i
l l
l four appropriate l
l l
l l
1 cairs of two-1 cop I
l l
l
'l trovole relays.
I i.
I lb. Test i
R
!b. Trip logic to causel j
l l
l two loop trouole
[
.l l
I I
l j
l14 Plant 480 y la. Test l
M la. Trip eacn cnannei l
I Power Loss l
l l
by applying l
l l
l l
simulated loss of I
i l
l l
l voltage signal; I
I l
l l
1 verify alarms and l l
I I
i indications.
I m_
! J For*, St. Vrain W1
~
To:nn.ical 5:e:1fications Amenceent No. 50, 58 Page 5.4-7 TABLE 5.A-1 MINIMUM FREQUENCIES FOR CHECKS. CALIBRATICNS. AND IESTING OF SCRAw SYSTEM (Cont'c) l' Cnannel l
l l
l l
Descriotion i
Function (Frecuency(1)!
Method l
115. Hign Reactor la. Cne:A l
0 la. Cce:arison of threel l
Building l
l l
separate channel l
l Temperature l
l l
Indicators.
l l
(Pipe Cavity) lb. Test i
M lb. Trip channel, l
I I
I i
veri'y alarms and I l
l l
l indications.
l l.
l l
l l
Acoly test l
l l
l l
signal to verify l
l l
j l
trips and alarms.
l l
Jc. Calibratel R
tc. Compare cach l
l l
l l
tnermocovole outputi l
l l
l to an NBS traceable l l
l 1
I standare to adjust l l
l l
l tem:erature trip i
l I
i i
ceint.
I NOTE 1: 0 - Daily when in use M - Monthly R - Once per refueling cycle P - Prior to each start up if not cone previous week e
Fort St. Vrain>el Iechnical Specifi" tions Amenc ent No. 25, Page 5.4-8 t
TABLE 5.4-2 l
}'
MINIMUM FREQUENCIES FOR OWECKS. CALIBRATIONS. AN: TESTING 0F LOCP SnUT00hN SYSIEM
~
l Cnannel l
I l
l l
Description 1
Function IFrecuency(1)I v thod l
e l
l 1. Deleteo I
l l
l I
I I
i I
l 2. Deletec l
l 1
I l
l I
i l 3. Circulator 1A la. Test l
M la. Pulse test and l
l and IB Trioped!
l l
verify proper l
l l
l l
indications.
l l
lb. Test l
R lb. Trip botn i
l l
l l
circulators to testi l
l i
i loco smutdown.
l l 4. Circulater 1C 14. Test i
M la. Puise test and l-l and 10 Trippedi l
[
verify proper l
l l
l l
indications.
l l
lb. Test i
R lb. Trip toth l
l l
l l
circulators to testl l_
i I
looo shutd:wn.
1 l 5. Steam la. Test l
M la Pressure switenes l
l Generator l
l l
actuated by l
l Penetration l
l l
pressure applied.
l Pressure Ib. Test l
M lb. Pulse test each l
l l
l l
channel with l
l l
l l
another channel l
l l
l trippec and verify l l
l l
l proper indications.1 l
lc. Calibrate l R
lc. Known cressure i
l 1
l l
applied at sensor i l
l l
t to acjust trip.
l I
I I
I I
f
m Feet St. Vrain #1 Tecnnical 5:ecifications Amensment No, M Page 5.4-9 TABLE 5.4-2 MINIMUM FREQUENCIES COR CHECKS CALIBRATIONS AND TESTING OF LOOP SHUTCCwN SYSTEY (Cont'c) l Cnannel 1
I I
i l
Cescriotion l
Function 1 Frecuency( l)!
Method
[
l 6.
Reneat Heacerla. Cneck l
0 la. Comparison of tnreel l
Activity l
l l
separate ircicatorsi I
I I
i in eacn loco.
I l
lb. Test
]
M lb. Pulse test each l
l l
l l
channel with l
l l
1 l
another channel l
l l
l l
trippeo and verify l l
l l
l proper indications.l l
lc. Calibrate l R
Ic. Expose sensor to l
l l
l
[
known radiation l
l l
l l
source and adjust l
l l
l l
trips and l
l i
i I
indicators.
l l 7. Sweerneat la Check i
0
- 14. Comparison of 3 l
l Header l
l l
separate l
l
. Temperature l
l 1
teeperature i
l l
i l
indicators per l
1 l
l l
loop.
l l
lb. Check l
0 lb. Comparison of 3 l
l l
l l
separate l
l l
l
[
temperature
[
]
l l
l differential l
l l
l 1
incicators.
l l
lc Test l
M Ic. Pulse test one l
l l
l l
channel with l
l l
l l
anotner enannel l
l l
l l
trippec anc verify l l
l l
l procer indications.l l
Id. Calierate!
R ld. Comcare each l
l l
l l
therm: couple output l l
l l
l to an NBS traceablel l
l l
l l
standarc. Apply l
l l
l l
test signal to l
l l
l l
acjust trips and l
l l
1 indicators.
I r
i I
h L
Fort St. Vraie #1, Technical Specifications Acenc ent No. 58 Page 5.4-10 TABLE 5.4-2 MINIMUM FREQUENCIES FOR CHECKS. CALIBRATICNS, AND TESTING OF LOOP SnuTD0eN SYSTEM (Cont'c) l Cnannel l
.)
I l
l Descriotion i
Function IFrecuency(l)I Method l
l 6. Primary la. Test l
M la. Trip eacn enannel, I l
Coolant l
l l
verify proper l
l Moisture (Low l I
l indications.
l l
Level.
Ib. Test i
M lb. Trip each channel, !
l Channels) l l
l pulse test other l
l l
l l
1000 to check loep l-l I
l t
icentification.
l l 9. Primary la. Test l
M la. Pulse test one l
l Coolant l
l l
channti with l
l Pressure l
l l
another' channel l
l l
l l
trie:ed and verify l l
l l
l precer indications,l l
1 I
botn channels.
l NOTE 1: 0 - Daily when in use M - Monthly R - Once per refueling cycle P - Prior to each start-up if not cone previous week l
,6
- ~
Fc*t St. Vraini1 Tec-nical Specificatiens Are cment No. 22, 58 Page 5.4-11 TABLE 5.4-3 MINIMUM FRE0VENCIES ~0R CWECKS, CALIBRATIONS. AND TESTING OF CIRCULAT6R TRIP SYSTEM I
Cnannel l
l 1
I l
Descriotion l
Function IFrecuency(1)I Yethod I
i 1. Circulator la. ChecA i
0 la. Co :arison of 6 l
l Speec-Steam l
1 l
se:arate speed l
l a n d 'n'a t e r I
l l
incications per l
l l
1 l
circulater.
I l-I lb. Test i
M lb. App;y test l
l l
l l
siges1 to verify l
l l
l l
ted:. setting and l
l l
l l
incicators.
l l
lc. Test i
M lc. Pulse test one l
l l
l l
channel with l
l l
l l
ancther channel l
l l
l l
tr : ped, and verify l
~
l l.
l l
Tre:er indications l l
ld. Calibrate l R
ld. Knewn culse l
l l
l l
frequency applied l 1
l
.I l
at sensor to adjustl l
l l
l trips and i
_l l
l l
iacicators.
l l 2. Feedwater Flowla. Check l
0 la. Co :arison of 6 l
l l
l l
se:arate indicators l l
l l
l per loop.
I l
l lb. Test l
M lb. ADDIy test l
l l
l l
signal to verify i
I l
l l
trip setting and l
l l
l l
incications.
l l
Ic. Test i
M lc. Pulse test one 1
l l
l l
cnannel with l
l l
I arother channel l
l l
l l
tricped, and verify]
l l
l l
pre:er indications.l l
ld. Cal %ratel R
Id. Acely known delta Pl l
l l
l at flow l
l l
l l
transmitter.
l l
l l
l l
Acoly test l
l l
l l
sig al to adjust l
l l
l l
trics and l
l 1
l l
irdicators.
l 1 3. Circulater la. Cr.eck i
O la. Com:artson of 3 l
l Bearing Water l l
l separate l
l Pressure i
l I
incicators/
l l
I l
l ci culator.
I t
l 1
(.
J 2
tort St.-Vrain c1 Tecnnical Specifications Amenc.ent No. 58 Page 5.4-11a TABLE 5.4-3 MINIMUM FRE0VENCIES FOR CHECKS, CALIBRATICNS, A*C TESTING 0 CIRCULAICR TRIP SYSTEM (Cont'd) l Cnannel i
I l
{
l Description i
Function !*recuency(1)I w th0d l
e l 3. (Cont'c) 1o. Test l
M
- 10. Pu)se test one i
i l
l l
channel with
[
l-l l
l anotner channel l
l l
l.
l tripped and verify l l
1 l
l proper indications.1 l
.lc. Calibratel R
Ic. Known pressure I
l i
l I
applied to adjust l l
l 1
I trio settino, i
l 4. Circulator 1a. Test l
M la. Pressure switenes l l
l l
actuated by l
l Pressure l
l l
cressure applied.
l l
- 16. Test l
M lb. Pulse test one l
l l
l l
channel with l
i l
l l
anotrer channel l
l l
l l
tripped and verify l l
l 1
l procer indications.l l
lc. Calibratel R
lc. Known pressure I
t l
l l
applied at sensor l l
l l
l to adjust trip l
l l
l l
settino.
l l 5. Circulator la. Chect l
0 la. Comparison of 3 l
l Drain Pressure]
l l
separate l
l l
1 l
indicators /
l l
l l
l circulator.
l l
lb. Test l
M lb. Pulse test one l
l l
l l
channel with l
l l
l l
another channel l
l l
l l
tripped and verify l l
l l
1 proper indications.1 l
\\c. Calibrate l R
(c. Known pressure l
l l
l t
appliec at sensor l l
l l
l to adjust trip l
l l
1 i
settino.
l l 6. Circulator la. Cneca, t
0 la. Comparison of 3 l
l Seal l
l l
separate 1
l Malfunction l
1 l
incicators/
I l
l l
l circulator.
I l
lb. Test l
M lb. Pulse test one 1
l l
l 1
channel with l
[
l l
l another channel I
i l
l l
l t-ipped and verify l l
l l
l oroper indications.l l
l v
4
Fort St. Vrain #1 Technical Spec.81 cation $
Amencment No.
Page 5.4-11b TABLE 5.4-3 MINIMUM FREQUENCIES COR CwECKS, CALIBRATIONS, AND TESTING OF CIRCULATOR TR!p SYSTEM (Cont'c)
S l
Cnanne) l l
l l
l Descri: tion i
Function !Frecuency(1)!
Method l
l 6. (Cont'c)
Ic. Caiteratei R
ic. Anown pressure l
l l
l l
applied at sensor' l l
l-l l
to adjast trip l
l I
I I
settino.
l l 7. Circulator la. Test l
R la. Trio steam turoine l l
Trip (Manual) l l
l drives. Verify l
l l
l l
water turbine l
l l
1 I
automatic start.
l NOTE 1:
0 - Daily when in use M - Monthly R - Once per refueling cycle p - prior to eacn start up if not done previous week
I l" *
(
Fort St. Vrafn #1 l
Te:Mical Scecifications L
Av. enc ent No. 58
,e Page 5.4-11c l
TABLE 5.4-3 MINIMUM FREQUENCIES CCR CHECKS, CALIBRATIONS, aND TEST lN3 0F CIRCULAICR TRIP SYSTEM (Cont'c) l.
CHANNEL CHANNEL ACTUATION l
l FUNCTIONAL CHANNEL CALIBRA-FUNCTIONAL LOGIC l
lNO.
UNIT CHECK TICN TEST TEST APPLICABILITY l 1
l l84. Steam Leak D
R(a)
R(a)
R(c)
At Pcwer*
j.
l Detection l
l Turbine Building l
l Loop 1 l
l l
18b. Steam Leak D
R(a)
R(a)
R(b)
At Power
- l l
Detection l
l Reactor Building l
l Loop 1 l
l l
lac. Steam u ak D
R(a)
R(a)
R(b)
At Power" l
l Cetection l
l Turbine Building l
l Loop 2 I
I I
18d Steam Leak D
R(a)
R(a)
R(b)
At Power
- l l
' Detection l
l Reactor Building l
l Loop 2 l
l I
Notes to lines 8a. through Sd above only:
(a) The calibration / test consists of verifying the rate of rise setpoint and checking for opens and shorts in the sensor caele.
(b) The SLRDIS Detection and Leric racks shall be verified to have a response time less than or e w al to 7.1 seconcs wnen a simulated rate-of-rise trip input signal is used to actuate the output relay logic.
R - At least once per Refueling cycle, not to exceed 18 months Acplicable only above 2?. RATED THERMAL POWER D - Caily
Fort St. Vrain #1 e
TechnicalSpecffications Amencment No. Do Page 5.4-11d TABLE 5.4-4 MINIMUM FRE0VENCIES FOR CHECKS, CALIBRATION $. AND TESTING OF ROD 'elir0RAwAL pRCm!Bli SYSTEM l
Cnannel l
I I
J l
Description I
Function ! Faeovency( 1)I Method
(
i 1. Start up la. Cneck i
O la. Comparison of two-l l
Channel l
l l
separate channel l
l l
l l
indicators.
[
]
l lb. Test l
P lb. Apply test I
_l l
l l
signal to verify.
1 l
l l
l all trips and l
l l
l l
alarms.
I l
Ic. Calibratel R
lc. The internal test l l
l l
l signal shall'be l
l l
l l
checked and l
l l
l l
calibrated to l
l l
l l
assure that its l
I i
l l
output is in l
l l
l l
accordance with thel l
l l
l design l
l l
l l
recuirements.
Thist l
l l
l snall be done afteri l
l I
I completing the l
l l
l l
external test l
l l
l l
signal procedure byl l
l l
l checking the outputi l
i l
I indication when i
l l
l l
turning the l
l l
l l
internal test l
l l-1 I
sicnal switch.
l I 2. Linaar Cnannella. Cneck l
0 la. Compartson of 6 l
l l
l l
l separate level l
l l
l l
indicators.
l l
l lb. Test l
M lb. Apply test l
l l
l l
signal to verify I
l l
l l
trips and alarms.
I l
lc. Calibratel D
lc. Channel adjusted tel l
l l
l agree with heat l
l l
l l
balanca l
l I
I l
l calculation.
1 l
l ld. Calibratel R
ld. Apply test l
l l
l l
signals to adjust i
I I
I l
trips and I
l l
l 1
indications.
l 1 3. wice Range la. Check l
0 la. Comparison of snreel i
l Power Channel l l
l separate l
l l
1 i
indicators.
l
Fort St. Vrain 81 Tecnnical Specifications Amencment No. 58 Page 5.4-11e TABLE 5.4-4 MINIMUM FREQUENCIES FOR CHECKS. CALIBRATICNS, AND TESilNG OF RCO WIinDRAWAL PRCmlBIT SYSTEM (Cont'c) l Cnannel l
t i
t l
Descriotion I
- unction I Frecue ncy( 1)!
Method l
l l 3. (Cont'd) lo. Test i
P lo. Apply test l
l l
l l
signals to verify i I
I l
I trios and alarms.
l l
Ic. Calibra-l M
lc, Channel adjusted tol l
I tion l
l agree with heat l
l l
l l
balance 1
i l
i I
calculation.
I l
l ld. Calibra-l R
ld. Apply test l
l l
tion l
l signals to adjust l l
l 1
I trips and
[
l I
I I
indications.
l l 4. Multiple Roc la. Test l
P l4. Attempt two roc j
l Pair l
l l
pair withdrawal.
l l
Withcrawal (b. Check l
R lb. Simulate current l
l l
l l
through sensor to l l
l l
l verify trip and l
l l
t I
alarms.
l NOTE 1:
0 - Daily when in use M - Monthly R - Once per refueling cycle p - Prior to each start up if not done previous week L
/
'o UNITED STATES O.
NUCLEAR REGULATORY COMMISSION W ASHING TON, 0. C. 20555
%,... + $
SAFFTY EVALUATION BY THE OFFICE OF NUCLEAR REACTOP PFGULATION SUPPOP. TING AMENDMENT NO. 58 TO FACILITY OPERATING LICENSE NO. DPR-34 PUBLIC SERVICE COMPANY OF COLORADO FORT ST: VPAIN NUCLEAR GFFFRATtNG STATION DOCKET NO. 50-267
1.0 INTRODUCTION
in letter dated April 23, 1967, the Public Service Company of Colorado requested a charge to the Technical Specifications for Fort St. Vrain Nuclear Generating Station.
The proposed change was nainly concerned with allowing the use of external test signals for testing eouipment.
Present Technical Specificatiens only allow the use of internal test signals.
Pcth the internal and external test signals are to be cali-brated to treceable NBS standards. This change is all inclusive within the Technical Specifications with the exception of the scram and rod withdrawal prohibit startup channel celibration requirements.
An applied test signal, whether internal or external demonstrates func-tional operability and verification of channel response within a spect-fied range and accuracy. The testing process will ensure the capability of safety systers to perforTn their intended function using either an exterral or internal test signal. Proper surveillance procedures are stated to exist to ensure that appropriate calibration and verificatinn test methods are perforced to derenstrate operability requirements.
The Fort St. Vrain proposed Technical Specifications change also requests to nake some editorial changes. These changes are to revise selected tables to display requirements in vertical tables.
2.0 EVAltlATION The ecuipment was originally designed only with the capability for internal calibration. This was accepted by the staff.
In this change, the licensee proposes that an external test signal calibrated to the same i
standards roay also be used.
The basic process for testing the equipment remairs unchanged. Only l
the source of the test signal is different, but the test signals will be equivalent, as they are both celibrated to traceable NPS standards.
l l
l l
grosoroa P;'
D.
s a
- Thus, the equipment is calibrated to an equivalent level of accuracy, and can perform it's design function acceptably.
One potential concern is that the licensee could fail to properly realign a channel after calibration with an external test signal.
However, the instrumentation in the plant protective system is designed to be tested in accordance with IEEE Standard No. 279.
Calibration activities are usually controlled by written procedures.
The staff concludes that these design standards and the use of procedures are an acceptable means of dealing with this potential concern.
A second potential concern is that incorrect use of the external test signals could place the reactor or reactor systems in an unsafe condition.
However, at Fort St. Vrain, the protective system channels are independent from control system channels.
Hence, an erroneous test signal cannot cause an undesirable control system response.
If an erroneous test signal is appiled, the channel 'may tesc "inoperable".
The licensee will then have to correct the problem within the requirements of the Technical Specifica-tions.
The staff concludes that there will not be a problem from erroneous external test signals.
The propored Technical Specifications changes are, therefore, acceptable.
3.0 ENVIRONMENTAL CONSIDERATION
The amendment relates to changes in the installation or use of facility components located within the restricted area.
The staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite and that there is no significant increase in individual or cumula-tive occupational radiation exposure.
The Commission has previously issued a proposed finding that this amendment involver no significant hazards consideration and there has been no public comment on such finding.
Accordingly, this amendment meets the eligibility criteria (c)(10) for categorical exclusion set forth in 10 CFR $51.22.
Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of this amendment.
4.0 CONCLUSION
The staff has concluded, based on the considerations discussed above that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the prcposed manner, and (2) such activities will be conducted in compliance with the Commission's regulations and the issuance of this amendment will not be inimical to the common defense and security e to the health and safety of the public.
Dated: January 22, 1988 Principal Contributor:
R. Lasky, ICSB