ML20196A273

From kanterella
Jump to navigation Jump to search
Forwards Reactor Containment Bldg Integrated Leak Rate Test, Performed on 880326-28
ML20196A273
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 06/24/1988
From: Loflin L
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20196A277 List:
References
NLS-88-153, NUDOCS 8806290508
Download: ML20196A273 (1)


Text

..

.t C9&L Carolina Power & Light Company JUN 2 41988 SERIAL:

NLS-88-153 10CFR50, Appendix J United States Nuclear Regulatory Commission

{

ATTENTION: Document Control Desk Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PIANT, UNIT NO. 2 DOCKET No. 50-324/ LICENSE NO. DPR-62 INTEGRATED LEAK RATE TEST RESULTS Gentlemen:

In accordance with the provisions of 10CFR50, Appendix J, Paragraphs V.B.1 and V.B.3, Carolina Power & Light Company hereby submits.the results of the Brunswick Steam Electric Plant, Unit 2, Integrated Leak Rate Test performed March 26 through March 28, 1988. Representatives from the NRC witnessed the test; their findings are discussed !n Inspection Report No. 50-325/324/88-16, dateo May 20, 1988.

Please refer any questions regarding this submittal to Mr. Stephen D.

Floyd at (919) 836-6901.

Yours very truly, f0]

Leonard I, flin Manag Nuclear Licens ng Section BAB/bab(\\cor\\ilrtres)

Enclosure ec:

Dr. J. Nelson Grace W/A Mr. W. H. Ruland W/A Mr. B. C. Buckley W/A folf I (

411 Fayetteville Street

  • P O Box 15$1
  • Raleigh, N C 27602

.z 8806290508 880624 PDR ADOCK 05000324

(.

P DCD

__ _