ML20196A204

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-285/88-12 on 880404-08 & 18-22 & Notice of Violation.Concern Expressed Re Apparent Inattention to Detail Which Resulted in Individuals W/Lapsed Qualifications Performing Signature Approval
ML20196A204
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 06/23/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20196A208 List:
References
NUDOCS 8806290482
Download: ML20196A204 (2)


See also: IR 05000285/1988012

Text

--

r

e.

. " -

JUN 2 31988

,

In Reply Refer To:

Docket: 50-285/88-12

Omaha Public Power District

ATTN:

R. L. Andrews, Division Manager-

Nuclear Production

1623 Harney Street

-

Omaha, Nebraska 68102

Gentlemen:

This. refers to the inspection conducted by Messrs. J. E. Gagliardo and

G. A. Pick of this office during the period April 4-8 and 18-22, 1988, of

activities authorized by NRC Operating License DPR-40 for the Fort Calhoun

Station, and to the discussion of our findings with members of your staff at

,

L

the conclusion of the inspection.

The area examined during the inspection was the licensed operator training

program. Within this area, the inspection consisted of selective examination

of procedures and representative records, interviews with personnel, and

observations by the NRC inspectors. The inspection findings are documented in

the enclosed inspection report.

.

During this inspection, it was found that certain of your activities were in

viola *. ion of NRC requirements.

Consequently, you are required to respond to

)

this violation, in writing, in accordance with the provisions of Section 2.201

'

of the NRC's "Rules of Practice," Part 2. Title 10, Code of Federal

Regulations.

Your response should be based on tne specifics contained in the

Notice of Violation enclosed with this letter.

We have also examined actions you have taken with regard to previously

identified inspection findings.

The status of these items is identified in

paragraph 2 of the enclosed report.

We are concerned about the weaknesses, identified in paragraph 3 of the

enclosed report, regarding the apparent inattention to detail which resulted in

individuals, whose qualifications had lapsed, performing signature approval

,

normally assigned to licensed senior reactor operators.

As part of your

response to the Notice of Violation, please address the corrective actions you

have taken or plan to take to assure that this problem does not recur.

The response directed by this letter and the accompanying Notice is not subject

,

to the clearance procedures of the Office of Management and Budget as required

by the Papemork Reduction Act of 1980, PL 96-511.

j

h\\$

RIV:RI*

C:0PS*

D:DRS*

C:DRP/B*

RP

Reconc

GAPick/tw

JEGagliardo

JLMilhoan

TFWesterman

L allan

JEGagl

o

/ /88

/ /88

/ /88

/ /88

4/22/88

/ /23

q

,

  • previously concurred

~

8906290482 880623

DR

ADOCK 0500

5

--

-

- -

-

-

--

-

-

- -

-

- - - - - - - -

,

__

,

.

.

.

_ . .

_

_

. . _ . _ . . _ . _ ..

!

,

. , ' ' .

's'

Omaha Public Power District

-2-

J

j

Should you have any questions concerning this inspection, we will Je pleased to

'

discuss them with you.

,

Sincerely.

Original Signed By

A. B. Beach'

'

L. J. Callan, Director

<

Division of Reactor Projects

Enclosures:

l

1-

Appendix A - Notice of Violation

.

,

i

2.

Appendix B - NRC Inspection Report

'

50-285/B8-12 w/ attachment

i

cc w/ enclosures:

Fort Calhoun Station

ATTN:

W. G. Gates, Manager

P.O. Box 399

l

Fort Calhoun, Nebraska 68023

Harry H. Voigt, Esq.

LeBoeuf, Lamb, Leiby & MacRae

i

1333 New Hampshire Avenue, NW

l

Washington, D. C.

20036

4

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director

1

bectoDMB(IE01)

bec distrib. by RIV:

.

-

R.D. Martin, RA

  • RPSB-DRSS
  • SectionChief(DRP/B)
  • MIS System
  • RIV File
  • DRP

.,

  • RSTS Operator
  • Project Engineer. DRP/B

+

Lisa Shea, RM/ALF

  • T. Bournia, NRR Project Manager
  • DRS

H. Scott, Acting EO

!

  • TSE
  • RRI
  • J. E. Gagliardo
  • G. A. Pick
  • w/766

1

i

!

a

}

> .

- .

-

- .

-

-

-

.

. - --

.

.