ML20195J907
| ML20195J907 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 11/30/1988 |
| From: | Bailey J GEORGIA POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML20195J911 | List: |
| References | |
| GN-1515, NUDOCS 8812050091 | |
| Download: ML20195J907 (1) | |
Text
,
' Georgia N*et Cepaay Wst Off<e Boa 282 I
Mynestoc Georg a 30830
'[
w w.404ss49 w 404 124 8114 SwtNin Company Serv <es. Inc msto m. so,ze2s l
Omvam. Alabama 35M2 I
w-ms.'*"
Vogtle Project November 30, 1988 i
i t,
l-ATTN:
Document Control Desk File:
X7BC35 i
United States Nuclear Regulatory Commission Washington, D. C.
20555 Log:
GN-1515 PLANT V0GTLE - UNIT 2 q
NRC DOCKET NUMBER 50-425 CONSTRUCTION PERMIT NUMBER CPPR-109 PRESERVICE INSPECTION PROGRAM REV. 4 4
Gentlemen:
I 4
i Enclosed for your review are ten copies of the VEGP-2 PSI Program ISI-P-010 Revision 4.
This revision incorporates editorial changes n
}
to Relief Requests 9, 17, 26 and 30.
Relief Requests 24, 31, and l
35 have been corrected due to comments received from an NDE Level III l'
review during the preparation of the Final Report.
The Final Report preparatior also disclosed that some welds requiring relief were not listed in the Tables of Relief Requests 29, 34, 36, and 37.
Relief Request 42 has been revised to reflect the visual examination i
that was performed as an alternate method.
Relief Request 46, which j
has been added, was inadvertently omitted in our submittal of i
Revision 3.
If your staff should require additional information, please do not hesitate to contact me.
l Sincerely, 4
i
,,4. 84
^
{
J d
J. A. Baile/
i Project Licensing Manager f
j c
JAB /wk1 f
M Enclosure 1
xc: NRC Regional Administrator
~g NRC Resident Intpector l
l
$b P. D. Rice I
i
-g J. P. Kane 4
- O R. A. Thomas l
1 8S B. W. Churchill, Esquire 8"
J. E. Joiner, Esquire
[;
}
j J. B. Hopkins (2) l(g j
oo G. Bockhold, Jr.
N<
t R. J. Goddard, Esquire R. W. McManus Vogtle Project File i