_ _.
(
s 1
p choq
+1 jo UNITED STATES g
8 NUCLEAR REGULATORY COMMISSION o
j rasm NGTON, D. C. 20666 1
'4.....j L
December 2, 1988 Docket Nos.: 50-321 50-366 Mr. W. G. Hairston, III Senior Vice President -
Nuclear Operations Georgia Power Company P.O. Box 1295 l
Birmingham, Alabama 35201
Dear Mr. Hairston:
SUBJECT:
RESPONSE TO NRC BULLETIN 88-04 (TACS 69923 and 69924)
On May 5, 1988, the NRC staff issued NRC Bulletin 88-04, "Potential i
Safety-Related Pump Loss." The bulletin requested the evaluation of all safety-related pumps for 1) pump-to-pump interaction during miniflow operation I
that could result in dead-heading of one or more of the pumps and 2) the adequacy of the minimum flow bypass lines with respect to damage resulting from operation and testing in the minimum flow mode. The b0lletin also requested that within 60 days of receipt of the bulletin, licensees provide a i
written response that (a) sumarizes the problems and the systems effected, (b) identifies the short-term and long-term rodifications to plant operating l
l procedures or hardware that have been or are being implemented to ensure safe plant operations, (c) identifies an appropriate schedule for long-term resolution of this and/or other significant problems that are identified as a t
result of this bulletin, and (d) provides justification for continued l
operation particularly with regard to General Design Criterion 35 of Appendix A i-to Title 10 of the Code of Federal Regulations (10 CFR Part 50), "Emergency Core Cooling" and 10 CFR 50.46, "Acceptance Criteria for Emergency Core l
Cooling Systems for Light Water Nuclear Power Reactors." Additionally, the j
staff reqvested that within 30 days of completion of the long-term resolution actions, that licensees provide a Written response describing the actions taken.
l By letter dated July 11, 1988, you responded to Bulletin 88-04. Your response 1
provided the information requested in a, b, c, and d above.
Based upon your j
]
evaluation, you have concluded that pump dead-heading and/or inadequate minimum flows to preclude pump damage as discussed in the bulletin are not I
problems at the Hatch plant. Accordingly, there are no long-term actions remaining to be resolved. Your response fulfills the requirement for 2
responding to Bulletin 88-04.
t t
I f
l p= 888u suggs,,
N PDC
i
~
t tir. W. G. Hairston, III December 2, 1988 As discussed in Bulletin 88-04, you should document and maintain for at least two years an evaluation of your actions in responding to the bulletin. These records may be subject to future auditing.
Sincerely, i.
1.awrence P. Crocker, Project Manager Project Directorate 11-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc:
See next page 9
]
^
December 2, 1988 Mr. W. G. Hairston, III }
]
As discussed in Bulletin 88-04, you should document and maintain for at least f
i two years an evaluation of your actions in responding to the bulletin.
These l
records may be subject to future auditing.
)
Sincerely, t
I Lawrence P. Crocker, Project Manager Project Directorate 11-3 l
Division of Reactor Projects - 1/II i
2 Office of Nuclear Reactor Regulation 1
i j
cc:
See next page
(
l l
I i
DISTRIBUTION:
I poctet F11e.,a i
NRC PDR
}
Local PDR I
PDil-3 Reading i
S. Varga 14-E-4 l
j G. Lainas 14-H-3 t
D. flatthews 14-H-25 3
i M. Rood 14-H-25
}
l L. Crocker 14-H-25 t
OGC(Forinform.Only) 15-B-18 i
t l
E. Jordan filiBB-3302 i
j B. Grtires 9-A-2
{
1 T. Alexion 13-E-21 8-E-23 i
M. McCoy) i ACRS (10 P-315 l
Hatch Plant Fil 7,
l P
3 PD j
d LCrocker:Is DMatthews j
{
11/.2888 11/A4/88 li/$,/88
[
L i
l l
1 f
l i
F l
l
r-1 ir. W. G. Hairston, III Edwin I. Hatch Nuclear Plant, Georgia Power company Units ;ios.1 and 2 cc:
G. F. Trowbridge, Esq.
Mr. R. P. Mcdonald Shcw, Pittman, Potts and Trowbridge Executive Vice President -
2300 N Street, N. W.
Nuclear Operations Washington, D.C.
20037 Georgia Power Company P.O. Box 1295 Mr. L. T. Gucwa Birmingham, Alabama 35201 Engineering Department Georgia Power Cumpany P. O. Box 1295 Birmingham, Alabama 35201 Nuclear Safety and Compliance Manager Edwin 1. Hatch Nuclear Plant Georgia Power Company P. O. Box 442 Baxley, Georgia 31513 Mr. Louis B. Long Southern Company Services, Inc.
P. O. Box 1295 Birmingham, Alabama 35201 Resident inspector U.S. Nuclear Regulatory Comission Rcute 1, Box 725 Baxley, Georgia 31513 Regional Administrator, Region !!
U.S. Nuclear Regulatory Comission 101 Marietta Street, Suite 2900 Atlanta, Georgia 30323 Mr. Charles H. Badger Office of Planning and Budget Room 610 270 Washington Street, S.W.
Atlanta, Georgia 30334 Mr. J. Leonard Ledbetter, Comissioner Department of Natural Resources 270 Washington Street, N.W.
Atlanta, Georgia 30334 Chairman Appling County Comissioners County Courthouse Baxley, Georgia 31513 i
.