ML20195J649
| ML20195J649 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 06/17/1988 |
| From: | Mccoy F NRC OFFICE OF SPECIAL PROJECTS |
| To: | White S TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML20195J655 | List: |
| References | |
| NUDOCS 8806290181 | |
| Download: ML20195J649 (2) | |
See also: IR 05000327/1988026
Text
I
s
'
'.o
pW
-
y)H il M
v
,
.
Bocket Nos.:
50-327 and 50-328
License Nos.:
Tennecee Valley Authority
L/TTN:
Mr.
S.
A.
White
Manager of Nuclear Power
6N 38A Lookout Place
1101 Market Square
Chattanooga, TN
37402-2801
Gentlemen:
SUBJECT:
(NRC INSPECTION REPORT NOS. 50-327/88-26 AND 50-328/88-26)
This refers to the special Nuclear Regulatory Commission (NRC) shift
coverage inspection conducted by the NRC's Sequoyah Restart Task Force
on April 3,
1988 thru May 4,
1988.
The inspection included a review of
the activities associated with the heatup of Sequoyah Unit 2.
At the
conclusion of the inspection, the findings were discussed with those
members of your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
These areas included extended control room observation and operational
safety verifation.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records,
interviews with personnel, and observation of activities in progress.
The inspection findings indicate that certain activities appeared to
,
violate NRC requirements.
Accordingly, the violation, references to
l
pertinent requirements, and elements to be included in your response are
I
described in the enclosed Notice of Violation.
In light of similar
violations previously cited in Inspection Reports 327,328/87-30, 87-66,
and 88-06, the NRC still has concern regarding the overall adequacy of
configuration control at Sequoyah.
Please consider this previous
enforcement history in your root cause evaluation of the violation
herein.
Two unresolved items were identified during the inspection.
An
unresolved item concerning delays in entering and reporting LCO entry on
l
'
RCS leakrate and concerns with initiation of Abnormal U arating
ga Instructions is addressed in paragraph 10 of the enclos;
report.
A
Smo second unresolved item was identified concerning the det 11 tion of
$8C control room areas to which operators are restricted while at the
oo
controls.
This item is further documented in paragraph 3 of the
$$
enclosed report.
With regard to this second unresolved item, it is
yy
requested that you provide a response, within 30 days of the date of
mo
this letter, that addresses the results of'your review of this situation
o$
and any corrective actions considered appropriate to achieve resolution.
'
$"
4
Zn accordance with Section 2.790 of the NRC's "Rules of Practice," Part
h$
2 Title 10, Code of Federal Regulations, a copy of this letter, its
10
enclosures, and any reply will be placed in the NRC's Public Document
(-
Room.
- - - - - _ _ _ . - - - _ _ - _ _ . _ _ _ _ _ - - - _ - - _ _ . - - _ _ _ _ - . _ _ _ - - - - - _ _ - _ _
. . - -
-
.
.. . _ .
-
.
- .
. - .
..
_
.
'
UW1171999
'
'
'"
2
.
,
The-responses directed by this letter and its enclosures are not sub-
jected to the. clearance procedures of the Office of Management and
Budget as required by the Paperwork-Reduction Act of 1980, PL 96-511.
i:
,
Should you have any. questions co'ncerning this letter, please contact us.
Sincerely,
/
f
Frank R. McCoy
Sequoyah Startup Manager
Office of Special Projects
Enclosures:
1.
2.
NRC Inspection Report
cp w/encls:
W.L. Abercrombie, Site Director
j
Sequoyah Nuclear Plant
bk( A.
Kirkebo, Director,
Nuclear Engineering
v(. L.
Gridley, Director
Nuclear Safety and Licensing
LMI R . Harding, Site Licensing
i
fanager
,
MA Representative, Bethesda Office
i
b
w/encls:
D.
Ebneter, OSP
G.
Partlow, OSP
D. Richardson, OSP
LOT G.
Zech, OSP
C.
Black, OSP
0 .
D.
Liaw, OSP
<
K.
P.
Barr, OSP
F.
R.
McCoy, OSP
J ., B . Brady, OSP
V. R u t b e r g , OGC
VNRC Resident Inspector
DRS Technical Assistant
NRC Document Control Desk
State of Tennessee
PENGR
R
GRL
6//6/97
4 /7
,
1
. - -
. - - - -
- - . -
- - .
.
- -
- - . -
- - -
-
- -
- - - - - - - - -
- - -
- -
- - - - - -
- -