November 20, 1998-
Mr;Lew W. Myers
Vice President - Nuclear
Centerior Service Company -
P.O. Box 97, A200
Perry, OH 44081
>
SUBJECT:
NRC ROUTINE CHEMISTRY AND RADIATION PROTECTION INSPECTION
l
REPORT 50-440/98022(DRS)
'
Dear Mr. Myers:
On November 6,1998, the NRC completed an inspection at your Perry Nuclear Power Plant.
,
The enclosed report presents the results of this inspection. No violations of NRC requirements
{
were identified.
l
- The inspection was an examination of activities conducted under your license as they relate to
)
radiation safety and to compliance with the Commission's rules and regulations and with the
conditions of your license. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with personnel, and
observation of activities in progress.- Specifically, the inspection focused on the implementation
of the chemistry and meteorology programs and on personnel radiation dose control. During
this inspection, a previous inspection item, conceming the evaluation of radionuclide scaling
factors, was also reviewed.
We recognized the positive results o' f your personnel dose control program and your low
- personnel dose for 1998. In addition, your staff continued to be effective in minimizing the
- levels of corrosive impurities in the reactor coolant system and in monitoring reactor water
quality and fuel performance. The chemistry staff implemented sound laboratory quality control
practices, and chemistry technicians demonstrated effective analytical techniques. As a result
of chemistry assessment findings, your chemistry staff developed initiatives to improve the self
assessment program and to improve certain aspects of the chemistry program.
In accordance with 10 CFR 2.790 of the Commissions regulations, a copy of this letter and its
//
enclosure will be placed in the NRC Public Document Room.
//
i
9811250038 981120
DR
ADOCK 05000440
g
1
w -
n
e a
.Nm.<
,-e-
1
e
.
L. Myers
-2-
We will gladly discuss any questions you have concerning this inspection.
l
Sincerely,
Original Signed by Gary L. Shear
Gary L. Shear, Chief
Plant Support Branch 2
1
Docket No.:
50-440
j
License No.: NPF-58
Enclosure:
_ inspection Report 50-440/98022(DRS)
cc w/ encl:
H. Hegrat, Manager, Regulatory Affairs
T. Rausch, Director, Quality and
Personnel Development
R. Schrauder, Director, Nuclear
Engineering Department .
W. Kanda, General Manager
Nuclear Power Plant Department
N. Bonner, Director, Nuclear
Maintenance Department
H. Bergendahl, Director
Nuclear Services Department
Ohio State Liaison Officer
R._ Owen, Ohio Department of Health
C. Glazer, State of Ohio Public
Utilities Commission
- DOCUMENT NAME: G:\\DRS\\PER98022.WPD
To receive a copy of tNa document, Indicate in the box
"C" = Copy wdbout attachmerW/ enclosure "E" e Copy wth attachment / enclosure "N" * No copy
OFFICE
Rlli
lE
Rlil
6 Rlli
lG
NAME
Orth:]p .5"
Shear 645
Kozak b A
DATE
11/z/98
11/X/98
11/td98
OFFICIAL RECORD COPY
..
-
..
. .
-
. -.-
. . .
.
. . -
. . . - - -
-.. .~
'I
'
',
j
4
- L. Myers
-3-
Distribution:
RPC (E-Mail).~
' Project Mgr.', NRR w/enci
JiCaldwell, Rlli w/enci
C. Pederson, Rlli w/enci
B. Clayton, Rlll w/ encl
SRI Perry w/ encl
DRP w/enct
TSS w/enci
-h
,
DRS (2) w/enci
RlliPRR
nel
PUBLIC i
1w/ench
'
"
Docket Fi w/ enc!"
GREENS
IEO (E-Mail)
DOCDESK (E-Mail) -
1
l
!~
,
250001
?
l
l
1