Advises That Commonwealth of Ma Has Determined That Exposure Plume Pathway Should Be Reconfigured.Epz Will Include Entirety of Carver & Marshfield.Portions of Other Towns, within 10-mile Radius,Will Also Be Included
ML20195J475
Person / Time
Site: Pilgrim
Issue date: 07/24/1987
From: Boulay R
MASSACHUSETTS, COMMONWEALTH OF
To: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19313A855 List:
References
NUDOCS 8801280269
Download: ML20195J475 (2)


Text

s s

t

.n THE COMMONWEALTH OF MASSACHUSETTS

  1. %',#c M'

EXECUTIVE DEPAkTJENT 3

Civil DEFEkst AGChCY AND oFF<t or tutmGthCY PatPAAtQht$$

(.

400 WeActSitR ACAo O

P o. sou tm r

rmAwiwowAu,uAss cirot433r ROJERT J. BOULAY MICH AEL S. DUKAKIS datCton covemnoa July 24, 1987

'Mr. William T. Rassell, Administrator U.S. Nuclear' Regulatory Commission, Region I 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. Thomas:

This is to advise you that in accordance with Massachusetts law, St. 1979, c. 796, codified as Massachusetta General Laws c. 33 Appendix, section 13-2b, and federal regulations, 10 CFR 50.47 and 44 CFR 350.7, the Commonwealth of Massachusetts has determined that the plume exposure pathway for the Pilgrim Nuclear Power Station emcrgency planning zone should be reconfigured.

The recor. figured EPZ will include the entiroty of the towns of Carver and Marshfield, both of which presently have only a partion of their Jurisdiction within the EPZ.

Accordingly, based upon our anolysis of 1ccal conditions and geographical boundaries, the history of off-site emergency and our consideration of the viuws planning at Pilgrim Station, of state, local, utility, and federal officials, we request acknowledge this determination.

that you On July 14, 1987, we held enaultation meeting in accordance with 44 CFR 350.7 and 50.47 which was attended by represente*..ves of thi, agency, the Executive Office of Public Safety, the U.S.

Nuclear Regulatory Commission, and the Boston Edison Company.

As discussed at the July 14 meeting, it la also our portion of other towns which have a intention to designate territory within ten miles of Pilgrim' their geographical s

d' 8801280269 880106

^

PDR ADOCK 05000293 F

POR

1 rh e'

1 part of the EP2.

This designation will take placo Station as the concerned j

after we have completed consultation with each of j

j

\\

communities.

Thank you for your cooperction with this very important matter.,

Sine ly, N

a obert J.

Bou Director l

Assistant Secretary Peter W.

Agnes, Jr.

cc:

i Deputy Director John L.

Lovering MDPH Assistant Commissioner Gerald Parker, Mr. Ralph Bird, Boston Edison Company j

Area II Director Rodger Mr. Al Slaney, MCDA Area II Chief Executives of Carver and Marshfield Civil Defense Directors of Carver and Marshfield 4