OPERATING DATA REPORT DOCKET NO.86-354 UNIT Hope _ Creek DATE 6/15/88
//Mh COMPLETED BY' H.
Jensen TELEPHONE (609) 339-5261 OPERATING STATUS 1.
REPORTING PERIOD March 1988 GROSS HOURS IN REPORTING PERIOD 744 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt) 3293 MAX. DEPEND. CAPACITY (MWe-Net) 1067(1)
DESIGN ELECTRICAL RATING (MWe-Net) 1067(1) 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net)
None 4.
REASONS FOR RESTRICTION (IF ANY)
THIS YR TO MONTH DATE CUMULATIVE 5.
NO. OF HOURS REACTOR WAS CRITICAL 0
1045.0 8903.1 6.
REACTOR RESERVE SHUTDOWN HOURS 0
0 0
7.
HOURS GENERATOR ON LINE O
1037.9 8783.0 8.
UNIT RESERVE SHUTDOWN HOURS 0
0 0
9.
GROSS THERNAL ENERGY GENERATED (MWH) 0 3,378,284 27,186.852 10.
GROSS ELECTRICAL EHERGY GENERATED (MWH) 0 1,133,985 9,045,682 11.
NET ELECTRICAL ENERGY GENERATED (MWH) (2) 0 1,076,685 8,641,723 12.
REACTOR SERVICE FACTOR N/A 47.8 79.3 13.
REACTOR AVAILABILITY FACTOR N/A 47.8 79.3 14.
UNIT SERVICE FACTOR N/A 47.5 78.2 15.
UNIT AVAILABILITY FACTOR N/A 47.8 79.3 16.
UNIT CAPACITY FACTOR (Using Design MDC) 0.0 46.2 72.1 17.
UNIT CAPACITY FACTOR (Usina Design MWe) 0.0 46.4 72.0 18.
UNIT FORCED OUTAGE RATE O
O O
19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION):
None 20.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIHATED DATE OF STARTUP:
4/15/88 (1) August 1987 data is under management review.
(2) Corrected values - 6/2/88 8806280315 880615 PDR ADOCK 05000354 PDR