Forwards Monthly Operating Repts for Oct 1998 for SONGS, Units 2 & 3,per TS 5.7.1.4.No Challenges to Pressurizer Safety Valves Occurred for Either Unit
ML20195H230
Person / Time
Site: San Onofre  
Issue date: 11/16/1998
From: Scherer A
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20195H235 List:
References
NUDOCS 9811230289
Download: ML20195H230 (1)


Text

.

le%

sourutRN cAllIORNIA

@I A. Edward Scherer EDISON

=hm An LDISON 1NTLRV4TlONAL* Company November 16,1998 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Docket Nos. 50-361 and 50-362 Monthly Operating Reports for October 1998 San Onofre Nuclear Generating Station, Units 2 and 3 Gentlemen:

Technical Specification 5.7.1.4 of Facility Operating Licenses NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3, respectively, requires Southern California Edison to provide a Monthly Operating Report (MOR) of operating statistics and shutdown experience, including documentation of all challenges to pressurizer safety valves, for each unit. Enclosures 1 and 2 provide the October 1998 l

Monthly Operating Reports for Units 2 and 3, respectively. There were no challenges to pressurizer safety valves for either Unit 2 or 3.

If you have any questions, please contact Mr. Clay E. Williams at (949) 368-6707.

Sincerely, k2t 9811230289 981116'"

i PDR ADOCK 05000361 R

PDRj Enclosuresc : " '

cc:

E. W. Merschoff, Regional Administrator, NRC Region IV J. W. Clifford, NRC Project Manager, San Onofre Units 2 & 3 J. A. Sloan, NRC Senior Resident inspector, San Onofre Units 2 & 3 l

P. O. Box 128 l

San Clemente. CA 92674-0128 l

949-368-7501

[

Fax 449-36&.7575