ML20195H230
| ML20195H230 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 11/16/1998 |
| From: | Scherer A SOUTHERN CALIFORNIA EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20195H235 | List: |
| References | |
| NUDOCS 9811230289 | |
| Download: ML20195H230 (1) | |
Text
.
le%
sourutRN cAllIORNIA
@I A. Edward Scherer EDISON
=hm An LDISON 1NTLRV4TlONAL* Company November 16,1998 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
Subject:
Docket Nos. 50-361 and 50-362 Monthly Operating Reports for October 1998 San Onofre Nuclear Generating Station, Units 2 and 3 Gentlemen:
Technical Specification 5.7.1.4 of Facility Operating Licenses NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3, respectively, requires Southern California Edison to provide a Monthly Operating Report (MOR) of operating statistics and shutdown experience, including documentation of all challenges to pressurizer safety valves, for each unit. Enclosures 1 and 2 provide the October 1998 l
Monthly Operating Reports for Units 2 and 3, respectively. There were no challenges to pressurizer safety valves for either Unit 2 or 3.
If you have any questions, please contact Mr. Clay E. Williams at (949) 368-6707.
Sincerely, k2t 9811230289 981116'"
i PDR ADOCK 05000361 R
PDRj Enclosuresc : " '
cc:
E. W. Merschoff, Regional Administrator, NRC Region IV J. W. Clifford, NRC Project Manager, San Onofre Units 2 & 3 J. A. Sloan, NRC Senior Resident inspector, San Onofre Units 2 & 3 l
P. O. Box 128 l
San Clemente. CA 92674-0128 l
949-368-7501
[
Fax 449-36&.7575