_.. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
6 In Reply. Refer To:
g lg g Docket:
50-458 Gulf States Utilities ATTN: Mr. James C. Deddens Senior Vice President (RBNG)
P.O. Box 220 St. Francisville, Louisiana 70775 Gentlemen:
This letter is to acknowledge the receipt and review of changes to your emergency plan that were sent to this office by letter dated October 14, 1988.
The revisions to your plan were reviewed by our emergency preparedness staff and the proposed changes to the emergency plan appear to be acceptable.
If you have any further questions or comments, please contact Mr. Nemen Tere at (817) 8C0-8129.
i I
Sincerely, Orighul Signed 11y L J. Callan L. J. Callan, Director Division of Reactor Projects cc:
Gulf States Utilities ATTN:
J. E. Booker, Manager-l River Bend Oversight P.O. Box 2951 Beaumont, Texas 77704 Gulf States Utilities 6
ATIN:
Les England, Director Nuclear Licensing - RBNG j
P.O. Box 220 St. Francisville, Louisiana 70775 i
Chief Technological Hazards Branch FEMA Region 6 Federal Center 800 North Loop 288 t
Denton, Texas 76201-3698 t
Louisiana State University, Government Doruments Department l
Louisiana R4diation Co Irel Program Director
(
)
AI 88-360 F
RIV:SEpS:
E-C:SEPS:
C:RPB C:
D: b tM 4
i Terc/ sir REverett BMurray C
ble Callan 9 I
g / /88 y
/88 Q / /88 V/1v/88 g/lf/89 f
'f7 t
881130 881118 PDR A
05000458 F
PNV
r o
Gulf States Utilities
-2 bec to DMB (A045) bec distrib. by RIV:
DRP RRI R. D. Martin, RA Section Chief (DRP/C)
Lisa Shea, RM/ALF MIS System RPB-DRSS RSTS Operator Project Engineer, DRP/C RIV File W. Paulson, NRR Project Manager (MS:
13-0-18)
DRS R. Bangart R. Hall B. Murray J. Everett N. Terc G. Bates 1