r-00T 081987 Occket No. 50-293 Boston Edison Company ATTN: Ralph G. Bird Senior Vice President - Nuclear 800 Boylston Street Boston, Massachusetts 02199
Dear Mr. Bird:
This letter confirms the September 30, 1987 conversation between Mr. Samuel Collins of my staff and you regarding overtime controls at ' the Pilgrim Nuclear Power Station.
During that conversation, you indicated that you had received a letter alleging excessive overtime and that you were also aware of similar allegations in the press. Further, you agreed to evaluate the
. situation to determine whether overtime controls at the site are being effec-tively implemented for all personnel including: (1) whether instances of over-time in excess of NRC guidelines are being reviewed and approved as required; and, (2) whether the amount of overtime actually approved and the attendant circumstances is consistent with the intent of NRC guidance on controlling working hours. You indicated that you would provide a written report to NRC Region I.
We request this report be provided withir. 20 days of the date of this letter.
l The above described evaluation will be of assistance to NRC Region I in i
reviewing this matter.
If your understanding of this agreement differs from
-that described herein, please contact this office promptly.
Thank you for your cooperation in this matter.
Sincerely, William F. Kane, Director Division of Reactor Projects
/
[h
/
f#4ll0 0FFICIAL RECORD COPY BLOUGH 1610/7/87 - 0001.0.0 agg,gilidpf 10/07/87 i
r i
l\\
s a
Boston Edison Company 2
00T 08W cc:
l K. P. Roberts, Nuclear Operations Manager
' Paul Levy, Chairman, Department of Pubite Utilities Chairman, Board of Selectmen Plymouth Civil Defense Director J. D. Keyes, Boston Edison Regulatory Affairs and Programs E. D. Robinson, Nuclear Information Manager R. N. Swanson, Nuclear Engineering Department Manager The Honorable E. J. Markey Senator Edward P. Kirby The Honorable Peter V. Forman Sharon Pollard, Secretary of Energy Resources Peter W. Agnes, Assistant Secretary of Public Safety, Commonwealth of Massachusetts Rachel Shimshak, MASSPIRG Public Document Room (POR) local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector CommonwealthofMassachusetts(2) bec:
Region I Docket Room (with concurrences)
Section Chief, DRP
'R. Wessman, PM, NRR R. J. Bores, DRSS A. Shropshire, AC L. Doerflein, ORP Y
.)
-f RI:DRP RI:DRP IIAl:DRP
/ I RP to 1 n/
4 Doerflein/mjd Blough "Wiggins s
10/)/87 10/)/87 10/7/87 10/?/87 10/7/87 0FFICIAL RECORD COPY BLOUGH 16 10/7/87 - 0002.0.0 10/07/87 l
l L.