ML20195G405
| ML20195G405 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 06/17/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Campbell G ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML20195G409 | List: |
| References | |
| NUDOCS 8806270340 | |
| Download: ML20195G405 (2) | |
See also: IR 05000313/1988019
Text
,-
_
. _ .
'
'
y .,
' "^
JUN l 71988
"
.
,
In Reply Refer To:
Dockets:
50-313/88-19
50-368/88-19
,
Arkansas Power & Light Company
ATTN:
Mr. Gane Campbell
Vice President, Nuclear
Operations
.P.O. Box 551
Little Rock, Arkansas 72203
s
Gentlemen:
This refers to the inspection conducted by M. E. Murphy of this office during
the period May 16-20, 1988, of activities authorized by NRC Operating
Licenses DPR-51'and NPF-6 for Arkansas Nuclear One, Units 1 and 2, and to the
discussion of our findings with Mr. L. W. Humphrey and a+.ner members of your
staff at the conclusion of the inspection.
Areas examined.during the inspection included implercentation and compliance to
your fire protection / prevention program, review of actions taken on previous
.'
inspection findings and a review of your actions to commitments made in two
LERs. Within these areas, the inspection consisted of selective examination of
procedures and representative records, interviews with personnel, and
observations by the NRC inspector.
The inspection findings are documented in
the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Udyinu, ;,,.a
A. D. Beach
L. J. Callan, Director
DivisionofReactorProjects
Enclosure:
(see next page)
")
Me
gW
l
D;(
f
8Ie$
- I
C:PS/A
0:
Reconcur
.S
land
JL ilhoan
DDCharnberlain LJ allan
REIreland
rpby:gb
q
(p/f/88
b/}/88
(9f/88
i/f5/88
G A1/88
(p ll7/88
/
8806270340 880617
t I
ADOCK 05000313
G
.: {,
i
_~
,
Arkansas Power & Light Company
-2-
Enclosure:
Appendix - NRC Inspection Report
50-313/88-19
50-368/88-19
cc w/ enclosure:
Arkansas Nuclear One
ATTN:
J. M. Levine, Director
Site Nuclear Operations
P.O. Box 608
Russellville, Arkansas 72801
Arkansas Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
- RRI
R. D. Martin, RA
- RPSB-DRSS
- SectionChief(ORP/A)
Lisa Shea, RM/ALF
- RIV File
- DRP
- MIS System
- RSTS Operator
- ProjectEngineer,DRP/A
- C. Harbuck, NRR Project Manager
- DRS
G. F. Sanborn, E0
- w/766
,
-
.