ML20195E792
| ML20195E792 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 05/30/1986 |
| From: | Agosti F DETROIT EDISON CO. |
| To: | Lynch M NRC |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737, TASK-***, TASK-TM VP-86-0061, VP-86-61, NUDOCS 8606090228 | |
| Download: ML20195E792 (5) | |
Text
"
i
.a iCQ Pr d nt
% clear Operations C
Detroit re-2 6400 N Edison r=ortnDemieHighway Nuclear i
o--
my 30, 1,e VP-86-0061 Mr. M. D. Lynch Licensing Project Manager U. S. Nuclear Regulatory Commission Washington, D.C.
20555 uear Mr. Lynch:
Reference:
1)
Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43 2)
NRC Letter dated May 12, 1986 from M. D. Lynch to F.
E. Agosti
Subject:
Response to Request for Information Regarding the Tracking of Multi-Plant Actions Attached please find our response to your request for updated multi-plant actions pertaining to Fermi 2.
In an effort to respond promptly to your request the schedules for items requiring additional work were estimated and may be subject to change.
The attached information includes'UUREG-0737 issues,.
License Conditions, Generic Letters' issued' subsequent to March 20, 1985 and updated information on MPA number A-20.
Additional information1concerning MPA numbers D-01 and D-20 will be_ transmitted at a future date.
If you have any questions in this matter, please contact Mr. R. L. Woolley at (313) 586-4211.
Sincerely, n,
' p(, f, '
.~
cc:
Mr. W. G. Rogers USNRC Document Control Desk Uashington, D.C.
20555 8606090228 860530$
PDR ADOCK 05000341 P
- PnR,
\\
S
i
.=
Attachment VP-86-0061 COMPLETION / SCHEDULE TITLE ITEM STATUS DATE NUREG-0737 I.A.l.1 COMPLETE 03-84 NUREG-0737' I.A.l.2 COMPLETE 04-84 NUREG-0737 I.A.l.3 COMPLETE 03-84 NUREG-0737 I.A.2.1 COMPLETE 03-84 NUREG-0737 I.A.2.3 COMPLETE 03-84 NUREG-0737 I.A.3.1 COMPLETE 07-81 NUREG-0737 I.B.l.2 COMPLETE 01-83 NUREG-0737 I.C.1 COMPLETE 03-84 NUREG-0737 I.C.2 COMPLETE 03-85 NUREG-0737 I.C.3 COMPLETE 03-85 l
NUREG-0737 I.C.4 COMPLETE 03-85 NUREG-0737 I.C.5 COMPLETE 10-84 NUREG-0737 I.C.6 COMPLETE 03-84 NUREG-0737 I.C.7 COMPLETE 06-84 NUREG-0737 I.C.8 COMPLETE 01-85 NUREG-0737 I.D.1 OPEN 11-86 i
NUREG-0737 I.G.1 COMPLETE 09-84 NUREG-0737 II.B.1 COMPLETE 01-83 NUREG-0737 II.B.2 COMPLETE 07-84 NUREG-0737 II.B.3 COMPLETE 03-84 UUREG-0737 II.B.4 COMPLETE 10-84 UUREG-0737 II.B.7 COMPLETE 03-85 NUREG-0737 II.B.8 COMPLETE 03-85 NUREG-0737 II.D.1 COMPLETE 03-85 NUREG-0737 II.D.3 COMPLETE 10-84 NUREG-0737 II.E.4.1 COMPLETE 01-83 NUREG-0737 II.E.4.2 COMPLETE 10-84 NUREG-0737 II.F.1
' COMPLETE 12-84 NUREG-0737 II.F.2 COMPLETE 09-84 NUREG-0737 II.K.l.5 COMPLETE 10-84 NUREG-0737 II.K.l.10 COMPLETE 10-84 NUREG-0737 II.K.l.22 COMPLETE 06-84 NUPEG-0737 II.K.l.23 COMPLETE 01-83 1
NUREG-0737 II.K.3.3
- COMPLETE 01-83 i
NUPEG-0737 II.K.3.13 COMPLETE 84 NUREG-0737 II.K.3.15 COMPLETE 06-84 NUREG-0737 II.K.3.16 COMPLETE 08-84 MUREG-0737 II.K.3.17 COMPLETE 03-84 NUREG-0737 II.K.3.18 OPEN.
1988 NUREG-0737 II.K.3.21 COMPLETE 01-83 j
NUREG-0737 II.K.3.22
' COMPLETE 06-84 l
. II.K.3.24 COMPLETE 01-83 i
NUREG-0737 II.K.3.25 COMPLETE _
01-83 NUREG-0737 II.K.3.27 COMPLETE 05-84 NUREG-0737 II.K.3.28 COMPLETE 01-83 J
J r
,e y
e-
,.--n,-
---.w y+--
n -.-
Attachment VP-86-0061 NUREG-0737 II.K.3.30 COMPLETE 01-83 NUREG-0737 II.K.3.31 CO!!PLETE 03-85 NUREG-0737 II.K.3.44 COMPLETE 01-82 NUREG-0737 II.K.3.45 CO!!PLETE 01-03 UUREG-0737 II.K.3.46 COMPLETE 01-83 UUREG-0737 III.A.l.1 COMPLETE 07-84 NUREG-0737 III.A.1.2 COMPLETE 07-84 UUREG-0737 III.A.2 COMPLETE 03-84 NUREG-0737 III.D.l.1 COMPLETE 03-85 MUREG-0737 III.D.3.3 COMPLETE 11-84 UUREG-0737 III.D.3.4 COMPLETE 01-83 IIPPA A-20 OPEN 1990
Attachment VP-86-0061 COllPLETION/ SCI!EDULE TITLE STATUS DATE Suppression Pool Temperature Measurements OPEN 1988 Environmental Qualification of Electrical Equipment CLOSED 11-85 Safety / Relief Valve In-Plant Testing OPEN 1987 Control Room Habitability OPEN 1988 Study of Multiple Control System Failures OPEN 1988 Alternate Shutdown Panel Installation CLOSED 10-85 Emergency Diesel Generator Lube Oil Surveillance Program CLOSED ONGOING Low-Pressure Turbine-Disc Inspection OPEN 1990 Retention of Persons with EUR Operating E::perience On Shift CLOSED ONGOING Inservice Inspection Program CLOSED 09-85 Iodine / Particulate Sampling System OPEN 1988 Emergency Planning CLOSED 12-85 Generic Letter 83-28 ATHS OPEN 07-86 Detailed Control Room Design Review OPEN 11-86 Regulatory Guide 1.97, Revision 2 Compliance COI1PLETE 09-85 Upgrade Emergency Operation Procedures OPEN 1988-Safety Parameter Display System CLOSED 12-85 G
Attachment vp-86-0061 COMPLETION / SCHEDULE GENERIC LETTER STATUS DATE 85-06 OPEN 1988 85-02 COllPLETE N/A 85-08 cot!PLETE N/A 85-09 CO!!PLETE N/A 85-10 COMPLETE N/A 85-19 COMPLETE 12-85 85-17 COMPLETE N/A 85-14 COllPLETE N/A 85-15 C011PLETE N/A 35-22 COMPLETE N/A 86-07 COllPLETE N/A 86-03 COIIPLETE N/A 86-09 CO!!PLETE N/A 86-10 COf1PLETE N/A V