6-
c.f
- .
00T 31 1988
~
..
.
In Reply Refer To:
. Dockets:
50-498/88-61.
50-499/88-61
Houston. Lighting & Power Company
ATTN:
J. H. Goldberg, Group Vice
President, Nuclear
P.O. Box 1700
Houston, Texas 77001
Gentlemen:
This refers to the special team inspection conducted by Messrs. A. Singh and
C. E. Johnson of this office and Mr. T. Storey of Science Applications
International Corporation (SAIC), during the period October 3-7, 1988, of
activities authorized by NRC Operating License NPF-76 and Construction
Permit CPPR-129 for the South Texas Project Units 1 and 2, and to the
discussion of our findingt with members of your staff at the conclusion of the
inspection.
Areas examined during the inspection included establishment and implementation
of the fire protection program. Within these araas, the inspection consisted
of selective examination of procedures and rrresentative records, interviews
with personnel, and observations by the NRC inspectors. The inspection
findings are documented in the enclosed inspection report.
During this inspection, deficiencies were identified which involved inadeouate
technical review of the abnormal operating procedure for control room evacuation.
Similar deficiencies were found for the Unit 1 control room evacuation procedure
during the period March 30 through April 3,1987, as identified in NRC
Inspection Report 50-498/499/87-17.
During an inspection of the plant abnormal
operating procedures during the period of August 22-26, 1988, and as reported
in NRC Inspection Report 50-498/499/88-54 additional inadequacies with the
plant's abnormal operating procedures were identified.
These inadequacies were
cited as a violation.
As discussed during the exit interview of October 7, your
response to the violation identified in NRC Inspection Report 50-498/499/88-54
should also address the deficiencies with the control room evacuation procedure
discussed in this report since the deficiencies are considered to be another
example of the previously issued violation.
RIV:Rl*
RIV:Rl*
C:PSS*
0:DRS*
D:DR V
ASingh/tw
CEJohnson
TFStetka
JLMilhoan
LJCal'an
/ /88
/ /88
/ /88
/ /88
Io hs/88
- previously concurred
d
0811070303 881031
i
gDR
ADOCK 0
0
7
. _ _ _ _ - _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _
_,
- -
.
.
.
.
.
Houston Lighting & Power Company
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
@pnalSB"" N
111. C*U "
L. J. Callan, Director
Division of Reactor Projects
Enclosure:
Appendix - NRC Inspection Report
50-498/88-61
50-499/88-61
cc w/ enclosure:
Houston Lighting & Power Company
Central Power & Light Company
ATTN:
M. A. McBurnett, Manager
ATTN:
R. L. Range /R. P. Verret
Operations Support Licensing
P.O. Box 2121
P.O. Box 289
Corpus Christi
Texas 78403
Wadsworth. Texas 77483
Houston Lighting & Power Company
Newman & Holtzinger, P.C.
ATTN: Gerald E. Vaughn, Vice President
ATTN:
J. R. Newman, Esquire
Nuclear Operations
1615 L Street, N.W.
P.O. Box 289
Washington, D.C.
20036
Wadsworth, Texas 77483
Houston Lighting & Power Company
Houston Lighting & Power Company
ATTN:
J. T. Westermeier, General Manager
ATTN:
R. W. Chewning, Chairman
South Texas Project
Nuclear Safety Review Board
P.O. Box 289
P.O. Box 289
Wadsworth, Texas 77483
Wadsworth, Texas 77483
City nf Austin Electric Utility
Houston Lighting & Power Company
ATTN.
R. J. Miner, Chief Operating
ATTN: Licensing Representative
Officer
Suite 610
721 Barten Springs Road
Three Metro Center
Bethesda, Maryland 20814
City Public Service Board
Houston Lighting & Power Company
ATTN:
R. J. Costello/M. T. Hardt
ATTN:
S. L. Rosen
P.O. Box 1771
P.O. Box 289
San Antonio, Texas 78296
Wadsworth, Texas 77483
Texas Radiation Control Program Director
bec:
(seenextpage)
.
_
- - _ .
77 . -. .
'-
. .
>
,
.
.
.
,
.
,
te
'w
c-
. Houston Lighting 8. Power Company
-3-
'< -
.
,
0
. bec to DMB (IE01)
bec distrib, by RIV:
- DRP
- RRI-OPS
- SectionChief.(DRP/D).
- DRS
.
- MIS System
- RPB-DRSS
/
Lisa.Snea, RM/ALF
- RIY File-
1
R. Bachmann, OGC
.
. RSTS Operator
i
. Project Engineer, DRP/D
- G. Dick.. NRR Project Manager
- RRI-CONST
- T. F - Stetka
- *C. E. Johnson
- A. Singh
i
- w/766
,
, .
,
l
'
1
-
.
I
6
f
k
'
l
>
'
i
[
i
!
!
i
'
!
<
L
,,
f
'
[
1
!
I
i
.
I
i
i
'
,
.
. . . . . - . , , , . . _ _ - - - . - - - - _ - - , _ . - _ -
. - -
. .
.
- -
- ~ . . .
~ -
.
, . - _ _ . - - - - - -