Rev 5 to Procedure CP-QP-19.6, Surveillance of Const & Startup/Turnover Activities
ML20195D924
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/15/1984
From: Vega A
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20195D806 List:
References
FOIA-85-59 CP-QP-19.6, NUDOCS 8606050154
Download: ML20195D924 (3)


Text

_ _ _ _ _ _ _ _ _ - _

, .,..y_._., _ _ - . ...

PROCEDURE ISSUE MM RNSION CAM PAGE TEXAS UT!UTIES GENERAT1NG CO

. cesEs

,N :P-QP-19.6 5 MAY 15191M 1 of 3

. , f';

SURVEILLANCE OF PREPARED B

' ~

T PW

[ '

CONSTRUCTION AND STARTUP/ TURNOVER ACTIVITIES @

APPROVED BY: >. h Y f .m

1.0 REFERENCES

1-A B&R ASME QA Manual , n 1-B TUGC0 CPSES Quality W n M lbsii Gi!g l 1-C CPSES Section XI Progran Manual 1-D CP-QP-18.0, "Startup QA Plan"

, , . 1-E QI-QP-19.6-1, "CSTS Surveillance Deficiency Reports"

(

\ 1-F CP-QP-18.0, " Inspection Reports" 1-G CP-QP-17.0, " Corrective Action" 1-H CP-QP-2.6, " Certification of CSTS Personnel" 2.0 GENERAL 2.1 PURPOSE The purpose of this procedure is to outline the method used by Construction and Startup/ Turnover Surveillance (CSTS) personnel to perfonn surveillance of quality related activities to assure compliance to approved instructions, procedures, and/or drawings implementing the requirements of Reference 1-A,1-B,1-C, and 1-0.

2.2 RESPONSIBILITY The TUGC0 QA Manager has overall responsibility for control of quality related activities. The CSTS Supervisor, reporting to the QA Supervi sor is responsible for implementation of this procedure.

( -

U Tuococ4

. -. , .l,, . - .

8606050154 860530

PDR FOIA PDR GARDE 85-59

.h PROCEDURE REVISION ISSUE PAGE NUMBER DATE TEXAS UTluTIES GENERATING CO.

, CPSES CP-QP-19.6 5 MET 15 W 2 of 3 Y' ~ .

3.0 PROCEDIRE 3.1 METH00S Suneillance by CSTS shall be perfonned by assigned personnel using detailed checklists prepared from the implementing procedures and approved by the CSTS Supenisor or his designee.

Assigned surveillance. personnel shall verify compliance of the delineated activi ties through obsenation of work activities, discussions with cognizant personnel, and review

! of objective evidence. The results of the suneillance .

activities shall be documented on the checklist for subsequent review by the CSTS Supervisor or his designee.

3.2 REPORTING AND FULLOWUP A surveillance report is prepared which includes the following:

, a. Pu nose

(_ b. Scope .

c. Findings
d. Concerns Any discrepancir< noted during the surveillance activities shall be docu m ted on a Surveillance Deficiency Report in accoMance with Reference 1-E and attached to the Surveillance Report. The report is then forwarded to the

, appropriate CPSES department sanger for corrective action as necessary. A due date for the corrective action shall be provided based on the severity of the discrepancy.

NOTE: When surveillance activities involve the verification of the physical characteristics of an l item (s), and a permanent plant record is desired, the activity shall be docimented on an Inspection Report in accordance with Reference 1-F.

3.3 FREQUENCY The frequency of suneillance .activi ties shall be in accor-dance with~a s0Weillancie schedule prepared by the assigned ~~

staff personnel and approved by the CSTS Supervisor.

3.4 CORRECTIVE ACTION

( s ~,

The Quality Assurance Supervisor or his designee shall review Surveillance Deficiency Reports for the need for fonnal l

corrective action in accoMance with the provi sions of .,_

Reference 1-G.

. n== =

T O^ .

- _ _ _ _ _ , _ , , . _ _ . . , _ , m, _ , , , _ _ . , . _ _ _ . .m.. ~ g -

n= _ _ -__ . .. - . . . . . . . . - - -

PROCEDURE REVISION I83UI PAGE

. NUMBER

  • DATE TEXAS UTIUTIES GENERATING CO.

. , CPSES CP-QP-19.6 S MAY 15 584 3 of 3 I

3.5 FILES

^

Files of _ completed checklists and Surveillance Reports shall

~ ~ ~

be maintained by did.

O s

^-

f .

+me

'l l

l l

l l

r e

se h

e

.k

  • -+ _*~ ,, ,

_ . _ - . _ _ _ _ _ _ _ _ _ . . __ _ _