Forwards Scope & Objectives for Annual Emergency Preparedness Exercise Scheduled for 881018.Complete Exercise Scenario W/Controller Info & Simulation Data Will Be Submitted No Later than 45 Days Prior to Start of Exercise
ML20195D499
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 08/02/1988
From: Loflin L
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NLS-88-183, NUDOCS 8811070032
Download: ML20195D499 (5)


Text

CP&L Carchne Power & LigM Company AUG 0 2 888 SERIAL:

NLS 88-183 10CFR50.47 United States Nuclear Regulatory Commission ATT EN*$'10N : Docueent Control Desk Washington, DC 20555 BRUN5'JICK STEAM ELECTRIC PIANT, UNIT NOS.1 AND 2 DOCKET NOS. 50 325 6 50-324/ LICENSE NOS. DPR 71 & DPR 62 EMERCENCY PREPAREDNESS EXERCISE SCOPE A';D OBJECTIVES Centlemen:

Carolina Power 6 Light Company (CP&L) hereby submits the scope and objectives of the forthcoming Brunswick Steaa Electic Plant (BSEP),

Annual Emcrgency Preparedness Exercise.

The exercise is currently scheduled to conutence on October 18, 1988. A complete exereire scenario with controller information and simulation data vill be submitted no later than 45 days prior to the start of the exercise.

Please refer any questions regarding this submittal to Mr. Stephen D.

Flo)d at (019) 836 6901.

Yours very truly, 9 A l

Leonard I Loflin i

Man 3er Nuclear Liceltsing Section BAB/bab(epscope)

Enclosure cc:

Dr. J. Nelson Crace Mr. W. H. Ruland Mr. B. C. Buckley Mr. T. Decker (RII) t f

l 8311070032 690802 PDR ADOCK 05000324 I

F PDC l

dit toyettevne Street e P O On 1551 e Rale+e N C 2N2 g

I 4

ENC 14SURE 1 BRUNSVICK STEAM ELECTRIC k1 ANT, UNITS 1 AND 2 NRC DOCKETS 50 325 6 50 324 OPERATING LICENSES DPR 71 & DPR.62 EMERCENCY PREPAREDNESS EXEACISE SCOPE AND OBJECTIVES l

I

{

l

[

p 5

L El 3 I

i

o CAROLINA POWER fi LIC11T COMPANY PLAN FOR BRUNSWICK STEAM ELECTRIC PLANT EMERCENCY EXERCISE October 18, 1988 A.

Scopt A simulated accider.t at the Brunswick Steam Electric Plant (BSEP) which could escalate to a general emergency and will involve planned response and recovery actions to includet emergency classificationi notification of off-site organizations and plant personnell actions to correct the emergency conditionst and initiation of accident assessment and protective actions as necessary to cope with the accident. The exercise will simulate an emergency that results in off-site radiological releases which l

require responses by state and local government personnel, l

B.

Objsetives 1.

Demonstrate the ability of on-site personnel to effectively utilize the emergency action level scheme.

l 2.

Demonstrate the ability of on-site personnel to classify the l

emergency based on existing plant conditions.

1 3.

Demonstrate the adequacy of the control room staff in the ability to perform control and accident mitigation activities along with accident assessment.

l 4.

Demonstrate the adequacy of procedures for alerting, notifying, and mobilizing emergency response personnel (some individuals will be pre-staged within the local area).

5.

Demonstrate that communications capabilities exist to accomplish notification of off-site agencies.

6.

Demonstrate the ability to notify off-site authorities within l

15 minutes of the emergency classifiestion.

l 7.

Demonstrate the adequacy of the information provided in the initial notification, as well as follow-up notifications to the State and Counties.

8.

Demonstrate the ability of on-site personnel to formulate protective action recommendations based on pre-established criteria.

9.

Demonstrate ability of personnel to activate the TSC, OSC, EOF, and Plant Media Center as described in the emergency plat. (87-2HRC/pcj)

II.

SCOPS AND OBJECTIVES (Cont'd)

10. Demonstrate transfer of responsibility between emergency response facilities as described in the plan and procedures.

i

11. Demonstrate the ability to communicate between emergency response facilities.

l

12. Demonstrate the adequacy of the Operations Support Center in providing manpower support and coordination.
13. Demonstrate the adequacy of the Technical Support Center in providing accident assessmet and mitigation, dete assessment, and communication /notificas on activities.

l 14.

Demonstrate the adequacy of the EOF in coordinating off-site utility activities.

15. Demonstrate recordkeeping requirements as described in the plan and piacedures.
16. Deronstrate 6 hat status boards are maintained and updated.

[

17. Demonstrate the ability to provide adequate radiation protection services such as dosimetry and personnel l

l monitorings j

18. Demonstrate the capability to perform radiological monitoring activities and assessments.

)

19. Demonstrate the ability to support the radiological assessment process while maintaining personnel radiation exposure as-low-as-reasonably achievable (A1. ARA).

F i

20 Demonstrata che assessment c radiological consequeness of the i

accident t.nd of any releases of radioactive material to 4he environment, t

4 l

21. Demonstrate the activation, operation, and reporting of the f

field monitoring teams within and beyond the site boundary.

t

22. Demonstrate the ability to perform on-site accountability

[

within 30 minutes from the time of the ceder for i

accountability.

j

23. Demonstrate the ability to provide safe on-site access to off-site emergency services and/or support personnel (normal i

security access prccedures will be adhered to).

l r

l

( (87-2HRC/pej)

I

l e

I e

II.

SCOPE AND OBJECTIVES (Cont'd) 24 Demonstrate the ability of onsite personnel to respond to a medical emergency involving a contaminated individual.

23. Demonstrate the adequacy of the interface between off-site Smergency Medical Services (rescue squad) personnel and the l

plant personnel (transportation off-site sill be simulated).

l

26. Demonstrate the ability to coordinate news releases with state and county personnel.