May 27, 1986 DIST1(IBUTION:
d ocket No. 50-373 NRC PDR Docket No. 50-373 Local PDR BWD-3 r/f EAdensam Mr. Dennis L. Farrar EHylton Director of Licensing ABournia Commonwealth Edison Company RBernero P.O. Box 767 Attorney, OELD Chicago, IL 60690 JPartlow EJordan
Dear Mr. Farrar:
BGrimes ACRS (10)
Subject:
Relief Granted for Certain Portions of the La Salle County Station, Unit 1 Inservice Testing Program for Pumps and Valves In the staff's Safety Evaluation Report dated March 1981, and License Condition 2.C.(9) for the La Salle County Station, Unit 1, we stated that we had not com-pleted a detailed review of your pump and valve inservice testing (IST) program, and an interim relief was granted from certain pump and valve testing require-ments for that portion of the 120-month period until the staff completed its review of the program.
This review has now been completed and the enclosed Safety Evaluation Summary,, was prepared by the staff. This Safety Evaluation Summary is based on your submittals up to October 11, 1985, and the review and evaluation is based upon the technical assistance from our contractor, Idaho National Erigineering Laboratory (EG&G Idaho, Inc.).
The program included requests for relief from the testing requirements of Section XI, Rules and Inservice Inspection of Nuclear Power Plant Components of the ASME Coiler and Pressure Code. Relief has been granted for those testing requirements found to be impractical to perform which would not compromise the safety of the facility.
Relief has been denied in some cases. Relief has been granted for certain testing requirements with a condition as described in the Safety Evalua-tion Summary, Enclosure 1, and Safety Evaluation Report, Enclosure 2.
In such cases, relief is granted subject to the stated condition.
Accordingly, relief from certain requirements of Section XI of the ASME Code is hereby granted, as described in the enclosed Safety Evaluation Summary; and the IST program for pumps and valves for la Salle County Station, Unit 1 should be revised accordingly.
8606040191 860527 DR ADOCK 05000373 PDR L-If you should have any cuestions, please contact Anthony Bournia, Pro.iect Manager at (301) 49?-8698.
Sincerely,
/S/
Elinor G. Adensam, Director BWR Pro.iect Directorate No. 3 Division of BWR Licensino
Enclosure:
As stated cc: See next page J
BWD-3:DRL L
DBL Q ELD, D
3:DRL ARournia/hmc E
' ton E ensam j
f/ 7 /86 g /86 5t&/86 5/g86
r Mr. Dennis L. Farrar La Salle County Nuclear Power Station Commonwealth Edison Company Units 1 & 2 cc:
Philip P. Steptoe, Esquire John W. McCaffrev Suite 4200 Chief, Public Utilities Division One First National Plaza 160 North La Salle Street, Room 900 Chicago, Illinois 60603 Chicago, Illinois 60601 Assistant Attorney General 188 West Randolph Street Suite 2315 Chicago, Illinois 60601 Resident Inspector /LaSalle, NPS U.S. Nuclear Regulatory Commission Rural Route No. 1 Post 0Ffice Box 724 Marseilles, Illinois 61341 Chairman La Salle County Roard of Supervisors La Salle County Courthouse Ottawa, Illinois 61350 Attorney General 500 South 2nd Street Springfield, Illinois 62701 Chairman Illinois Commerce Commission leland Ruildino 527 East Capitol Avenue Springfield, Illinois 62706 Mr. Gary N. Wright, Manaaer Nuclear Facility Safety Illinois DeDartment of Nuclear Safety 1035 Outer Park Drive, 5th Floor Sprinofield, Illinois 62704 Regional Administrator, Region III U. S. Nuclear Regulatory Commission 799 Rossevelt Road Glen Ellyn, Illinois 60137