Informs of 700915-16 Insp at Plant.Qc & Nondestructive Testing of Liquid Holdup Tank Failed to Meet Licensee Commitments.Welding Procedures & Welder Qualifications for Two Welders Met Requirement Section IX of ASME Code
ML20195D272
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/09/1970
From: Kelly W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20195C961 List:
References
FOIA-88-156 NUDOCS 8806230084
Download: ML20195D272 (1)


Text

_ _ - _ - _ _ _

h.s

[a'

*e UNITED STATES s

ATOMIC ENERGY COMMISSION l e{

(o ja i

OlVISION OF COMPLIANCE j

REolON 11

  • sulTE 818 230 PE ACNTREE sT A EE T.

N oR T N W E S T Tmm 12H S8 7 AT LANT A, ot omot A 30303 i

Octo ber 9,1970

\\

0. S. Sjen:er, Senior Reactor Inspector l

l Division of Jompliance, 22; ion V INS /EOTOR'S EVALLATION AND 0/1NI0N - JAOIFIO CAS AND ELECTRIO 00MPANY (din 3LO OANYON NLOLEAR STATION LNITS 1 AND 2), SAN LUIS OBISPO OOUNTY, 0ALIFORNIA An announ:ed inspection was performed at Diablo Oanyon on Septeraber 15-16, 1970, to review the wolding and nondestructive testing of the liquid holdus tanks and reactor containnent linor.

The quality control, nondestructive testing, waldins jrocedure qualifi-

stion, and woldor qualification of the reactor containment liner meet the licensee's commitments in his FSAR,Section IX of the ASME Oade, and those paragraphs referen:cd in Section VIII of the ASME Oode.

The quality cont rol and nondestructive testing of the liquid holdup tank did not reet the licensee's co:r.itments.

Lx:essive grinding of the weld reinforcement and the base material adjacent to the weld require ultrasonic measurement of the base c.aterial thickness and an engineering justifiestien for a:ceptance of the thin natorial. The dye jenstrant examination of the ground root pass was not :enducted correctly in that the ex:ess dye was not removed f rom the area being examined and the developer was being applied too lightly in a high wind and being witnessad by a licensee's inspector who had no training l

in dye,,enet rant examinat ion. This rafle:ts en the f abri:stor 's, tittsburgh - Des Moines Steel Oompany, quality control and the l

licensee's quality assurance groe, ram.

l l

The welding sto:cduros and weldor qualif t:ations for th. two weldors welding the liquid holdug tank ;et the re quirements c f Section IX of the AS2 Jode.

[d//

'1.

D. Kelley 00 :!I tk DP.

RJa:ter Insje: tor

f..:. Lon';, X :II 8806230084 880615 PDR FOIA MCMILLA88-156 PDR l[/