ML20195C827

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-445/88-35 & 50-446/88-34 on 880504-0607.No Violations or Deviations Noted
ML20195C827
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/13/1988
From: Warnick R
NRC OFFICE OF SPECIAL PROJECTS
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20195C830 List:
References
NUDOCS 8806220291
Download: ML20195C827 (5)


See also: IR 05000445/1988035

Text

_

._

_ _ _ _ _ .

- _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _

- __ _ _ - _ _ _ - _ - .

,

'

,

.

JUN l 31988

-

In Reply Refer To:

Dockets:

50-445/88-35

50-446/88-34

TU Electric

ATTN:

Mr. W.

G. Counsil

Executive Vice President

400 North Olive Street,' Lock Box 81

Dallas, Texas

75201

Gentlemen:

This refers to the inspection conducted by Mr. C. Hale and other

inspectors.and NRC consultants during the period May 4

through June 7, 1988, of activities authorized by NRC Construction

Permits CPPR-126 and CPPR-127 for the Comanche Peak Steam Electric

Station, Units 1 and 2, and 'o the discussion of our findings with

you and other members of your staff at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection.

Within these areas, the inspection

consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the

inspectors.

Within the scope of the inspection, no violations or deviations

were identified.

In accordance with 10 CFR 2.790 of the Commission's regulations, a

copy of this letter and the enclosed inspection report will be

placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will

be pleased to discuss them with you.

Sincerely,

ORIGINAL SIGNED BY R. F. WABmCK

8806220291 880613

PDR

ADOCK 05000445

R.

F. Warnick, Assistant Director

G

PDR.

for Inspection Programs

Comanche Peak Project Division

Office of Special Projects

Enclosure:

Inspection Report 50-445/88-35; 50-446/88-34

cc w/ enclosure:

See next page

IP:CPP

OSP

IP:CP

P

IP:CPPD:0 P

AD:IP:CPPD:OSP

PWagner

CHale

HLivermor

RWarnick RFW

6/ g3 /88

6/fo/88

6/f0/88{

6/13 / 8 8

-

.

-

'

\\

)

/

'o

UNITED STATES

!

h

NUCLEAR REGULATORY COMMISSION

5

j

WASHINGTON, O. C. 20E

kg*****j[

Jl.N i 31988

In Reply Refer To:

Dockets:

50-445/88-35

50-446/88-34

TU Electric

ATTN:

Mr. W. G.

Counsil

Execu.tive Vice President

400 North Olive Street, Lcok Box 81

Dallas, Texas

75201

Gentlemen:

This refers to the inspection conducted by Mr.

C. Hale and other

inspectors and MRC consultants during the period May 4

through June */, 1988, of activities authorized by NRC Construction

Permits CPPR-126 and CPPR-127 for the Comanche Peak Steam Electric

Station, Units 1 and 2, and to the discussion of our findjngs with

you and other members of your staff at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection.

Within these areas, the inspection

consisted of selective examination of procedures and representative

records, interviews with personnel, ar.d observations by the

inspectors.

Within the scope of the inspection, no violations or deviativns

were identified.

In accordance with 10 CFR 2.790 of the Commission's regulations, a

l

copy of this letter and the enclosed inspection report will be

placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will

be pleased to discuss them with you.

Sincerely,

!

R F/D A

R.

F. Warnick, Assistant Director

for Inspection Programs

Comanche Peak Project Division

l

Office of Special Projects

Enclosure:

)

Inspection Report 50-445/88-35; 50-446/88-34

cc w/ enclosure:

see next pagc

L

_

_

,. ,,

-..

.

.\\

.

TU Electric

.

cc:

Roger D. Walker

Nancy H.. Williams

Manager, Nuclear Licensing

CYGNA Energy Services

' Texas Utilities Electric Company

Suite 390

Skyway Tower

2121 N.

California Blvd

.

400 North Olive Street,

L.B.

81

Walnut Creek, CA

94596

Dallas, TX

75201

Robert A. Wooldridge, Esq.

Juanita Ellis

Worsham, Forsythe, Sampels

President - CASE

and Wooldridge

1426 South Polk Street

2001 Bryan Tower

Dallas, TX

75224

Suite 2500

Dallas, TX

75201

Susan M. Theisen

Assistant Attorney General

Mr. Homer C.

Schmidt

Environmental Protection Division

Director of Nuclear

P.O.

Box 12548, Capitol Station

Services

Austin, TX

78711-2548

TU Electric

Skyway Tower

Administrative Judge Peter Bloch

400 N. Olive St.,

L.E.

81

U.S.

Nuclear Regulatory Commission

Dallas, TX

75201

Wachington, DC

20555

Elizabeth B. Johnson

Kenneth A. McCollom

Administrative Judge

Administrative Judge

Oak Ridge National Laboratory

1107 West Knapp

Post Office Box X, Building 3500

Stillwater, OK

74075

Oak Ridge, TN

37830

GDS Associates, Inc.

Jack R. Newman, Esq.

1850 Parkway Place, Suite 720

Newman & Holtzinger,

P.C.

Marietta, GA

30067-8237

1615 L Street,

N.W.,

Suite 2000

Washington,

D.C.

20036

Mr. R. W.

Ackley

Stone & Webster Engineering

Walter H. Jordan

Corporation Project Mgr.

Administrative Jtige

CPSES

881 West Outer Drive

Post Office Box 1002

Cak Ridge, Tennesee

37830

Glen Rose, Texas

76043

Anthony Z. Roisman, Esq.

Mr. J.

L. Vota

suite 600

Westinghouse Electric

1401 New York Avenue, N.

W.

Corporation

Mashington, DC

20005

Post Office Box 355

Pittsburgh, PA

15230

Ms. Billie Pirnar Carde, Esq.

Government Accountability Project

Lanny A.

Sinkin

Midwest Office

Christic Institute

104 East Wisconsin Avenue

1324 N.

Capitol Street

Appleton, WI

54911

Washington, DC

20002

-

.

.

-.

,

.

.

-.

..

.

.

.

TU Electric

,

cc:

(continued)

David R. Pigott, Esq.

Orrick, Herrington & Sutcliffe

600 Montgomery Street

San Francisco, CA

94111

Robert Jablon

Bonnie S.

Blair

Spiegel & McDiarmid

1350 New York Avenue, NW

Washington, DC

20005-4798

George A. Parker, Chairman

Public Utility Committee

Senior Ultizens Allianco of

Tarrant County, Inc.

6048 Wonder Drive

Fort Worth, TX

76133

Joseph F.

Fulbright

Fulbright & Jaworski

1301 McKinney Street

Houston, TX

77010

Mr. Jack Redding

c/o Bethesda Licensing

TU Electric

3 Metro Center, Suite 610

Bethesda, MD

20814

William A. Burchette, Esq.

Counsel for Tex-La Electric

Cooperative of Texas

Heron, Bur:hette, Ruckert &

Rothwell

Suite 700

1025 Thomas Jefferson St., NW

Washington, DC

20007

Regional Adninistrator, Region IV

U.S. Nuclea.: Regulatory Commission

611 Ryan Pl.tza Drive, Suite 1000

Arlington, '.?cxas

76011

I

t'

_

'

,

s

.

-

50-445/29-3S; 50-446/99- H

DISTRIBUTION:

, , . . a . . , - .e -

.,.x.

,

.,

LDocket(FilesL(50-4_45/446)

NRC PDR

Local PDR

OSP Reading

CPPD-LA

CPPD. Reading (HQ)

  • Site Reading File

AD for Projects

  • Sr. Lead Insp. - CONST.

OPS

-

  • Concurrence
  • MIS System, RIV
  • RSTS Operator, RIV

DRP, RIV

RIV Docket File

  • LShea, ARM /LFMB

JTaylor

SEbneter/JAxelrad

CGrimes

PMcKee

JLyons

JWilson

JMoore, OGC

JGilliland, RIV

FMiraglia

EJordan

JPartlow

BHayes

  • w/766

f

!

!

l

l

[

, - . . . . _ . - . -

.. . -

.

-

.. -- -

- . . . - . - - - - - - - -

- - - -

---

--