May 27,1986
~
4 Docket No. 50-293 LICENSEE:
Boston Edison Company FACILITY:
Pilgrim Nuclear Power Station
SUBJECT:
MEETING WITH ROSTON EDISON COMPANY CONCERNING PLANT RESTART ISSUES On May 19, 1986, I attended a Region I meeting at King of Prussia, Pennsylvania, with Boston Edison Company. The purpose of,the meeting was to discuss the licensee's May 15, 1986, report to the Regional Administrator, which was sub-mitted in response to Confirmatory Action Letter 86.10.
The following three problem areas were covered: (1) intersystem leakage through the motor-operated injection valves of,the residual heat removal system, (2) primary containment isolation which occurred during repositioning of the made switch, and (3) failure of the outboard main steam isolation valves to reopen after resetting the primary containment isolation valves.
Details concerning the licensee's analysis" and actions' to resolve these problems are included in the licensee's report. ' Region I will issue a summary of the dis-cussions and conclusions reached at the meetina.
Some items of repair and maintenance remain to be completed before restart and this work is proceeding more slowly than normal because of the current strike 1
by union members. Subject to authorization by the Regional Administrator, restart of Pilgrim Station is currently expected about May 78, 1986.
ORIGINAL 810.NMD Ny Paul H. Leech, Project Manager BWR Project Directorate No. 1 Division of BWR Licensing 3
~
cc: See next page r
DISTRIBUTION,_
f i DocketJ11e;.i? PLeech
"~ NRC PDR
' CJamerson Local PDR OELD i
PQ#1 Reading EJordan JZwolinski BGrimes ACRS (10)
BWD-1: DBL L D:BWD-1: DBL Pleech/hmc JZwolinski 9
5/ 11/86 5/03/86 8605300553 860527 PDR ADOCK 05000293 S
PDR n
7
O 4
Boston Edison Company Pilgrim Nuclear Power Station cc:
Mr. Charles J. Mathis, Station Mgr.
Boston Edison Company RFD #1, Rocky Hill Road Plymouth, Massachusetts 02360 Resident Inspector's Office U. S. Nuclear Reculatory Commission Post Office Box 867 Plymouth, Massachusetts 02360 Chairman, Board of Selectmen 11 Lincoln Street Plymouth, Massachusetts 02360 Office of the Commissioner Massachusetts Department of Environmental Quality Engineering One Winter Street Boston, Massachusetts 02108 Office of the Attorney General 1 Ashburton Place 19th Floor Boston, Massachusetts 02108 Mr. Robert M. Hallisey, Director Radiation Control Program Massachusetts Department of Public Health 150 Tremont Street Boston, Massachusetts 02111 J
Regional Administrator, Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Mr. James D. Keyes Boston Edison Company 25 Braintree Hill Office Park Braintree, Massachusetts 02184 William D. Harrinaton Senior V1ce President, Nuclear Boston Edison Company 800 Boylston Street Boston, Massachusetts 02199
_ _ _ _ _ _ _ __ - _____ _ __ ______ _______ _____