l-MAY 2 21986 Docket No. STN 50-482 Kansas Gas and Electric Company ATTN: Mr. Glenn L. Koester Vice President - Nuclear P.O. Box 208 Wichita, KS 67201 Gentlemen:
4
Subject:
Wolf Creek 1 OL Review Costs - Invoice Numbers D0167 and E0555 Thank you for your letter dated April 11,1986, expressing concern that you might have been billed for review costs that should have been divided between Wolf Creek 1 and Callaway 1.
It was your position that since both facilities are SNUPPS plants utilizing the same standardized design, the two plants should have basically required only one review with the costs split between the two facilities.
The full cost for the Callaway 1 review through June 23, 1984, exceeded that of Wolf Creek 1 in that Callaway's cost was $2,575,233, while Wolf Creek's cost through the same period was $2,073,055. Enclosed are summary sheets showing the cost by major program office for each of the two facilities. Union Electric Company received their 5% operating license (0L)onJune 11,1984. This happened before the June 20, 1984 revision to Part 170 became effective which increased operating license fees from " full cost up to $1,024,500" to " full cost up to $3,077,400".
Therefore, Union Electric Company paid the maximum operating license fee of $1,024,500 required by the regulations in effect at the time the initial OL was issued even though the cost of the Callaway 1 OL review substantially exceeded the fee which was paid.
Examples of the method used by the NRR review staff for common reviews are contained in the enclosed " Contractual / Consultant Cost Data" sheets for Contract A0245 and A0409 where $42,000 and $43,560, respectively, were assigned to each of the two facilities. When a review has applicability to more than one facility, the staff hours and contractual costs are divided accordingly.
8605300006 860522 i
PDR ADOCK 05000482 p
i 1
2 MAY 2 21986 We re5 ret the delay in responding to your letter and hope that the enclosed documents are responsive to your concerns.
If we can be of further assistance, please let us know.
\\
Sincerely, ped. C. Jame: getjeway, j,,
4
. C. James Falloway, Jr.
Acting Director License Fee Management Staff s
Office of Administration
Enclosures:
1.
Wolf Creek 1 Cost Summary Sheet 2.
Callaway 1 Cost Summary Sheet 3.
Contractual Data Sheets (2)
~
4 DISTRIBUTION w/encis:
PDR LPDR Reg Dockets (2)
LSolander, PRAB, NRR P0'Connor,'DPLA/ PAD-4 CJHolloway RMDiggs (2)
LFMS A/M - Wolf Creek & Callaway LFMS R/F c
7 0FFICE :LF 2ADM
- LfMS:A 29-- _-:- --- ------:---------- :------------:------------:------------:
SURNAME :
iggs:JP :C&T ow
_________: ___________:_ 4_
___ay____:____________:____________:____________..._____
DATE :5/.U /86
- 5/ SJ/86
.c
m Kansas Gas & Elcctric Company Operating License Review Costs Through June 23, 1984 FACILITY: WOLF CREEK 1 DOCKET NO.: 50-482 Costs Per Professional i
f Program Office Professional Staff-hours Staff-hour Contractual Total Review Staff-hour Expended Costs Costs Costs l
1.
MRR
$39 19,715.4
$768,901
$583,958
$1.352,859 l l
2.
IE-HQ 36 657.0 23,652 18,797 42,449 3.
REGIONS 36 16.422.3 591,203 591,203 l
4.
ACRS 50 964.8 48,240 48,240 38,304 5.
NMSS 38 1,008.0 38,304
$2,073,05@1 Total Cost:
i
{
I, I
r Estewers /
Union Electric Company Operating Lf:ense Review Costs Through October 10,1984 (1005 Power) 1 Standardized Design - Duplicate Unit i
FACILITY: Callaway 1 DOCKET WD. 50-48.3 Costs Per Professional Program Office Professional Staff-hours S ta ff-hour Contractual Total Review Sta f f-hou r' Expended Costs Costs Costs 1.
NRR(before 6/23/84)
$39 24,601.6
$959,462
$605.433 11.562,900 NRR (6/23/84 & after) $62 827.6 51,305 51,305 2.
IE-HQ 36 583.0 20,988 56,300 77,238 s
3.
REGIONS 36 24,334.7 876,049 876,049 4.
ACRS (before 6/23/84) 50 486.1 24.305 24,305 ACRS(6/23/84 & After) 62 2,0 124 124 5.
2 15 s 38 860.3 32.691 32,691 I
Total Cost:
$2.626,66 1/
The total cost of $2,626,662 exc'eeds the maximum fee of $1,024,500 as stated in 10 CFR 170.21 A.2., as revised March 23, 1978, for standardized design - duplicate unit review.
is due from the licensee.In accordance with Footnote 3 of 10 CFR 170.21 no N
b U D
']
p k)
U, 4
f'
... Inclosure 3,.
.y.
gY Contractual / Consultant Cos_t _ Data p
Plant Name: SuuPPs : Gil af I,WelfcCreck i Docket No: 5o-493,492.
A Lab / Consultant:
- t. t n t FIN No: Acs46 Branch: c5 6 Project Manager / Monitor; Y.sw"6 TACS Not Topical Report No:
Vendor:
Brief Description of Task:
OL Res;ev Services Related to (a)
Safety 94,ooo
+g.
4,ooo (b)
Environmental i
p och I'"f (c).
Ar.titrust m v 4 49 h L. V.
(d)
Safeguards 3 w.t.
(e)
Operator Licensing Exaras 1.
Initial Hot / Cold 2.
Requalification 3.
Replacement 4.
Certification (f)
Hearing
~
1.
Contested 2.
Non-Contested (g)
Other (identify)
I' (h)
Topical Report 0
Total Cost 843soo i
7%
g-m u
-l bDe/lsasa.3 0
U~
h!AT. io251. LAs. Tec R. Es.?sfIc. 5.. __..
- / 18 F
~
~ ' ~
_.__. OL..C A S E R EV I E W S....
..' _l __
~P (
f a.
30 c1W
~
p/e n.f -
_....a.% h E L. _
S.R L._..L..L..N.. LO R..N..L..__
g A2Io7 +A2115 B 4 Io 1 A0409 Bo72 5
, B e Ile b 4e. p 74, <. oo Sqcon }3a h4. s, 2.
5 I, I..o o --
43, S 6 0-6 f 4 4 b.._
Ca+ w bri,1.
t o 2, s. o o. _
Clink s,L 7W,6 o o...
Comx. Peak o 6 7, 3 c o._...
&and Guy yt.
@,96o 85, O c o.
- =.. _.
l Pale b 4 p,3
_. 2, 8 o o _..
Penq s,1
- 1. 8, i o.o...
Rwe<Se.nd p.
S'I, 8 o a.
l
. Seabrock. I,L
. 59, 90o _-
. -.. -... -.... {
l
. Sc.T4.G.S 1; t 3 4, 3 0.0._.
- 3, SY, o Fo, M2..
=. _
hlaherNrcf %
4 (c.~l.O 0>.
85, C00 4 5, S 4 o.
6*i>095_..
V)PN -?..
[aiIa w J....
.W_5,76 o_
VJoI4 Creek...I ys sso j
.j Susquehann'a L.
76,4sI
-. - _. l s
i fu~nd.s Exp..
...bl4.;.1 oo..__ no a os. 2. 1.1,8c.o...
28 5_>'n..(._.
3
. _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _