ML20195B958
| ML20195B958 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 10/24/1988 |
| From: | Mccoy F NRC OFFICE OF SPECIAL PROJECTS |
| To: | White S TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML20195B962 | List: |
| References | |
| NUDOCS 8811020269 | |
| Download: ML20195B958 (2) | |
See also: IR 05000259/1988031
Text
. _ .
__
_ _ _ _
_ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _
o
e
-
, ' .
,
J:
i:
.
OCT 2 41999
Docket Nos. 50-259, 50-260, 50-296
License Nos. OPR-33, OPR-52, OPR-68
j Mr. S. A. White
Senior Vice President, Nuclear Power
Tennessee Valley Authority
6N 3SA Lookout Place
1101 Market Street
'
Chattanooga, TN 37402-2801
Dear Mr. White-
,
SUBJECT:
NRC INSPECTION REFORT N05. 50-259/88-31, 50-260/88-31, AND
50-296/88-31
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
l
,
l
A. J. Ignatonis on July 19-22 and September 7-8, 1938. The inspection included
,
I
a review of activities authorized for your Browns Ferry facility.
At the
l
!
conclusion of the inspection, the findings were discussed with those members
l
of your staff identified in the enclosed inspection report.
[
i
l
The area examined during the inspection was your implementation of the remaining
!
open Regulatory Performance Improvement Program (RPIP) action items. Actions
i
l
required for closure of the RPli short-term and long-term action items are
i
described in your Browns Fm, b: lear Performance Plan, Volume 3. Appendix A,
,
Revision 1.
Within this area, the inspection consisted of selective examinations
l
of procedures and representative records, interviews with personnel, and
'
observation of activities in progress.
.
1
Vithin the scene of the inspection, no vio1&tions or deviations were identified.
,
I
In accordance with Section 2,790 of the NRC's "Rules of Practice," Part 2
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Dotwent Room.
.
l
l
Should you have any questions conc.frning this letter, please contact us.
1
l
Sincerely,
i
'
l
i
l
$@[0hh,!
9
Frank R. McCoy, Assistant Director
for TVA Inspection Programs
Q
,
TVA Projects Division
l
Office of Special Projects
'
Enclosure:
(See page 2)
,
,
!
k
i
fjTCl
I
-
- -
.
- - .
- - -
'
O
'
OCT 9 41933
Mr. S. A. White
2
.
Enclosure:
NRC Inspection Report
cc w/ encl:
J. A. Kirkebo, Vice President,
Nuclear Engineering
I C. Mason, Acting $tte Director
Browns Ferry Nuclear Plant
d L. Gridley, Director
Nuclear Safety and Licensing
J. May, Site Licensing Manager
. G. Walker, Plant Manager
vWA Representative, Rockville
Office
d eneral Counsel, TVA
State of Alabama
c w/ enc 1:
. G. Partlow, OSP
. D. Richardson, OSP
S. C. Black, OSP
D. Liaw, OSP
, E. Gears, OSP
D. Moran, OSP
W. S. Little, OSP/RII
Ar H. Johnson, OSP/RI!
W. Rutberg, OGC
A C Resident Inspector
NRC Occument Control Desk
l
1
l
l
l
OSP/RII
OSP/
AJIg'n)L/
M
torts:ht
W$liptie
ION //SS
10/' /88
l