6.0 ADMINISTRATIVE CONTROLS 6.1 RESPONSIBILITY 6.1.1 The Executive Director, ANO Site Operations shall be responsible for overall. facility operations and shall delegate in writing the succession to this responsibility during his absence.

6. 2 ORGANIZATION 6.2.1 0FFSITE AND ONSITE ORGANIZATIONS Onsite and offsite organizations shall be established for unit operation and corporate management, respectively.

The onsite and offsite organizations shall include the positions for activities affecting the safety of the nuclear power plant.

a.

Lines of authority, responsit:11ty, and communication shall be established and defined for the highest management levels through intermediate levels to and including all operating organization pos i ti or.s.

These relationships shall be documented and updated, as appropriate, in the form of organization charts, functional descriptions of departmental responsibilities and relationships, and job descriptions for key personnel positions, or in equivalent forms of documentation.

These requirements shall be documented in the QA Manual Operations.

b.

The Executive Director, AN0 Site Operations, shall be responsible for overall unit safe operation and shall have control over those onsite 4.ctivities necessary for safe operation and maintenance of the plant.

c.

The Vice President, Nuclear Operations, shall have corporate responsibility for overall plant nuclear safety and shall take any measures needed to ensure acceptable performance of the staff in operating, maintaining, and providing technical support to the plant to ensure nuclear safety.

d.

The individuals who train the operating staff and those who carry out health physics and quality assurance functions may report to the appropriate onsite manager; however, they shall have sufficient organizational freedom to ensure their independence fiom operating pressures.

6.2.2 FACILITY STAFF Each on duty shift shall be composed of at least the minimum shift a.

crew composition shown in Table 6.2-1.

b.

At least one licensed Operator shall be in the control room when fuel is in the reactor.

ARKANSAS-UNIT 2 6-1 Amendment No. 5, 52, 57, 73 8806220046 880610 PDR ADOCK 05000366 P

DCD

_j

F s

c.

ht least two licensed Operators shall be present in the control room during reactor start-up, scheduled reactor shutdown and during recovery from reactor trips.

d.

An individual qualified in radiation protection procedures shall be on site when fuel is in the reactor, e.

All CORE ALTERATIONS shall be directly supervised by either a licensed Senior Reactor Operator or Senior Reactor Operator Limited to Fuel Handling who has no other concurrent responsibilities during this operation.

f.

A site Fire Brigade of at least 5 members shall be maintained onsite at all times.

The Fire Brigade shall not include 3 members of the milimum shift crew necessary for safe shutdown of the unit and any personnel required for other essential functions during a fire emergency.

g.

Administrative control shall be established to limit the amount of overtime worked by plant staff performing safety related functions.

These administrative controls shall be in accordance with the guidance provided by the NRC Policy Statement on working hours (Generic letter No. 82-12).

h.

The Operations Superintendent and Shift Supervisor shall hcid a senior reactor operator license.

The Plant Operators and Assistant Plant Operators shall hold a reactor operator license.