Proposed Tech Specs 4.6.4.1 Re Hydrogen Analyzers Surveillance Requirements
ML20195B682
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/02/1988
From:
LOUISIANA POWER & LIGHT CO.
To:
Shared Package
ML20195B660 List:
References
NUDOCS 8806210483
Download: ML20195B682 (3)


Text

.

CONTAINMENT SYSTEMS 3/4.6.4 CCMBUSTIBLE GAS CONTROL HYDROGEN ANALYZERS LIMITING CONDITION FOR OPERATION 3.6.4.1 Two independent containment hydrogen analyzers shall be OPERABLE.

APPLICABILITY:

MODES 1 and 2.

ACTION:

a.

With one containment hydrogen analyzer inoperable, restore the inoperable analyzer to OPERABLE status within 30 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, b.

With both containment hydrogen analyzers inoperable, restore at least one analyzer to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and comply with the requirements of ACTION a, or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS 1,

4.6.4.1 Each hydrogen analyzer shall be demonstrated OPERABLE by the performance of a CHANNEL FUNCTIONAL TEST at least once per 31 days, and at least once per 92 days on a STAGGERED TEST BASIS by performing a CHANNEL CALIBRATION using sample gases containing:

a.

Zero volume percent hydrogen, balance nitrogen.

b.

9.5 volume percent hydrogen, balance nitrogen.

8806210483 880602 PDR ADOCK 05000392 P

DCD I

WATERFORD - UNIT 3 3/4 6-34

1 1

4 b

i i

)

ATTACIOiENT B 4

PROPOSD

' ~

mac,mm o CONTAINMENT SYSTEMS 3/4.6.4 COMBUSTIBLE GAS CONTROL HYOR0 GEN ANALYZERS LIMITING CONDITION FOR OPERATION 3.6.4.1 Two independent containment hydrogen analyzers shall be OPERABLE.

APPLICABILITY:

MODES 1 and 2.

ACTION:

With one containment hydrogen analyzer inoperable, restore the a.

inoperable analyzer to OPERABLE status within 30 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, b.

With both containment hydrogen analyzers inoperable, restore at least one analyzer to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and comply with the requirements of ACTION a, or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS

4. 6/'4.1 ch by ogen anal er sh 11 b demons rated PERAB by he j

p forma ce of CHAN LF CTIO L TE at 1 st on per 1 da s, an at I ast nce pe 92 da s on STA ERED EST SIS b perfo ing CHAN L CA BRAT ON using ample ases ontafning:

2 Zero volume percent hydrogen, balance nitrogen.

a.

~<

b.

9.5 volume percent hydrogen, balance nitrogen.

4.6.4.1 At least once per 31 days each Hydrogen Analyzer shall be demonstrated OPERABLE by performing a CHANNEL CALIBRATION using sample gases containing a nominal: