ML20195B634
| ML20195B634 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 06/09/1988 |
| From: | Crutchfield D Office of Nuclear Reactor Regulation |
| To: | Bliss H COMMONWEALTH EDISON CO. |
| References | |
| TAC-68334, NUDOCS 8806210471 | |
| Download: ML20195B634 (3) | |
Text
- - -
s June 9, 1988 Docket No. 50-456 DISTRIBUTION.-
mDocketJ11e 1 OGC 1
NRC/ Local PDRs EJordan Mr. Henry E. Bliss DCrutchfiel JPartlow Nuclear Licensing Manager GHolahan' Plant File Commonwealth Edison Comptny LNorrholm
__ Post Office Box 767 LLuther Chicago, Illinois 60690
.SSands
Dear Mr. Bliss:
9
SUBJECT:
EMERGENCY TECHNICAL SPdQ FICATION CHANGE - BRAIDWOOD NUCLEAR STATION, UNIT 1 (TAC NO. 68334) s By letter dated June 2,1988, you requested an emergency Technical Specification change to Technical Specificay on 4.3.1.1. for the Reactor Trip System Instrumentation. This change extends on a one-time-basis, for Unit 1 only, the monthly surveillance interval for the Power Range Neutron Flux High Setpoint for an additional ten (10) days.
Per our telephone conference, the emergency Technical Specification change is required to allow CECO time to schedule and prepare for the cleaning of the thimble tubes which.have been blocked since May 10, 1988.
The staff has reviewed your evaluation and the justification provided in your submittal and find it acceptable. This letter confirms the verbal granting of an emergency Technical Decification change as described above for Unit 1.
This change to the Technical Specification will be in effect through June 15, 1988.
Sincerely, Or161nal signed by Donnis II, cme al f W t
Dennis M. Crutchfield, Director Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation CC:
See next page PDIII-2:PM PDIII-2 PBhp ADA'SM D
SSands:bj LLutj/88 h/g'/88 y ///88 Ga/8/ /88 er LNoiMolm GMTahan DC chfie d f /f /88 4 /v C
8806210471 880609 DR ADOCK 050 6
jo,,
UNITED STATES E
NUCLEAR REGULATORY COMMISSION g
j
- E WASHINGTON, D. C. 20655 June 9, 1988
%g.....,/
Docket No. 50-456 Mr. Henry E. Bliss Nuclear Licensing Manager Comonwealth Edison Company Post Office Box 767 Chicago, Illinois 60690
Dear Mr. Bliss:
SUBJECT:
EMERGENCY TECHNICAL SPECIFICATION CHANGE - BRAIDWOOD NUCLEAR STATION, UNIT 1 (TAC N0. 68334)
By letter dated June 2,1988, you requested an emergency Technical Specification change to Technical Specification 4.3.1.1. for the Reactor Trip Systen Instrumentation.
This change extends on a one-time-basis, for Unit 1 on' the montnly surveillance interval for the Power Range Neutron Flux High Se nt for an additional ten (10) days.
Per our telephone conference, the err sney Technical Specification change is required to allow Ceco time to schedule and prepare for the cleaning of the thimble tubes which have been blocked since May 10, 1988.
The staff has reviewed your evaluation and the justification provided in your submittal and find it acceptable. This letter confirms the verbal granting of an emergency Technical Specification change as described above for Unit 1.
This change to the Technical Specification will be in effect through June 15, 1988.
Sincerely, p
enn s M. Crutchfield Director Division of Reactor P ojects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation cc:
Ses next page
Mr. Henry Bliss Braidwood Station Comonwtalth Edison Company Units 1 and 2 cc:
Mr. William Kortier Ms. Lorraine Creek Atomic Power Distribution Route 1. Box 182 Westinghouse Electric Corporation Manteno, Illinois 60950 Post Office Box 355 Pittsburgh, Pennsylvania 15230 Douglass Cassel, Esq.
109 N. Dearborn Street Joseph Gallo, Esq.
Chicago, Illinois 60602 Hopkins and Sutter 1050 Connecticut Ave., N. W.
Elena Z. Kezelis, Esq.
Suite 1250 Isham, Lincoln & Beale Washington, D. C. 20036 Three First National Plaza Suite 5200 C. Allen Bock, Esq.
Chicago, Illinois 60602 Post Offices Box 342 Urbana, Illinois 61801 Mr. Charles D. Jones, Director Illinois Emergency Services Ms. Bridget Little Rorem and Disaster Agency Apoleseed Coordinator 110 East Adams Street 117 North Linden Street Springfield, Illinois 62706 Essex Illinois 60935 hichael Miller, Esq.
Mr. Edward R. Crass Sidley and Austin Nuclear Safeguards and One First National Plaza Licensing Division Chicago, Illinois 60603 Sargent & Lundy Engineers 55 East Monroe Street Chicago, Illinois 60603 George L. Edgar Newman & Holtzinger, P.C.
U. S. Nuclear Regulatory Comission 1615 L Street, N.W.
Resident Inspectors Office Washington, D.C.
20036 RR#1, Box 79 Braceville, Illinois 60407 Attorney General 500 South 2nd Street Regional Administrator, Region III Springfield, Illinois 62701 U. S. Nuclear Regulatory Comission 799 Roosevelt Road EIS Review Coordinator Glen Ellyn, Illinois 60137 EPA Region V 230 S. Dearborn Street Chainnan Chicago, Illinois 60604 Will County Board of Supervisors Will County Board Courthouse Joliet, Illinois 60434
.