ML20195B306
| ML20195B306 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 10/21/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Withers B WOLF CREEK NUCLEAR OPERATING CORP. |
| Shared Package | |
| ML20195B309 | List: |
| References | |
| NUDOCS 8811010497 | |
| Download: ML20195B306 (2) | |
See also: IR 05000482/1988025
Text
.
.
OCT 211988
'
'
In Reply Refer To:
Docket:
STN 50-482/88-25
Wolf Creek Nuclear Operating Corporation
ATTN: Bart D. Withers
President and Chief Executive Officer
P.O. Box 411
Burlington, Kansas 66839
Gentlemen:
This refers to the inspection cenducted by Messrs. H. Chaney and L. Ricketson
of this office during the period September 12-16, 1988, of activities
authorized by NRC Operating License NPF-42 for Wolf Creek Generating Station,
and to the discussion of our findings with you and other members of your staff
at the conclusion of the inspe:. tion.
Areas examined during the inspection included the radiation protection program
and your planning for the forthcoming refueling outage. Within these areas,
the inspection consisted of selective examination of procedures and
representative records, interviews with personnel, and observations by the NRC
inspectors. The inspection findings are documented in the enclosed inspection
report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of
Section 2.201 of the NRC's "Rules of Practice," Part 2, fitle 10, Code of
Federal Regulations. Your response should be based on the specifics contained
in the Notice of Violation enclosed with this letter.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragraph 2 of the enclosed report.
'
An unresolved item is identified in paragraph 12 of the enclosed report.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
,
Origimi Sigel IIT
A,11 liculi
L. J. Callan, Director
Division of Reactor Projects
Enclosures:
(see next page)
C:RPB f C
44t
RIV:FRPS
FRPS:RFBQ
C:FRPS:
PB/A
0:;
/% HDChaney/cz
LRicketson
REBaer
BMurray
DDCharrberlain
- a lan
- ' //.*/88
a /e /88
O/ /88
h
/88 p /d /88
to M /88
8811010497 801021
\\
ADOCK c'5000482
O
--- - - - - - - - - - - - - - -
n
.
e
,
,
Wolf Creek Nuclear Operating Corporation
-2-
,
i
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-482/88-25
3.
Attachment 1 - Documents Reviewed
4
Attach. ment 2 - Refueling Outage Person-Rem
Statistics
cc w/ enclosures:
Wol: Creek Nuclear Operating Corporation
,
'
ATTN: Otto Maynard, Manager
of Licensing
P.O. Box 411
Burlington, Kansas 66839
Wolf Creek Nuclear Operating Corporation
ATTN: Gary Boyer, Plant Manager
P.O. Box 411
Burlington, Kansas 66839
Kansas Corporation Commission
ATTN:
Robert D. Elliott, Chief Engineer
Fourth Floor, Docking State Office Building
Topeka, Kansas 66612-1571
Kansas Radiation Control Program Director
bec to DMB (IE06)
bec distrib. by RIV:
"RRI
R. D. Martin, RA
'Section Chief (DRP/A)
"DRP
'RPB-DRSS
8. DeFayette, RIII
- RIV File
SRI, Callaway, RIII
- MIS System
- RSTS Operator
- Project Engineer, DRP/A
Lisa Shea, RM/ALF
'P. O'Connor, NRR Project Manager
- DRS
- w/766
_.