ML20192A323

From kanterella
Jump to navigation Jump to search

Withholding Determination Form Proprietary Determination for the WCAP-18482-P/WCAP-18482-NP, Revision 0, Westinghouse Advanced Doped Pellet Technology (Adopttm) Fuel Topical Report
ML20192A323
Person / Time
Site: Westinghouse
Issue date: 07/20/2020
From:
Office of Nuclear Reactor Regulation
To:
Lenning K
Shared Package
ML20192A070 List:
References
EPID L-2020-TOP-0025, WCAP-18482-NP, WCAP-18482-P
Download: ML20192A323 (1)


Text

Office of Nuclear Reactor Regulation Topical Report Proprietary Information Withholding Determination Topical Report Information Review Information Report No.: Division/Branch: DSS/SFNB

Title:

WCAP-18482-P/WCAP-18482-NP, Revision 0, Project Manager: E. Lenning Westinghouse Advanced Doped Pellet Technology Reviewer(s): M. Panicker (ADOPTTM) Fuel ADAMS Accession No.: ML20132A014 EPID: L-2020-TOP-0025 Docket No.:99902038 Staff Determination of Acceptability The NRC staff has reviewed your application and the material in accordance with the requirements of 10 CFR 2.390. Based on the statements in the affidavit, the NRC staff has determined that the submitted information contains proprietary, commercial information and should be withheld from public disclosure.

X Therefore, the submitted information marked as proprietary will be withheld from public disclosure under 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

The NRC staff has reviewed your application and the material in accordance with the requirements of 10 CFR 2.390. Based on our review, we have concluded that the proprietary request does not comply with the requirements of 10 CFR 2.390.

Therefore, the NRC staff is denying the request to withhold the information under 10 CFR 2.390.

ADAMS Accession Numbers (Top row is for transmittal of this form)

Package: ML20192A070 Email: ML20192A243 This Form: ML20192A323 Incoming Letter: ML20132A014 Nonproprietary Version: ML20132A014 Basis for Denial Approval Printed Name Signature Date Technical Reviewer Mathew Panicker /RA/ 7/20/2020 Project Manager Ekaterina Lenning /RA/ 7/20/2020