ML20192A075

From kanterella
Jump to navigation Jump to search
July 1, 2019 Thru June 30, 2020 Summary of Changes, Tests, and Experiments
ML20192A075
Person / Time
Site: Aerotest
Issue date: 07/01/2020
From: Slaughter D
Aerotest
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
Download: ML20192A075 (1)


Text

AEROTEST OPERATIONS, INC.

3455 FOSTORIA WAY* SAN RAMON, CA 94583 * (925) 866-1212

  • FAX (925) 866-1716 July 1, 2020 AEROTEST RADIOGRAPHY AND RESEARCH REACTOR DOCKET NO. 50-228/LICENSE NO. R-98.

ATTENTION: Document Control Desk Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission White Flint North 11555 Rockville Pike Rockville, MD 20852-2738

Subject:

July 1, 2019 thru June 30, 2020 Summary of Changes, Tests, and Experiments Ladies and Gentlemen:

This letter summarizes ARRR operations from July 1, 2019 through June 30 2020. This submittal complies with the requirements set forth in 10 CFR 50.59, "Authorization of Changes, Tests, and Experiments'-'. In this time period, there were no reactor operations or experiments performed. Monthly operational characteristics normally reported (Operating-hrs., Monthly kW-h, Accumulated kW-h, Unscheduled shutdowns, etc.) do not exist given the circumstances. The ARRR core structure has been defueled since 2012.

A declaration of permanent shutdown leading to the decommissioning of the ARRR reactor was sent to the USNRC in a letter dated December 6, 2018. In that communication, a request was made to terminate all ongoing review activities conducted by the USNRC not related to the new declared direction. The proposed amendments to the existing license and technical specifications that reflect the situation of permanent shutdown and possession-only status were submitted and under review.

Should you have any questions or require additional information regarding this submission, please contact AO President David M. Slaughter, Ph.D. at (801) 631 5919 or dmsraven@gmail.com. I declare under penalty of perjury that the statements above are correct and truthful.

'\\{:ere!~ yr~ \\,,_' ____ _

David M. Slaughter, Ph.D.

President, Reactor Administrator, Manager Aerotest Operations, Inc.