ML20190A143
| ML20190A143 | |
| Person / Time | |
|---|---|
| Site: | 07201042 |
| Issue date: | 06/30/2020 |
| From: | TN Americas LLC |
| To: | Office of Nuclear Material Safety and Safeguards |
| Shared Package | |
| ML20190A135 | List: |
| References | |
| E-56684 | |
| Download: ML20190A143 (2) | |
Text
Enclosure 9 to E-56684 Listing of Computer Files Contained in Enclosure 10 Page 1 of 2 Disk ID No. (size)
Discipline System/Component File Series (topics)
Number of Files Enclosure 10 One Computer Hard Drive Total (20.4 GB)
Thermal (20.2 GB)
Thermal OS197FC-B TC with 61BTH Type 2 DSC Appendix B.4.5.6 ( LC 1 in Table B.4-9), in response to RAI 4-7 Folder: \\Thermal\\B.4.5.6\\1-OS197_TC-61BTH_TYPE2-LC1 Input and output files for the initial steady state normal hot indoor condition inside fuel handling building with HLZC 7 and no air circulation, using coarse mesh.
(ANSYS FLUENT Evaluation) 17 Appendix B.4.5.6 (LC 1-1 in Table B.4-9), in response to RAI 4-7 Folder: \\Thermal\\B.4.5.6\\2-OS197_TC-61BTH_TYPE2-LC1-1 Input and output files for the 15 hour1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> transient normal hot outdoor transfer condition with HLZC 7 and no air circulation, using coarse mesh.
(ANSYS FLUENT Evaluation) 17 Appendix B.4.5.6 (LC 1-2 in Table B.4-9), in response to RAI 4-7 Folder: \\Thermal\\B.4.5.6\\3-OS197_TC-61BTH_TYPE2-LC1-2 Input and output files for the 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> transient normal hot outdoor transfer condition with HLZC 7 and forced air circulation, using coarse mesh (ANSYS FLUENT Evaluation) 17 Appendix B.4.5.6 (LC 1-3 in Table B.4-9), in response to RAI 4-7 Folder: \\Thermal\\B.4.5.6\\4-OS197_TC-61BTH_TYPE2-LC1-3 Input and output files for the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> transient normal hot outdoor transfer condition with HLZC 7 without air circulation, using coarse mesh.
(ANSYS FLUENT Evaluation) 17 to E-56684 Listing of Computer Files Contained in Enclosure 10 Page 2 of 2 Appendix B.4.5.6 (LC 2-1 in Table B.4-9), in response to RAI 4-7 Folder: \\Thermal\\B.4.5.6\\2-OS197_TC-61BTH_TYPE2-LC2-1 Input and output files for the 15 hour1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> transient normal hot outdoor transfer condition with HLZC 7 and no air circulation, using fine mesh.
(ANSYS FLUENT Evaluation) 17