B-636 PRECURSOR DESCRIPTION AND DATA NSIC Accession Number:
150742 Date: June 22, 1979
Title:
Maifl Stock Sampling'System Lost at Peach Bottom 2 The failure sequence was:
- 1. During a severe electrical storm lightening struck at or near the Unit 2 main stack.
- 2. This resulted in initiation of HPCI and RCIC on Unit 3, tripped the unit 3 startup and emergency feed with emergency transfer to unit 2, and initiated a half scram in both units.
The ability to autostart HPCI and ROIC was lost on unit 3 due to the inverter supplying power to the HPCI and RCIC.
Corrective action:
- 1. The blown fuses in the inverter were replaced.
Design purpose of failed system or component:
Unavailability of system per WASH 1400: *HPCI:
8.8 x l0O2D RCIC:
8.0 xC lOUID Unavailability of component per WASH! 1400: *FUSES, Premature open: 1.10 6 /Hr.
Unavailabiliti es are In units of per demand D-1.
Failure rates are in units of per hour HR'1.
Lightning Struck The Main This Caused The Fuse In HPCI/RCIC Was Not Demanded Stack During An The Inverter Feeding During The 45 Minutes Electrical Storm HPCI/RCIC To Blow Requires To Replace The Fuses Potential Severe Core Damage A
No No, ADS/LPCI/CS were operable No ON NSIC 150742 -
Actual Occurrence of Main Stack Sampling System Lost at Peach Bottom 2
Potential Severe Core Damage No Yes No Yes Yes Yes Yes Sequence No.
1 3
0%
5 6
7 NSIC 150742 -
Sequence of Interest of Main Stack Sampling System Lost at Peach Bottom 2
'RCIC and HPCI were probably operable through a manual bus transfer and manual initiation.
B-639 CATEGORIZATION OF ACCIDENT SEQUENCE PRECURSORS NSIC ACCESSION NUMBER: 150742 DATE OF LER: July 20, 1979 DATE OF EVENT:
June 22, 1979 SYSTEM INVOLVED: HPCI/RCIC COMPONENT INVOLVED:
Inverter fuse CAUSE: Lightning striking at or near the mainstack during dn electrical storm.
SEQUENCE OF INTEREST:
Loss of Feedwater ACTUAL OCCURRENCE: Main Stack Sampling System Lost REACTOR NAME:
Peach Bottom 3 DOCKET NUMBER:
278 REACTOR TYPE:
BNR DESIGN ELECTRICAL RATING: 1065 Mwe REACTOR AGE: 5.9 yr VENDOR: General Electric ARCHITECT-ENGINEERS:
OPERATORS: Philadelphia Electric Company LOCATION:
Nineteen miles S of Lancaster DURATION:
5.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> PLANT OPERAT ING CONDITION:
100% power SAFETY FEATURE TYPE OF FAILURE:
Wa inadequate performance; (b) failed to start; Q)made inoperable; (d)____________
DISCOVERY METHOD:
Operational Event COM4MENT: RCIC & HPCI are fed from the same inverter